Study guide
25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene
Florida HVAC Contractor License Class A/B
Track your progress as you read
Finished sections get a check mark.
1 Introduction & Exam Overview
1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility
2 Establishing the Contracting Business
2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding
3 Insurance for Florida HVAC Contractors
3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules
4 Overhead, Staffing & Markets
4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services
5 Bids, Proposals & Estimating
5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing
6 Purchasing, Invoices, Draws & Safety Programs
6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)
7 Managing Contracts
7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk
8 Managing Trade Operations
8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory
9 Accounting I: Receivables, Payables & Cash
9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios
10 Accounting II: Taxes, Job Cost & Payroll
10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments
11 Managing Human Resources
11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees
12 Florida Contractor Law: Chapter 489 & 61G4
12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities
13 Florida Construction Lien Law (Chapter 713)
13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien
14 Financial Responsibility, CE & Federal Rules
14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules
15 Plans, Specs & Equipment Selection
15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness
16 Energy Codes, Loads & Thermal Resistance
16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves
17 HVAC System & Duct Design
17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes
18 Piping, Pumps, Boilers, Controls & Rigging Design
18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment
19 Sheet Metal Duct Fabrication
19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans
20 Split, Package & Heat Pump Installation
20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems
21 Large Systems, Chillers & Towers
21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems
22 Refrigeration, Coolers, Ventilation & Controls Install
22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests
23 Condensers, Compressors & Air Handlers
23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips
24 Duct, Fans, Filters & Terminals
24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances
25 Refrigerant Piping & Joining
25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing
26 Metering Devices & Line Components
26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories
27 Controls Installation
27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches
28 Motors, Wiring & Electrical Installation
28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe
29 Diagnostic Analysis: Refrigeration
29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments
30 Diagnostic Analysis: Electrical & Instruments
30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges
31 Recovery, Repair & Calibration
31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls
32 Mechanical Service & Cleaning
32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains
33 Jobsite Safety & Equipment
33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors
34 Energy Management
34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs
35 Indoor Air Quality
35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects
25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene
Key Takeaways Explain This Topic AI
FBC Mechanical 1108.8: steel refrigerant pipe joints are mechanical, threaded, press-connect, or welded. Table 1107.4 lists ASTM A53 / A106; Type F steel is not for refrigerant lines operating below −20°F.
Section 1107.4.1: Group A2, A3, B2, and B3 refrigerants require Schedule 80 steel for sizes 1-1/2 inches or less. Ammonia (R-717) follows IIAR, not Chapter 11, and still is not a copper circuit.
FBC Mechanical 1108.3.4: NPT threads get lubricant, pipe-joint compound, or tape on the external threads only, listed for the piping material. Dope does not belong on flares or brazed cups.
Oxy-acetylene cutting and welding with filler rods are the steel-pipe shop tools (Pipefitters Handbook R82; OSHA 29 CFR 1926 Subpart J). Acetylene regulators stay at or below 15 psig in the hose; oxygen is never the refrigerant test gas.
Plastic pipe (PVC, CPVC, PEX) is not a Table 1107.4 refrigerant material. It is condensate (Chapter 3) or listed hydronic; hanging PVC on 4-foot centers (Table 305.4) does not make it legal in the suction line.
Last updated: August 2026
25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene
Trade Area D still has steel pipes , threading , oxy-acetylene cutting , welding with filler rods , and plastic pipes and fittings (outline item 86). Copper ACR from 25.1–25.2 does not cover a 4-inch steel discharge, a threaded king valve, or the helper who glued PVC into a suction line. The CBT stack is FBC Mechanical 2023 Chapter 11 plus Table 305.4 , Pipefitters Handbook, 3rd Edition (1967) (R82) for thread engagement, offsets, and torch work, and OSHA 29 CFR 1926 (July 1, 2025 edition on the 2026 list) Subpart J for welding and cutting.
