Study guide
25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing
Florida HVAC Contractor License Class A/B
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility
2 Establishing the Contracting Business
2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding
3 Insurance for Florida HVAC Contractors
3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules
4 Overhead, Staffing & Markets
4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services
5 Bids, Proposals & Estimating
5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing
6 Purchasing, Invoices, Draws & Safety Programs
6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)
7 Managing Contracts
7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk
8 Managing Trade Operations
8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory
9 Accounting I: Receivables, Payables & Cash
9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios
10 Accounting II: Taxes, Job Cost & Payroll
10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments
11 Managing Human Resources
11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees
12 Florida Contractor Law: Chapter 489 & 61G4
12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities
13 Florida Construction Lien Law (Chapter 713)
13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien
14 Financial Responsibility, CE & Federal Rules
14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules
15 Plans, Specs & Equipment Selection
15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness
16 Energy Codes, Loads & Thermal Resistance
16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves
17 HVAC System & Duct Design
17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes
18 Piping, Pumps, Boilers, Controls & Rigging Design
18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment
19 Sheet Metal Duct Fabrication
19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans
20 Split, Package & Heat Pump Installation
20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems
21 Large Systems, Chillers & Towers
21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems
22 Refrigeration, Coolers, Ventilation & Controls Install
22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests
23 Condensers, Compressors & Air Handlers
23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips
24 Duct, Fans, Filters & Terminals
24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances
25 Refrigerant Piping & Joining
25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing
26 Metering Devices & Line Components
26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories
27 Controls Installation
27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches
28 Motors, Wiring & Electrical Installation
28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe
29 Diagnostic Analysis: Refrigeration
29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments
30 Diagnostic Analysis: Electrical & Instruments
30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges
31 Recovery, Repair & Calibration
31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls
32 Mechanical Service & Cleaning
32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains
33 Jobsite Safety & Equipment
33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors
34 Energy Management
34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs
35 Indoor Air Quality
35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects
25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing
Key Takeaways Explain This Topic AI
Trade Area D (equipment component installation) is 14 percent of both the Class A and Class B trade exams; this chapter covers outline items on refrigerant piping, horizontally supported piping, copper tubing, other tubing, and refrigerant tubing under and over 2 inches.
FBC Mechanical 2023 Table 1107.4 lists field refrigerant pipe: copper tube ASTM B280 (Type ACR), B88, B819; copper linesets ASTM B280 / B1003; steel pipe ASTM A53 / A106. Soft annealed copper larger than 1-3/8 inch OD needs mechanical protection.
Size suction for pressure drop and oil-return velocity, liquid to avoid flash gas, and discharge for oil velocity; manufacturer equivalent-length tables govern split line sets, not leftover truck copper.
Industry oil-return practice is to pitch horizontal suction toward the compressor about 1/2 inch per 10 feet and to trap the base of a suction riser that lifts oil from a low evaporator.
Class A and Class B both install refrigerant piping under F.S. 489.105; Class B still stops at 25 tons cooling and 500,000 Btu heating in any one system.
Last updated: August 2026
25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing
Trade Area D — Equipment Component Installation — is 14 percent of both the Class A and Class B trade exams. After condensers, compressors, air handlers, and ducts (Chapters 23–24), the CILB outline asks you to install refrigerant piping , hang horizontally supported piping , work copper tubing and other tubing , and treat refrigerant tubing under 2 inches differently from tubing over 2 inches . The 2026 Air Conditioning CBT books that carry this cluster are Florida Building Code — Mechanical, 2023 Chapter 11, Pipefitters Handbook, 3rd Edition (1967) (R82), and Refrigeration & Air Conditioning Technology , 9th Edition (2021). Chapter 20 already hung a residential line set. This chapter is the piping system : materials, size, oil return, and the 2-inch split.
Quick Answer: Field refrigerant pipe is Type ACR copper ( ASTM B280 ) or another row on Table 1107.4 , not plumbing Type M off the hardware rack. Size liquid , suction , and discharge from equivalent length and oil velocity. Under 2 inches is typical line-set ACR; over 2 inches is hard-drawn ACR or steel. Pitch horizontal suction about 1/2 inch per 10 feet toward the compressor and trap a riser that must lift oil. Class B still caps at 25 tons / 500,000 Btu per system .
Why the pipe is part of the machine
A split air conditioner or heat pump is one listed circuit only after the field pipe is the right diameter, the right metal, and sloped so oil that left the compressor returns . Undersize the suction line and you eat capacity as saturation temperature drops, starve the compressor of mass flow, and drop velocity until oil sits in the evaporator. Oversize a suction riser at part load and the same oil never climbs. Undersize the liquid line and the pressure drop flashes liquid into the TXV, which then hunts. The exam will hand you a tonnage, a developed length, and a vertical offset and ask which tube you pull — not “whatever is on the truck.”
