Study guide

0.1 Current Exam Facts: Trade Knowledge & Business & Finance

Florida Certified Roofing Contractor CCC

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

0.1 Current Exam Facts: Trade Knowledge & Business & Finance

2 Chapter 1: Licensing, Florida Statutes & Business Setup

1.1 DBPR, CILB & Florida Statute 489 Licensing Requirements 1.2 Entity Selection, Financial Stability & Credit Requirements 1.3 Continuing Education, Renewal & Disciplinary Actions

3 Chapter 2: Florida Roofing Law, Contracts & Consumer Protection

2.1 Florida Construction Lien Law (F.S. 713) & Notice to Owner Rules 2.2 Roofing Contract Requirements, Disclosures & Consumer Protections 2.3 Dispute Resolution, Construction Defects & Warranty Laws

4 Chapter 3: Accounting, Taxes, Payroll & Financial Management

3.1 Contractor Financial Statements, Ratios & Working Capital 3.2 Federal, State & Local Tax Compliance and Payroll Taxes 3.3 Insurance, Workers' Compensation & Risk Management 3.4 Managing Human Resources & Employment Law 3.5 Environmental Compliance: NPDES, Stormwater & Site Controls

5 Chapter 4: Roofing Estimating, Job Site & Project Management

4.1 Roofing Estimating, Takeoffs & Material Calculations 4.2 Job Site Operations, Scheduling & Quality Control 4.3 Subcontractor Management & Code Compliance Inspections

6 Chapter 5: Equipment, OSHA Safety & Fall Protection

5.1 OSHA 1926 Subpart M Fall Protection Standards for Roofing 5.2 Roofing Equipment Safety: Kettles, Hoists, Ladders & Scaffolding 5.3 Personal Protective Equipment, Hazardous Materials & Heat Stress

7 Chapter 6: Built-Up Roofing (BUR) & Modified Bitumen Systems

6.1 Built-Up Roof (BUR) System Design, Substrates & Insulation 6.2 BUR Application Techniques: Hot Asphalt, Torch & Cold-Applied 6.3 Modified Bitumen (APP & SBS) Systems & Flashings 6.4 BUR & Mod Bit Maintenance, Repairs & Test Cuts

8 Chapter 7: Single-Ply Roofing & Architectural Metal Systems

7.1 Single-Ply Membranes: TPO, EPDM & PVC Systems 7.2 Single-Ply Attachment Methods: Adhered, Mechanically Fastened & Ballasted 7.3 Architectural & Structural Metal Roofing Systems 7.4 Metal Roof Flashing, Underlayments & Thermal Movement

9 Chapter 8: Steep-Slope Roof Assemblies & Fastening Systems

8.1 Asphalt Shingle Installation, Underlayment & Ventilation Requirements 8.2 Wood Shingles, Wood Shakes & Synthetic Slate Materials 8.3 Concrete & Clay Tile Roof Systems: Loading, Layout & Underlayment 8.4 Tile Roof Fastening: Mechanical, Mortar & Two-Component Adhesive Systems

10 Chapter 9: Waterproofing, Drainage & High-Velocity Hurricane Zone (HVHZ) Provisions

9.1 Below-Grade & Above-Grade Membrane Waterproofing & Dampproofing 9.2 Roof Drains, Scuppers, Gutters, Downspouts & Overflow Systems 9.3 Florida Building Code (FBC) General Roofing Requirements 9.4 High-Velocity Hurricane Zone (HVHZ) Standards (Miami-Dade/Broward FBC Sec 1512-1525)

0.1 Current Exam Facts: Trade Knowledge & Business & Finance

Key Takeaways Explain This Topic AI

Florida Certified Roofing Contractor candidates must pass two separate open-book CBT exams: Trade Knowledge (80 scored questions, 5 hours) and Business & Finance (120 scored questions, 6.5 hours).

The minimum passing score on each part is 70%, and construction exam scores are not rounded to the nearest percent (Candidate Information Booklet).

Trade content weights follow the DBPR Roofing ECI (BUR, shingles/shakes, metal, single-ply, modified, tile, waterproofing, drains, equipment/safety); Business & Finance follows the statewide B&F ECI.

Exams are scheduled through Professional Testing, Inc. eligibility and Pearson VUE administration; only current approved reference books listed for the exam year may be used.

Candidates must complete licensure application with DBPR/CILB after passing; exam scores are time-limited under board rules for obtaining the license.

Last updated: July 2026

0.1 Current Exam Facts: Trade Knowledge & Business & Finance

Source of truth: Florida DBPR Construction Examinations pages, the Construction Candidate Information Booklet (CIB), Roofing Trade Knowledge Examination Content Information ( roof_eci.pdf ), and Business & Financial Management Examination Content Information ( bus_fin_eci.pdf ).

Florida's Certified Roofing Contractor (CCC) pathway is a Division II specialty. You must pass both of the following computer-based, open-book examinations (unless you hold a qualifying Business & Finance exemption from another Florida construction license category):

  • Exam Part Scored Questions Time Allowed Administration
  • Roofing Trade Knowledge 80 equally weighted multiple-choice 5 hours Daily CBT (Pearson VUE after PTI approval)

Business & Finance 120 multiple-choice (Service Pool is a different 60-question product—not CCC) 6.5 hours Daily CBT

Passing Score

The CIB sets the minimum percentage score at seventy percent (70%) . Scores on construction exams are NOT rounded to the nearest percent. You must clear 70% on each required part—excelling on Trade does not offset a failing Business & Finance score.