Quick Answer: Steel refrigerant pipe is ASTM A53 or A106 , joints threaded, welded, mechanical, or press-connect ( 1108.8 ). Schedule 80 for Group A2/A3/B2/B3 sizes 1½ inches and under ( 1107.4.1 ). NPT compound goes on male threads only ( 1108.3.4 ). Oxy-acetylene cuts and welds steel ; acetylene ≤15 psig in the hose. Plastic is not refrigerant pipe .
Steel pipe on a refrigeration circuit
Table 1107.4 lists ASTM A53 and ASTM A106 steel pipe, and ASTM A254 / A334 steel tube. Note b : ASTM A53 Type F (furnace-butt-welded) shall not be used for refrigerant lines with an operating temperature less than −20°F . Low-temperature suction on a freezer is not a Type F hardware-store special.
1107.4.1 raises the wall for flammable and toxic groups: the minimum weight of steel pipe for Group A2, A3, B2, and B3 refrigerants shall be Schedule 80 for sizes 1½ inches or less . A2L (R-32, R-454B) is a subclass of Class 2 in ASHRAE 34; when the question names A2/A3/B2/B3 and 1-1/4-inch steel, Schedule 80 is the row. Group A1 (R-410A, R-134a, R-404A) commonly uses Schedule 40 where the listed pressure rating is enough — still not Type F on a −30°F blast freezer.
Ammonia remains 1101.1.2 / IIAR , typically steel , never copper. Class A is the statutory home for large ammonia plants; Class B candidates still must know why copper fails on NH3.
1108.8 : steel pipe joints are mechanical, threaded, press-connect, or welded . 1108.9 : steel tube joints are flared, mechanical, press-connect, or welded — not a plumbing 50/50. 1108.1.1 : dissimilar metals use an approved adapter and a dielectric fitting or union meeting ASSE 1079 when the metals would otherwise galvanically eat each other. A copper suction bolted to a steel rack header without a listed transition is a leak and a corrosion cell.
Stop valves on steel (and copper) follow 1109.8 : systems with more than 6.6 pounds of refrigerant get stop valves at the compressor/condensing-unit suction inlet and discharge outlet and at the liquid-receiver outlet . More than 100 pounds adds receiver inlets and condenser inlets/outlets when condensers run in parallel. 1109.8.3 : do not let 1-inch OD and larger copper or aluminum tubing support the valve — the valve needs its own hanger (Section 25.4).
Threading — NPT, engagement, compound
FBC Mechanical 1108.3.4 : threads shall conform to ASME B1.1, B1.13M, B1.20.1, or B1.20.3 . Thread lubricant, pipe-joint compound, or thread tape shall be applied on the external threads only and shall be approved for the piping material . That is male-only dope. Compound on the female thread is how you pack the first inch of a TXV or a compressor port with shredded PTFE.
NPT (tapered pipe thread, ASME B1.20.1 ) seals on the taper , not on a gasket. The Pipefitters Handbook is the CBT table for threads per inch , engagement length , and cut length after takeoff . Typical NPT: 1/2-inch and 3/4-inch are 14 TPI ; 1-inch through 2-inch are 11.5 TPI . Cut square , ream , die to the handbook thread length , and stop when the fitting is wrench-tight on the taper — not when the helper has buried every thread plus a backup wrench on the valve body.
Worked thread example. A 1-inch Schedule 40 nipple into a steel receiver port: male threads get listed refrigeration-compatible compound or PTFE (not yellow gas tape used as a license to run new interior fuel lines — F.S. 489.105 still bars new interior LP/natural-gas piping except appliance changeout disconnect/reconnect). Leave the leading thread bare so shreds do not enter the circuit. Back the valve with a second wrench on the valve body. Then pressure-test (25.4); a soapy “good enough” on an untested 400-psi discharge thread is not a 60-minute 1110.5 test.
Do not thread-sealant a flare , a press-connect , a brazed cup , or a gasketed flange . Chapter 18 already parked compound on hydronic NPT; this section parks it on steel refrigerant NPT only.
