Study guide

14.2 Sewage Lift Stations & Force Mains

Florida Journeyman Plumber Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Florida Plumbing Code Administration & Licensure

1.1 DBPR Licensing, CILB Regulations & Journeyman Qualifications 1.2 Permits, Inspections & Code Enforcement 1.3 Florida Construction Lien Law & Business Operations

2 Chapter 2: Sanitary Drainage Fundamentals & DFU Sizing

2.1 Gravity Drainage Principles & Florida DWV Materials 2.2 Drainage Fixture Units (DFU) & Load Values 2.3 Horizontal Branch & Vertical Stack Sizing 2.4 Drainage Fittings, Flow Direction & Change of Direction Rules

3 Chapter 3: Building Drains, Sewers & Special Drainage Systems

3.1 Building Drain & Building Sewer Sizing 3.2 Drainage Cleanouts: Sizing, Clearances & Locations 3.3 Sewage Ejectors, Sumps & Macerating Systems 3.4 Florida High Water Table, Slab Penetrations & Termite Protection

4 Chapter 4: Indirect Waste, Special Waste & Interceptors

4.1 Indirect Waste Systems: Air Gaps vs Air Breaks 4.2 Grease Interceptors: Hydromechanical & Gravity Interceptor Sizing 4.3 Sand, Oil & Specialized Interceptors

5 Chapter 5: Water Supply Systems & WSFU Pipe Sizing

5.1 Potable Water Piping Materials & Installation 5.2 Water Supply Fixture Units (WSFU) & Demand Estimations 5.3 Water Distribution Pipe Sizing Methods 5.4 Water Pressure Control, Boosting & PRVs

6 Chapter 6: Water Heaters, Cross-Connection Control & Reclaimed Water

6.1 Water Heaters & Safety Controls 6.2 Backflow Prevention & Cross-Connection Protection 6.3 Reclaimed Water Systems & Florida Dual-Plumbing Rules 6.4 System Testing, Disinfection & Commissioning

7 Chapter 7: DWV Venting Systems & Sizing

7.1 Principles of Venting & Trap Seal Integrity 7.2 Vent Sizing & Developed Length 7.3 Wet Venting & Horizontal Wet Venting 7.4 Circuit, Loop & Common Venting

8 Chapter 8: Specialized Venting & Air Admittance Valves

8.1 Island Fixture Vents & Foot Venting 8.2 Combination Waste and Vent Systems 8.3 Air Admittance Valves (AAVs) & Engineered Systems

9 Chapter 9: Isometric Drawing Interpretation & Drafting

9.1 Isometric Drawing Fundamentals and Plan Reading 9.2 Drafting Florida DWV Isometric Schematics 9.3 Local Exam Plan-Reading Practice and Self-Audit 9.4 Reading Plumbing Plans, Specifications & Schedules

10 Chapter 10: Fuel Gas Piping & Storm Drainage Systems

10.1 Fuel Gas Fundamentals: Natural Gas vs LP Gas 10.2 Gas Pipe Sizing & Demand Calculations 10.3 Gas Pipe Materials, Installation, Testing & Appliance Connections 10.4 Storm Drainage Sizing & Florida Rainfall Rates 10.5 Appliance Venting, Chimneys & Combustion Air

11 Chapter 11: Trade Mathematics, Accessibility & Jobsite Safety

11.1 Plumbing Math: Grade, Pitch & Elevation Calculations 11.2 Plumbing Math: 45-Degree & Rolling Offsets 11.3 Florida Accessibility Standards for Plumbing Fixtures 11.4 OSHA Construction Safety Standards for Plumbers 11.5 Plumbing Tools, Equipment & System Troubleshooting

12 Chapter 12: Medical Gas & Vacuum Piping Systems (NFPA 99)

12.1 Medical Gas Systems: Categories, Gases & Source Equipment 12.2 Medical Gas Piping Materials, Brazing & Nitrogen Purging 12.3 Station Outlets, Zone Valves, Alarms & Pipe Sizing 12.4 Medical-Surgical Vacuum, WAGD & System Verification