Official Trade Content Weights (Roofing ECI)

Area Weight Focus

A Built-Up Roofs 15% Gravel stops, test cuts, surfacings (including coatings/SPF/aggregate/cap sheets), decks, felts, coal tar, flashing, maintenance

B Shingles and Shakes 15% Material selection, layout methods, wood shakes/shingles, valleys, ridges, drip edges, ventilation, flashing, repair

C Architectural Metal Roofs 10% Metal roofs/shingles, fasteners, sealants, underlayment, flashing, maintenance

D Single-Ply Systems 15% Adhered, heat-applied, mechanically fastened systems; seaming; insulation; flashing; repair

E Modified Roofing Systems 15% APP, SBS, self-adhered; adhesive and heat application; insulation; flashing

F Concrete and Clay Tile Roofs 10% Loads, layout, adhesives, mortar/foam/fastening, underlayment, ventilation, repair

  • G Membrane Waterproofing 5% Below-grade walls and floor slabs; primers; hydrostatic pressure; hot/cold methods
  • H Drains and Gutters 5% Scuppers/overflow, gutters/downspouts, leaders/conductor heads

I Equipment and Safety 10% Ladders, scaffolds, hoists, lifts, kettles, heat welding, roof jacks, spudding, compressors/pneumatic tools, fall protection

Cross-cutting skills explicitly listed for the trade exam include reading plans/specifications, reading codes, and trade mathematics (areas, volumes, triangles, percentages, simple algebra).

Official Business & Finance Content Weights

Area Weight Focus

A Establishing the Contracting Business 11% Entity structure, business plan, professional relationships, fixed assets, obtaining insurance

B Managing Administrative Duties 26% Overhead, bids/proposals, purchasing, invoices/draws, safety program, insurance, contracts

C Managing Trade Operations 10% Scheduling (including CPM concepts), OSHA records, materials/equipment, inventory

  • D Conducting Accounting Functions 32% AR/AP, cash flow/ratios, taxes, job cost, payroll
  • E Managing Human Resources 6% Hiring, HR policies, evaluating employees

F Complying with Government Regulations 15% Federal (OSHA, tax, NPDES/environmental, immigration components) and Florida law (Ch. 455, 489, 713, 61G4, workers' compensation, CE)

Registration Path

Apply with Professional Testing, Inc. (floridaexam.com) for the CCC exam parts.

After approval, schedule CBT seats with Pearson VUE (Florida DBPR Construction program).

Bring only current approved references for the exam year (Trade reference list is separate from the Business & Finance list).

After passing, file the DBPR/CILB licensure application (e.g., CILB 5-I / 6-I) with experience, credit, insurance, and fingerprint packages within the board's score-validity window.

Treat every logistics number in this section as a high-value exam fact: 80 / 5 hours , 120 / 6.5 hours , 70% unrounded , two separate sittings .

Approved References and Open-Book Strategy

Both sittings are open-book, but that does not mean open-laptop or open-internet. Only the bound reference titles on the current DBPR reference list for that exam part may enter the testing room. Trade Knowledge uses the roofing CBT reference list (estimator manuals, OSHA 29 CFR 1926, SMACNA sheet-metal manual, Florida Building Code volumes, and other titles as listed for the exam year). Business & Finance uses its own finance/law list. Bringing a superseded edition is at your own risk: answers are keyed to the editions named on the official list.

Practical open-book tactics that mirror how items are written:

Tab manufacturer-neutral topics (fall protection trigger heights, kettle extinguisher ratings, Notice to Owner timing) before test day—movable Post-it flags are often prohibited; use permanent tabs if the rules allow.

Practice locating table values (nail schedules, clearance tables, insurance minima) under timed conditions rather than memorizing every number in isolation.

Expect scenario stems that force you to choose between two plausible code sections; the better answer matches the most specific applicable rule.

Score Reports, Retakes, and License Timing

Pearson VUE issues an on-site result report after CBT. Failing candidates may use DBPR review/challenge procedures described in the CIB for their most recent examination under department terms. Retake waiting periods and fees are set by current board/vendor rules—always confirm on the authorization notice rather than relying on third-party blogs.

Passing both parts is necessary but not sufficient for a CCC license. You still must:

Document qualifying experience (typically four years with at least one year as foreman/supervisor, or an approved education-plus-experience track)

  • Satisfy financial responsibility (660 FICO-derived score or remediation)
  • Maintain workers' compensation and public liability/property damage insurance at Rule 61G4-15.003 minima
  • Complete fingerprinting/background and the DBPR application package

Board rules historically require obtaining the license within a limited window after receiving passing scores—treat stale scores as a scheduling risk and file promptly.

How This Guide Maps to the Two Exams

Business & Finance-heavy chapters: licensing statutes, entity/credit, CE/discipline, lien law, contracts, accounting, taxes/payroll, insurance, HR, NPDES/environmental, estimating/jobsite administration.

Trade-heavy chapters: OSHA/equipment, BUR and modified bitumen, single-ply and metal, steep-slope shingles/shakes/tile, waterproofing, drains, FBC, and HVHZ.

Use the content-weight tables above to allocate study hours: accounting (32%) and administrative duties (26%) dominate B&F, while BUR, shingles/shakes, single-ply, and modified systems each carry 15% on Trade.