Oxy-acetylene cutting and filler-rod welding
The CILB oxy-acetylene cutting item is steel . You preheat a spot to kindling temperature with the mixed flame, then squeeze the oxygen cutting lever so a jet oxidizes and blows the slag out of the kerf. That is how you drop a hanger, a Unistrut, or a steel main — not how you “cut” ACR copper (copper is cut with a tube cutter , then reamed).
Welding with filler rods (1108.3.5 plus the handbook): clean mill scale, bevel heavy wall if the procedure says so, and add approved filler so the weld metal fills the groove. A neutral flame (equal acetylene and oxygen, sharp inner cone) is the usual welding flame. An oxidizing flame (excess oxygen) burns the steel. A carburizing flame (excess acetylene, feathery acetylene feather) adds carbon. Brazing copper on the same cart still uses a neutral to slightly reducing flame and the nitrogen purge from 25.2 — the cutting oxygen lever is not a purge.
Acetylene is unstable above 15 psig as a free gas. Keep the acetylene regulator at or below 15 psig . Cylinders stay upright . OSHA 1926.350 : oxygen and fuel-gas cylinders in storage are separated by 20 feet or a 5-foot 1/2-hour fire wall; caps on; no oil on oxygen regulators. Use reverse-flow check valves and flashback arrestors . Crack oxygen slowly; a slammed oxygen valve with oil in the regulator is a shop fire.
Never pressure-test a refrigerant circuit with the oxygen cylinder (Section 25.4 / 1110.3 ). Oxygen plus compressor oil is an explosion, not a leak test.
Plastic pipes and fittings — what they are for
Plastic is not in Table 1107.4. PVC, CPVC, ABS, and PEX are not refrigerant metals. The CILB plastic pipes/fittings item is a negative on the refrigerant side and a positive on condensate and listed hydronic:
Plastic Legal HVAC use Not legal
PVC / CPVC Condensate (FBC Mechanical 307 , 3/4-inch minimum through 20 tons), some listed cooling-tower or condenser-water when the spec and listing say so Refrigerant suction, liquid, or discharge
PEX / PE-RT / PP Listed hydronic (Chapter 12 / Chapter 18), Table 305.4 hangers at 32 inches for 1-inch-and-under PEX Refrigerant line sets
ABS Some DWV — not an HVAC refrigerant grant; condensate is not a sanitary tap ( 307.2.1.1 , Chapter 20) Tying condensate into ABS sanitary with a wye
Table 305.4 horizontal spacing, for when plastic is the right pipe: PVC 4 feet , CPVC 1 inch and smaller 3 feet , PEX 1 inch and smaller 2-2/3 feet (32 inches) , with mid-story guides on the vertical rows that carry note c . Hanging PVC every 4 feet does not convert it into ACR.
F.S. 489.105 still does not give Class A or Class B potable water, sanitary sewer, or pool piping . Plastic condensate to an existing safe waste is inside the grant. A new sanitary tap is not. Plastic refrigerant “because it doesn’t corrode in the salt air” is not a coastal exception.
Florida HVAC scenario
A Class A crew in Duval County hangs a 2-inch Schedule 40 A53 discharge on an A1 rooftop rack (over 25 tons — Class A). They thread the king valves with compound on the male NPT, weld a steel offset with a filler rod and a neutral oxy-acetylene flame, and cut a hanger from angle with the cutting lever . The helper then wants to run Schedule 40 PVC for the last 20 feet of suction “because plastic is on the outline.” Wrong column: outline item 86 tests that you know plastic is not refrigerant pipe . On the same roof, a Class B bidder cannot take the 40-ton rack at all; the Class B 3-ton change-out in the parking-lot office still uses ACR , still brazes with nitrogen, and still runs PVC only on the 3/4-inch condensate , sloped 1/8 inch per foot, not into a sanitary wye.
Traps: (1) Type F steel on a −30°F freezer. (2) Schedule 40 on a 1-inch A2/A3/B2/B3 line that 1107.4.1 wants Schedule 80. (3) Dope on female threads or on a flare. (4) Oxygen as a “test gas.” (5) PVC suction.