13 Chapter 13: Industrial, Process & Special-Waste Piping

13.1 Compressed Air & Industrial Gas Piping Systems 13.2 Industrial Vacuum Piping Systems 13.3 Process Piping & Steam Distribution Systems 13.4 Oil & Gasoline Storage and Distribution Systems 13.5 Industrial Water Drainage & Waste Pretreatment

14 Chapter 14: Site Utilities, Sewage Disposal & Water Mains

14.1 Onsite Sewage Treatment & Disposal: Septic Tanks & Drainfields 14.2 Sewage Lift Stations & Force Mains 14.3 Water Transmission Mains, Excavation & Heavy Equipment

15 Chapter 15: Pools, Wells, Irrigation, Solar & Fire Protection

15.1 Swimming Pool & Spa Piping Systems 15.2 Water Wells, Pumps & Irrigation Systems 15.3 Solar Water Heating Systems 15.4 Fire Protection Systems & Standpipes (NFPA 14)

14.2 Sewage Lift Stations & Force Mains

Key Takeaways Explain This Topic AI

Force-main design balances transport, friction and surge; the worked example explicitly supplies its 2–8 ft/s criterion.

Total dynamic head is the sum of static lift, friction loss through the force main and fittings, and any residual pressure required at the discharge point, and the pump is selected where the system curve crosses the pump curve.

FPC Section 712.3.2 requires the discharge piping of a sump or ejector to include a full open valve located on the discharge side of a check valve, so the check valve can be serviced without draining the force main.

Calculate buoyancy from submerged exterior volume, then compare it with permitted resisting loads and safety factors; it is not automatically the governing load.

A wet well is a permit-required confined space under OSHA 29 CFR 1926 Subpart AA, requiring atmospheric testing in the order of oxygen, then flammable gases and vapors, then toxic air contaminants, before entry.

Last updated: October 2026

Sewage Lift Stations & Force Mains

Chapter 3 covered building sewage ejectors and sumps under FPC Section 712. This section extends the learning to site lift stations and force mains that move wastewater where gravity conveyance is not feasible. Local exam coverage must be checked in the approved local outline.

Gravity and pumped conveyance are evaluated against terrain, receiving elevations, utility requirements, reliability and lifecycle needs. High groundwater adds excavation and structural demands, but its actual elevation must come from site investigation.

1. Station Architecture

Type Arrangement Where Used

Submersible wet well Pumps sit submerged in the wet well on guide rails and lift out for service Avoids a separate dry pump chamber; footprint, access and lifecycle cost remain project-specific

Wet well / dry well Wet well holds the sewage; pumps sit in an adjacent dry chamber Large municipal stations where pumps must be serviced without lifting

Grinder station Grinder pump macerates solids and pushes through small-diameter force main Individual homes and clusters on low-pressure sewer systems

Pneumatic ejector Compressed air displaces sewage from a receiver Rare today; still found in older institutional buildings

A duplex submersible station consists of a wet well (usually precast concrete or fiberglass), two pumps with duty/standby or duty/assist capacity defined by the approved design, guide rails and lifting chains , a level control system , a valve vault containing the check valves and isolation valves, a control panel with alternator and alarm, and the force main leaving the site.

Level Control and Alternation

A common control example uses float switches, pressure transducers or ultrasonic sensors to establish four elevations:

Pump off (low level) — set for the manufacturer’s required submergence, cooling and operating limits.

Lead pump on — sets the working volume between starts.

Lag pump on — the second pump joins during peak inflow.

High-level alarm — annunciated locally and usually by telemetry.

In this example the controller alternates lead and lag on each cycle to equalize wear. Working volume matters: too small and the pumps short-cycle and burn up motors; too large and sewage sits septic in the well generating hydrogen sulfide.

2. The Valve Order on a Pumped Discharge

The Florida Plumbing Code fixes the sequence on building sumps and ejectors, and site stations follow the same logic:

FPC Section 712.3.2 — the discharge piping shall have a full open valve located on the discharge side of a backwater or check valve .

