Study guide

22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust

Florida HVAC Contractor License Class A/B

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

1.1 Current Exam Facts & License Classes 1.2 Exam Format, Open-Book Rules & Pearson VUE 1.3 Eligibility, Experience Paths & Financial Responsibility

2 Establishing the Contracting Business

2.1 Business Organizational Structure 2.2 Business Plan, Marketplace & License Scope 2.3 Professionals, Fixed Assets & Bonding

3 Insurance for Florida HVAC Contractors

3.1 Obtaining Insurance (GL, Workers' Compensation & Bonds) 3.2 Coverages, Limits & Policy Language 3.3 Maintaining Insurance & CILB Certificate-Holder Rules

4 Overhead, Staffing & Markets

4.1 Developing the Business, Staffing & Markets 4.2 Determining Business Overhead (FICA, FUTA, SUTA, Workers' Comp, Rent & Utilities) 4.3 Determining Outsourced Services

5 Bids, Proposals & Estimating

5.1 Preparing Bids and Proposals 5.2 AIA Documents, Offers & Contract Components 5.3 Labor Productivity, Overhead & Project Costing

6 Purchasing, Invoices, Draws & Safety Programs

6.1 Purchasing Materials, UCC & Inventory (FIFO) 6.2 Invoices, Draw Requests & Percentage of Completion 6.3 Developing a Safety Program (OSHA, SDS & Drug Testing)

7 Managing Contracts

7.1 Contract Law, Scope & Completion Schedules 7.2 Florida Lien Law Inside Contracting 7.3 Mediation, Arbitration, Tort Law & Risk

8 Managing Trade Operations

8.1 Scheduling Trade Operations (CPM, RFI & Submittals) 8.2 OSHA Records, Document Retainage & Penalties 8.3 Takeoffs, Equipment Lease vs Purchase & Inventory

9 Accounting I: Receivables, Payables & Cash

9.1 Managing Accounts Receivable 9.2 Managing Accounts Payable & Discounts 9.3 Cash Flow, Banking & Financial Ratios

10 Accounting II: Taxes, Job Cost & Payroll

10.1 Filing Tax Forms & Returns 10.2 Tracking Job Costs 10.3 Payroll, Employment Taxes & Garnishments

11 Managing Human Resources

11.1 Hiring, I-9, Background Checks & Discrimination 11.2 HR Policies, OSHA & Drug-Test Chain of Custody 11.3 Evaluating Employees

12 Florida Contractor Law: Chapter 489 & 61G4

12.1 Chapter 489: Certified vs Registered & Qualifying Agents 12.2 61G4 Board Rules, Advertising & Discipline 12.3 Qualifying Agent Duties, Supervision & Additional Entities

13 Florida Construction Lien Law (Chapter 713)

13.1 Construction Lien Overview & Claimants 13.2 Notices to Owner, Time Limits & Perfecting Liens 13.3 Payment Bonds, Waivers & Claims of Lien

14 Financial Responsibility, CE & Federal Rules

14.1 Financial Responsibility & the 660 FICO Rule 14.2 Continuing Education & Biennial Renewal 14.3 Federal Employment, Immigration, OSHA & Environmental Rules

15 Plans, Specs & Equipment Selection

15.1 Reading Plans, Specifications, Symbols & Scales 15.2 Recommending Plan Changes & Equipment Types 15.3 EER, SEER, ARI Listings & Cost Effectiveness

16 Energy Codes, Loads & Thermal Resistance

16.1 Florida Energy Codes, R-Values & U-Factors 16.2 Determining HVAC Heating & Cooling Loads 16.3 Applying Energy Conservation, Fan Curves & Pump Curves

17 HVAC System & Duct Design

17.1 Designing HVAC Systems (Psychrometrics, Enthalpy & Airflow) 17.2 Designing Duct Systems & Insulation 17.3 Selecting Equipment, Location & Codes