F.S. 489.105(3)(f) and (g) both include piping that completes the air-conditioning or refrigeration system. Class A is unlimited capacity. Class B is the same trade skill through 25 tons of cooling and 500,000 Btu of heating in any one system . A 16-ton supermarket rack with 2-1/8-inch suction is still Class B piping if each independent system stays under 25 tons. A single 30-ton circuit is Class A even if the copper looks like a line set. Class B candidates still need the theory of large pipe; the Class B outline drops 25–100 ton and centrifugal install clusters, not Trade D piping.
Ammonia (R-717) is not a copper circuit. FBC Mechanical 1101.1.2 sends ammonia to IIAR 2 through 5 and out of Chapter 11. Ammonia attacks copper and copper alloys. Steel pipe is the ammonia metal. Do not braze ACR onto an ammonia job and call it “the same refrigeration piping.”
Copper tubing versus other tubing — Table 1107.4
Air-Conditioning and Refrigeration (ACR) copper is seamless tube made for field refrigerant service. It is cleaned, dehydrated, nitrogen-charged, and plugged so the bore is not a plumbing store’s water pipe. ASTM B280 is the ACR specification. FBC Mechanical Table 1107.4 also lists copper tube to ASTM B68, B75, B88, B280, and B819 ; copper linesets to B280 and B1003 ; copper pipe to B42 / B302 ; steel pipe to ASTM A53 / A106 ; steel tube to A254 / A334 ; aluminum tube; and brass pipe. That table is the allowed-metal list. PVC, CPVC, and PEX are not on it — those plastics belong on condensate or hydronic work (Section 25.3), not in the refrigerant circuit.
Note a under Table 1107.4: soft annealed copper tubing larger than 1-3/8 inch OD shall not be used for field-assembled refrigerant piping unless it is protected from mechanical damage . Annealed (soft) coil is what you flare and bend by hand. Hard-drawn sticks are what you run for long, large, or exposed mains. The CILB under 2 inches / over 2 inches split is this shop change: a 7/8-inch suction is still a line-set problem; a 2-1/8-inch suction is a hard-drawn or steel main with different hangers and joints.
Do not confuse ACR OD sizes with plumbing nominal sizes. ACR is sold by outside diameter : 1/4, 3/8, 1/2, 5/8, 3/4, 7/8, 1-1/8, 1-3/8, 1-5/8, 2-1/8, 2-5/8, 3-1/8 inch. A 3/4-inch ACR tube is 3/4 inch outside . A 3/4-inch Type L plumbing tube is a different OD/ID pair. Reading a plumbing friction table as if it were an ACR suction chart is a failed size.
Type L (ASTM B88) shows up on some Division 23 specs as an allowed copper tube. Type M is the thin plumbing wall. Even though B88 is listed, the exam and the shop still want ACR or Type L wall , nitrogen-clean, not a wet Type M water coil that was never dehydrated. ASTM B819 is medical-gas cleanliness; it is listed, but you still size and trap it as refrigerant pipe.
- Product Spec / note Exam use
- ACR tube (hard or annealed) ASTM B280 ; dehydrated, N2 charged Default field refrigerant copper
- Copper lineset ASTM B280 / B1003 Factory-paired liquid + suction
- Copper tube B88 / B819 Listed in Table 1107.4 Allowed metal — still clean, still sized
- Soft annealed > 1-3/8 in. OD Table 1107.4 note a Protect from mechanical damage or use hard-drawn
Steel pipe ASTM A53 / A106 ; Type F not for lines below −20°F Large mains, ammonia (IIAR), some high-pressure work
- Plastic (PVC/CPVC/PEX) Not in Table 1107.4 Condensate / hydronic only
- Sizing liquid, suction, and discharge
A split line set is sized from the manufacturer’s equivalent-length table , not from a statewide “3/8 and 3/4 for 3-ton” habit. Equivalent length is measured pipe plus the handbook/manufacturer allowance for each elbow, valve, and fitting. Four 90° elbows on a 40-foot run are not 40 feet.
Suction (vapor) line. Size for two jobs at once: keep pressure drop from stealing capacity (a common design target is on the order of 2°F of saturation drop, using the manufacturer’s table), and keep velocity high enough that oil stays in the vapor stream, especially in upflow risers . Horizontal suction can run slower than a riser; a riser that is one size too large at 30 percent compressor capacity is an oil-logged evaporator waiting for a warranty call.