Reading it from the pump outward: pump, then check valve, then full open (isolation) valve, then the force main. The reason is maintenance. With the isolation valve downstream of the check, a technician can close the isolation valve, hold the head of the full force main behind it, and pull or service the check valve without draining the entire line back into the well.

FPC Section 712.3.3 governs the discharge pipe size, and Section 712.3.5 the connection of the pump discharge to the gravity drainage system. On a site station, the force main typically discharges into a manhole with an energy-dissipating arrangement so the incoming jet does not scour the invert or splash the bench.

One exception worth remembering: in one- and two-family dwellings, only a check valve is required , located on the discharge piping from the pump or ejector.

  • 3. Sizing the Force Main
  • Balance Solids Transport, Friction and Surge

Force-main design balances solids transport with friction, surge, retention time and operating cycles. Low velocity can permit deposition; excessive velocity can increase energy demand and transient loads. Neither water mains nor force mains are designed from just one upper or lower velocity number.

For the supplied design exercise below , the utility criteria set an acceptable operating velocity band of 2–8 ft/s . These are exercise inputs, not universal Florida limits or a guarantee of self-cleansing under every sewage condition. The selected design must also address low-flow periods, retention and the actual solids load.

Total Dynamic Head

The pump is selected on total dynamic head (TDH) : T D H = Static Lift + Friction Loss + Residual Discharge Head \mathbf{TDH = \text{Static Lift} + \text{Friction Loss} + \text{Residual Discharge Head}} TDH = Static Lift + Friction Loss + Residual Discharge Head

Static lift is the difference between the applicable upstream and downstream hydraulic elevations. It varies with wet-well level and receiving conditions. The example uses the pump-off level as its stated maximum-static-lift case and a free discharge elevation.

Friction loss is the head lost in the force main and every fitting, computed over the total equivalent length exactly as in water distribution sizing.

Residual discharge head is any pressure that must remain at the discharge, such as when a force main ties into a pressurized regional main rather than a free-discharging manhole.

The system curve is TDH plotted against flow. The pump's operating point is where the system curve crosses the manufacturer's pump curve, and a competent submittal shows that intersection falling inside the pump's best-efficiency range with the velocity meeting the applicable project criteria over the evaluated operating range.

Worked Example

A duplex submersible station serves a small Florida commercial park at a peak flow of 150 gpm . The selected nominal 4-inch pipe has a supplied internal flow area of 0.0884 ft² and is 900 feet long , with fittings adding 120 feet of equivalent length . The wet well pump-off level is at elevation 4.50 feet ; the receiving manhole invert is at elevation 31.00 feet . The supplied hydraulic-data exhibit gives 1.9 feet per 100 feet at 150 gpm for this selected pipe. Neither area nor friction rate is inferred from the nominal diameter or a generic C900 designation. The approved station specification requires either pump alone to meet the duty point; the stated loss data include the modeled system losses for this exercise.

Step 1 — Check the velocity. Use the exhibit’s 0.0884-ft² internal flow area. V = 150 gpm 448.8 gpm per cfs ÷ 0.0884 sq ft = 0.334 cfs 0.0884 = 3.8 feet per second V = \frac{150\text{ gpm}}{448.8\text{ gpm per cfs}} \div 0.0884\text{ sq ft} = \frac{0.334\text{ cfs}}{0.0884} = \mathbf{3.8\text{ feet per second}} V = 448.8 gpm per cfs 150 gpm ​ ÷ 0.0884 sq ft = 0.0884 0.334 cfs ​ = 3.8 feet per second

The calculated 3.78 ft/s meets this project’s 2–8 ft/s band. A candidate larger pipe with a supplied area of 0.1963 ft² would have 150/448.8/0.1963 = 1.70 ft/s, below that criterion. This establishes a design mismatch, not proof that sedimentation must occur instantly.