18 Piping, Pumps, Boilers, Controls & Rigging Design

18.1 Pipe Sizing, Valves, Fittings, Sealants & Layout 18.2 Control Requirements, Fan Motors, CFM & Compressor Capacity 18.3 Pumps, Boilers, Steam, Fuel & Pipe Insulation 18.4 Grease Ducts, Live Loads, Rigging & Mechanical Equipment

19 Sheet Metal Duct Fabrication

19.1 Fabricating Rectangular & Round Ducts 19.2 Seams, Locks, Taping, Mastics & Liners 19.3 Fittings, Outlets & Grilles 19.4 Kitchen Hoods, Exhausts & Drain Pans

20 Split, Package & Heat Pump Installation

20.1 Installing Split & Package Air Conditioners 20.2 Installing Split & Package Heat Pumps 20.3 Air-Cooled vs Water-Cooled Systems

21 Large Systems, Chillers & Towers

21.1 Installing by Tonnage & Class A vs Class B Limits 21.2 Chilled Water, Water Towers & Secondary Coolant 21.3 Centrifugal, Absorption & Ammonia Systems

22 Refrigeration, Coolers, Ventilation & Controls Install

22.1 Low, Medium & Ultra-Low Temperature Systems & EPA Rules 22.2 Walk-In & Reach-In Coolers 22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust 22.4 Geothermal, Pneumatic & DDC Controls, TAB & Smoke Tests

23 Condensers, Compressors & Air Handlers

23.1 Installing Air-Cooled & Water-Cooled Condensers 23.2 Hermetic, Semi-Hermetic & Centrifugal Compressors 23.3 Air Handlers, Evaporators, Heat Exchangers, Receivers & Heat Strips

24 Duct, Fans, Filters & Terminals

24.1 Installing Sheet Metal, Fiberglass & Flexible Duct 24.2 Fans, Blowers, Motors, Grilles, Registers & Fire Dampers 24.3 Filters, Flues, Warm-Air, Gas & Fuel-Oil Appliances

25 Refrigerant Piping & Joining

25.1 Refrigerant Piping, Copper Tubing & Pipe Sizing 25.2 Brazing, Welding, Flaring, Swaging & Soldering 25.3 Steel Pipe, Plastic Pipe, Threading & Oxy-Acetylene 25.4 Hangers, Supports, Horizontally Supported Piping & Pressure Testing

26 Metering Devices & Line Components

26.1 TXVs, Capillary Tubes, Reversing Valves & Metering Devices 26.2 Liquid, Suction & Heat-Pump Dryers, Filters & Oil Traps 26.3 Receivers, Heat Strips, Gas/Oil Appliances & Related Accessories

27 Controls Installation

27.1 Pressure, Temperature, Humidity & Bellows Controls 27.2 Thermostats, Humidistats, Pneumatic & Solid-State Controls 27.3 Transformers, Capacitors, Contactors, Relays & Safety Disconnects 27.4 Defrost Components, Starters, Solenoids & Limit Switches

28 Motors, Wiring & Electrical Installation

28.1 Wiring Single-Phase & Three-Phase Equipment 28.2 Motor Types, Protection, Controllers, Belts & Pulleys 28.3 Geothermal Loops, Surge Protectors, Phase Monitors & Plastic Pipe

29 Diagnostic Analysis: Refrigeration

29.1 Pressure-Enthalpy Diagrams & Operating Pressures 29.2 Air Volumes, Enthalpy, Wet-Bulb & Dry-Bulb 29.3 Leak Detection & Refrigeration Test Instruments

30 Diagnostic Analysis: Electrical & Instruments

30.1 Current Draw, Voltage, Power & Motor Terminals 30.2 Testing Relays, Capacitors, Starters, Transformers & Defrost Stats 30.3 Using Amprobes, Velometers, Pitot Tubes, Manometers & Gauges

31 Recovery, Repair & Calibration

31.1 Nitrogen & Gas Regulators, Recovery & Retrofit 31.2 Repairing Hermetic, Semi-Hermetic, Centrifugal Compressors & Blowers 31.3 Calibrating Thermostats, Pressure Switches & Pneumatic Controls 31.4 Superheat, Safety Cutouts, Defrost Clocks & Freezer Controls