Liquid line. Size so the pressure drop does not flash liquid before the metering device. Subcooling at the condenser is the margin. A long, hot Florida attic run on an undersized liquid line eats that subcooling and the TXV hunts. Heat-pump liquid lines see reversed roles (Chapter 20); size both legs to the manufacturer.
Discharge (hot-gas) line. Keep velocity high enough to carry oil to the condenser, but not so high that you hammer the discharge valve. Slope a horizontal discharge toward the condenser. A discharge loop (inverted trap) at the compressor outlet on some systems keeps liquid from draining back into the head during the off cycle.
Worked example. A Class B 5-ton R-410A split in Pasco County has 45 feet of measured pipe, four 90° elbows, and a 12-foot suction riser because the air handler is in a first-floor closet and the condenser is on the roof. The manufacturer’s table at that equivalent length calls 3/8-inch liquid and 7/8-inch suction . The helper wants to “upgrade” the suction to 1-1/8 inch “for less pressure drop.” That larger riser drops oil-return velocity on a mild Tampa evening when the compressor unloads. Stay on the 7/8-inch riser, trap the base , and insulate the suction the entire attic run. Substituting leftover 3/8 and 5/8 because that is what the van holds is the opposite error — capacity and flash gas.
Over 2 inches. A 40-ton Class A rack with a 2-5/8-inch suction is not a line-set problem. You run hard-drawn ACR or steel , braze or weld (Section 25.2–25.3), support on the Table 305.4 row (Section 25.4), and size from the rack manufacturer or an engineered pressure-drop calc. Class B still studies the diameter; Class B does not install that 40-ton system.
Oil return — pitch, traps, double risers
Oil leaves the compressor as a mist. It must come home. Industry practice (Refrigeration & Air Conditioning Technology; not a numbered FBC slope for refrigerant suction) is to pitch horizontal suction in the direction of flow about 1/2 inch per 10 feet toward the compressor so oil does not pond in a belly. Do not confuse this with condensate slope ( 1/8 inch per foot on FBC Mechanical 307 drains).
A P-trap (oil trap) at the bottom of a suction riser collects oil until the slug is big enough for vapor to push it up the riser. Put the trap at the base of the riser , not randomly in the middle of a horizontal run. When the evaporator sits above the compressor, pitch down to the compressor and use an inverted trap (inverted loop) at the evaporator outlet so liquid refrigerant does not drain into the compressor during the off cycle.
A double suction riser is the part-load tool on a capacity-controlled compressor: a small riser carries oil at low load; a trapped larger riser comes in when load (and velocity) rises. Oversizing a single riser “to be safe” is how a supermarket case starves the compressor of oil at night.
Insulation. FBC Mechanical 1109.7 : refrigerant piping that will run below the dew point of the surrounding air, where condensate would damage occupants, structure, or equipment, shall be insulated or protected . In a Florida attic that is the suction line on a cool-only split and both legs on a heat pump (Chapter 20). UV-jacket the outdoor run. Bare suction over a drywall ceiling is a stain, a mold call, and a 1109.7 miss.
Location. FBC Mechanical 1109.2.1 : exposed refrigerant piping in open spaces that afford passage shall be not less than 7 feet 3 inches above the finished floor. 1109.2.3 prohibits refrigerant pipe exposed in a fire-resistance-rated exit-access corridor , in an interior exit stairway or ramp , in an exit passageway , or in an elevator/dumbwaiter shaft . 1109.2.7 : identify pipe in areas other than the equipment room at intervals not exceeding 20 feet , letters not less than 1/2 inch , with the refrigerant designation and safety group.
Florida HVAC scenario
Suncoast Mechanical, a certified Class B shop in Pinellas County, change-outs a 4-ton split. The old 3/8-and-3/4 set is undersized for the new R-410A indoor coil’s equivalent-length table, which wants 3/8 liquid and 7/8 suction . The roof is 14 feet above the air handler. The mechanic runs 3/4 suction because “we always do,” skips the riser trap , leaves a belly in the attic with no pitch , and uses Type M plumbing copper from a supply house because it was cheaper than ACR. Four independent failures: wrong OD , no oil-return trap , no 1/2-in-per-10-ft pitch , and wrong product (not dehydrated ACR / Table 1107.4 field tube). Class B is legal on 4 tons. The license does not make Type M and a flat belly legal. If the same owner had pointed at a 30-ton split on the strip center, Class B would have been the first no, before any ACR was unrolled.
Traps: (1) Using plumbing Type M as a line set. (2) Upsizing a suction riser for “less drop” and losing oil. (3) Treating 2-1/8-inch pipe like 7/8-inch line set. (4) Pitching suction like a condensate drain, or not pitching it at all. (5) Copper on ammonia.