Step 2 — Static lift. 31.00 − 4.50 = 26.50 feet 31.00 - 4.50 = \mathbf{26.50\text{ feet}} 31.00 − 4.50 = 26.50 feet

Step 3 — Friction loss over total equivalent length. T E L = 900 + 120 = 1 , 020 feet TEL = 900 + 120 = 1,020\text{ feet} TE L = 900 + 120 = 1 , 020 feet h f = 1 , 020 100 × 1.9 = 19.38 feet h_f = \frac{1,020}{100} \times 1.9 = \mathbf{19.38\text{ feet}} h f ​ = 100 1 , 020 ​ × 1.9 = 19.38 feet

Step 4 — Residual head. The main free-discharges into a gravity manhole, so residual is 0 feet .

Step 5 — Total dynamic head. T D H = 26.50 + 19.38 + 0 = 45.88 feet, say 46 feet TDH = 26.50 + 19.38 + 0 = \mathbf{45.88\text{ feet, say 46 feet}} T DH = 26.50 + 19.38 + 0 = 45.88 feet, say 46 feet

Select a submersible pump delivering 150 gpm at 46 feet TDH , and confirm from the curve that the duty point is near best efficiency. Under this project’s stated duty/standby requirement, each pump alone must make that duty point . “Duplex” alone would not establish that requirement for every other station.

  • 4. Florida-Specific Design Problems
  • Evaluate the Empty-Structure Buoyancy Case

For a simplified fully submerged cylindrical exterior 6 feet in outside diameter and 20 feet in submerged height , displaced water volume is π × 3² × 20 = 565.49 ft³. At 62.4 pounds per cubic foot that is about 35,000 pounds of uplift on an empty structure — enough to float a wet well out of the ground during a wet season or a hurricane, shearing the incoming gravity sewer and the force main. Evaluate the empty structure at the design high groundwater level , comparing uplift with permitted resisting dead weight, soil contributions, anchorage and the required safety factor. Add approved resistance where the check fails; buoyancy is not automatically the governing structural load on every site. This is the same buoyancy analysis applied to interceptors in Chapter 3, scaled up.

Hydrogen Sulfide and Corrosion

Warm Florida sewage turns septic quickly. The countermeasures are: keep detention time in the wet well short by right-sizing the working volume, ventilate the wet well , line the receiving manhole with a corrosion-resistant coating, use corrosion-resistant valve vault components , and in chronic cases dose chemically at the station. Station hatches, guide rails and chains should be stainless steel , not galvanized, in a sulfide environment.

Standby Power

The approved reliability plan determines emergency power and storage needs. Options include a permanent standby generator with automatic transfer , or at minimum a quick-connect receptacle and manual transfer switch so a portable generator can be brought in. Storage volume in the wet well between the alarm level and the lowest gravity inlet buys the response time.

5. Entering a Wet Well Is Confined Space Work

A sewage wet well is a textbook permit-required confined space under OSHA 29 CFR 1926 Subpart AA — it is large enough to enter, has limited means of entry and egress, is not designed for continuous occupancy, and contains a hazardous atmosphere. Hydrogen sulfide is heavier than air, deadens the sense of smell at the concentrations that kill, and pools at the bottom of the well; methane displaces oxygen and is explosive.

Before entry, the atmosphere is tested in this exact order under 29 CFR 1926.1204(e) :

  • Oxygen content
  • Flammable gases and vapors
  • Potential toxic air contaminants

The order is not arbitrary: a combustible-gas meter gives a false reading in an oxygen-deficient atmosphere, so oxygen must be confirmed first. Evaluate and implement the applicable permit-space entry program, atmospheric testing/monitoring, isolation, ventilation where needed, attendant and authorized rescue arrangements. Do not treat continuous forced-air ventilation alone as universal authorization to enter, or assume a rescue plan allows an untrained coworker to enter impulsively. Any alternative entry procedure requires its own demonstrated eligibility. Chapter 11 develops the full Subpart AA program; the point here is that no lift station maintenance task is ever a two-minute unattended climb .

Loading diagram... Example duplex station: each pump has its own discharge valves