32 Mechanical Service & Cleaning

32.1 Belts, Pulleys, Motor Rotation & Seized Compressors 32.2 Crankcase & Evaporator Pressure Regulators & Unloaders 32.3 Cleaning Towers, Condensers, Foreign Matter & Condensate Drains

33 Jobsite Safety & Equipment

33.1 PPE: Hearing, Head, Eye, Face & Respiratory Protection 33.2 Lockout/Tagout, Warning Signs, Toxic Materials & Ventilation 33.3 Rigging, Hoists, Cranes, Forklifts, Backhoes & Excavation 33.4 Ladders, Scaffolds, Tools & Air Compressors

34 Energy Management

34.1 Envelope, Duct Pressure & Blower-Door Testing 34.2 Efficient Equipment, Zoning, ERVs, Wi-Fi Thermostats & Green Buildings 34.3 Energy Forms, R/U Factors, Window Heat Gain & Florida Load Calcs

35 Indoor Air Quality

35.1 Ventilation, Filtration, Humidity, UV & Air Cleaners 35.2 Contaminants, Source Control, TAB & Human Health Effects

22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust

Key Takeaways Explain This Topic AI

NFPA 90A (2015) is the commercial air-conditioning and ventilating fire standard on the 2026 CBT list; NFPA 90B (2024) is warm-air heating and air-conditioning for dwellings; NFPA 96 (2021) is commercial cooking grease exhaust.

ASHRAE 62.1 (and FBC Mechanical 2023 Chapter 4) size outdoor air from people plus floor area — qualitative on this exam: more occupants and more square feet need more outdoor air, not a random 15 percent OA damper.

FBC Mechanical 508.1: makeup air is approximately equal to kitchen exhaust, interlocked with the exhaust, and shall not reduce capture. NFPA 96 keeps building negative pressure from exceeding 0.02 in. w.c. when the exhaust runs.

Field-welded Type I grease ducts: carbon steel not less than No. 16 gage or stainless not less than No. 18 gage, continuous liquid-tight welds, slope 1/4 in./ft (1 in./ft if the horizontal run exceeds 75 feet), not less than 500 fpm. FBC 506.3.2.5: light test with a lamp of not less than 100 watts (or approved equivalent) before concealment.

Ventilation duct is SMACNA sheet metal, fibrous glass (SMACNA 8th 2021), or listed UL 181 flex — hang from the structure per SMACNA, not from the sprinkler main. Type I grease duct is not 26-gauge snap-lock.

Last updated: August 2026

22.3 Ventilation, Exhaust, Makeup Air, Grease Ducts & Kitchen Exhaust

Trade C’s air-side install cluster is ventilation ductwork (fire codes, scale, sheet metal / fibrous glass / flex , fittings, outlets, hanging), exhaust and makeup , grease-handling ducts , and kitchen exhaust . Chapters 18.4 and 19.4 already built the hood and the welded duct . This section is the Trade C install : how that system sits in the building with outdoor air , makeup , and fire codes . The 2026 CBT list names NFPA 90A 2015 , NFPA 90B 2024 , NFPA 96 2021 , SMACNA HVAC Duct Construction Metal and Flexible 4th 2020 , SMACNA Fibrous Glass 8th 2021 , and FBC Mechanical 2023 Chapters 4, 5, and 6 .

Quick Answer: 90A is commercial AC/vent fire protection; 90B is dwelling warm-air; 96 is grease. Outdoor air follows people + area (ASHRAE 62.1 / FBC 403). Makeup ≈ exhaust , interlocked, and must not wreck hood capture. Grease duct is 16/18-gage welded , 500 fpm minimum, sloped , and light-tested (FBC 506.3.2.5 , lamp ≥ 100 watts ) before concealment.

Fire codes, scale, and which book is in your hand

NFPA 90A (2015), Standard for the Installation of Air-Conditioning and Ventilating Systems , is the commercial book: duct construction in fire-resistance-rated buildings, fire dampers , smoke dampers , ceiling radiation dampers, and smoke detection that prevents recirculating smoke (Section 22.4 quotes FBC 606 , which points at 90A ). NFPA 90B (2024) is warm-air heating and air-conditioning for one- and two-family dwellings and manufactured homes — lighter construction, still listed flex and still no grease duct. Using 90B tables on a three-story office is the wrong book. Using 90A as an excuse to skip NFPA 96 on a Type I hood is the other wrong book.

Scale on the drawings is still the architect’s 1/4 inch or 1/8 inch (Chapter 15). Exhaust and makeup ducts are measured centerline the same way supply ducts are. Velocity in a grease duct is not a Ductulator comfort-cooling pick: FBC 506.3.4 / NFPA 96 want not less than 500 fpm (and a listed maximum, commonly 2,500 fpm in the mechanical-code family) so grease stays airborne to the fan instead of plating in the elbow.

Sheet metal, fibrous glass, flex, fittings, outlets, hanging

Ordinary ventilation duct is the Chapter 19 product:

Product Book / listing Install note on this cluster

Sheet metal (galvanized, stainless, aluminum) SMACNA 4th 2020; FBC 603.4 Pressure class, largest side, joint spacing; hang from structure per SMACNA (FBC 603.10 )

Fibrous glass duct board SMACNA Fibrous Glass 8th 2021; UL 181 Class 0 or 1 Closure 181A-P / 181A-M / 181A-H ; not grease duct; air in the board ≤ 250°F (FBC 603.5 )

Flexible air duct UL 181 Class 0 or 1 Fully extended, supported per listing; FBC does not cap flex duct length the way it caps flexible air connectors at 14 feet and no penetration of wall/floor/ceiling ( 603.6.2.1–.2 )

Type I grease duct FBC 506.3 / NFPA 96 2021 16-gage steel or 18-gage stainless , continuous liquid-tight weld — not 26-gage snap-lock, not duct board, not flex

Fittings (elbows, wyes, takeoffs) match the duct’s pressure class (Section 19.3). Outlets are grilles, registers, and diffusers ; FBC 603.18 wants a volume damper or other adjustment in the branch or at the device, with access . Hang straps from the building structure . Do not hang ventilation duct from a sprinkler pipe , a gas line , or another trade’s trapeze (Chapter 18.4: HVAC does not relocate sprinklers).

Fire and smoke dampers go where ducts penetrate fire-resistance-rated assemblies or smoke barriers , listed for the rating, installed in the plane of the assembly per the listing — that is FBC 607 / NFPA 90A , not a shop-made sliding plate. Combination fire/smoke dampers need power and a smoke signal; they are not a volume damper painted red.

Outdoor air, exhaust, and makeup (ASHRAE 62.1 qualitative)

ASHRAE Standard 62.1 is the commercial ventilation standard FBC Mechanical Chapter 4 is built from. The Ventilation Rate Procedure is qualitative on this exam: outdoor air for a zone is people outdoor air (cfm per person × occupants) plus area outdoor air (cfm per square foot × floor area). More people and more floor need more outdoor air. A locked 10 percent OA damper on a 20-ton rooftop is not a 62.1 calculation. Rest rooms, locker rooms, and janitor closets also have local exhaust rates in FBC Table 403.3.1.1 ; that exhaust is not optional because the rooftop “has some OA.”

Exhaust without makeup pulls the building negative . Doors whistle, combustion appliances spillage-risk, and a Type I hood loses capture (the plume spills into the dining room). FBC 508.1 : the amount of makeup air supplied to a commercial kitchen shall be approximately equal to the exhaust; makeup shall be supplied by gravity or mechanical means; windows and doors shall not be used as the makeup path; makeup shall be automatically controlled to start and stop with the exhaust; and makeup shall not reduce the effectiveness of the exhaust system. NFPA 96 adds a performance cap: replacement air shall keep building negative pressure from exceeding 0.02 in. w.c. while the exhaust runs. Type I exhaust stays independent of the HVAC return (you do not share a grease duct with a comfort return). Makeup may be tempered ; dumping unconditioned 95°F, 80-grain Florida air on the cook line is a comfort failure, not a code pass.

Worked makeup. A listed Type I canopy is 2,400 cfm . Makeup is approximately 2,400 cfm , interlocked. If the dining rooftop is only 1,200 cfm of outdoor air, it is not the kitchen makeup. A transfer grille from the dining room can be part of the replacement air only where the code allows transfer — it still must not steal capture at the hood lip and it still must not use the corridor as a duct except for the narrow FBC 601.2 exceptions.

Grease ducts and kitchen exhaust — install, do not re-shop Chapter 19

Type I hoods (grease) and Type II hoods (heat/steam, no grease) were fabricated in Section 19.4 . Field-welded Type I duct remains carbon steel not less than No. 16 gage or stainless not less than No. 18 gage , continuous liquid-tight external weld (FBC 506.3 / NFPA 96 ). Slope not less than 1/4 inch per foot toward the hood or a reservoir; if the horizontal run exceeds 75 feet , slope not less than 1 inch per foot (Section 18.4). Cleanouts on horizontal duct are not more than 20 feet apart and not more than 10 feet from changes of direction greater than 45° (Section 19.4). Minimum in-duct velocity 500 fpm . Fans: motor out of the airstream , UL 762 (or constructed as grease duct), upblast fans hinged with the listing’s duct height (commonly 18 inches of duct above the roof and 40 inches of clearance to the roofline in the NFPA 96 / FBC family — read the listing on the exam table).

FBC Mechanical 506.3.2.5 Grease duct test. Before the duct is used or concealed , a leakage test is required. Ducts shall be considered to be concealed where installed in shafts or other inaccessibility. A light test or an approved equivalent shall show that welded and brazed joints are liquid-tight . A light test passes a lamp of not less than 100 watts through the entire section to be tested. Many Florida fire departments witness that test — that is the “fire dept smoke/light test” the outline pairs with kitchen exhaust. A theatrical smoke candle in a 26-gage snap-lock trunk is not a 506.3.2.5 test.

Clearance to combustibles (commonly 18 inches unless a listed enclosure or wrap reduces it), listed grease filters , and a fire-extinguishing system interface (FBC 509 / NFPA 96 ) are part of the install . HVAC contractors do not design the wet-chemical system as fire-protection contractors, but they interlock the exhaust fan, makeup, and fuel/electric shutoff the way the listing and NFPA 96 require. Type I exhaust does not get a fire damper that would trap grease; shaft and enclosure rules in 506.3.11 replace that thought.

Florida scenario

A certified Class B shop in Orange County fits a 2,400 cfm Type I canopy, welded 16-gage grease duct up a rated shaft with listed wrap, an upblast UL 762 fan, and 2,400 cfm of interlocked tempered makeup for a 150-seat restaurant. Outdoor air for the dining room is a separate 62.1 / FBC 403 number on the rooftop (people + area) — that rooftop is not the hood makeup. The grease duct is light-tested with a ≥100-watt lamp before the shaft is closed; the AHJ’s fire inspector stands there. Ordinary 2 in. w.g. SMACNA supply to the dining room is hung from structure, sealed, and balanced (Section 22.4). Substituting fibrous-glass board for the grease riser, using the dining-room OA damper as makeup, or skipping the light test because “it is welded so it cannot leak” are the three ways this ticket fails. The hood is well under 25 tons of cooling, so Class B may hold the mechanical permit; the grease rules are still 96 / Chapter 5 , not 90B.

Traps: (1) Using NFPA 90B on a commercial kitchen. (2) Makeup from an open window. (3) 26-gage snap-lock “grease duct.” (4) Hanging duct from the sprinkler main. (5) Treating dining-room OA as hood makeup. (6) Concealing a grease duct before the 100-watt light test.

Loading diagram... Kitchen exhaust, makeup, and ventilation books on the 2026 list