Study guide

16.3 Flows, Loadings, Removal Efficiency & Solids Math

Florida Water/Wastewater Operator Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & FDEP Certification Framework

1.1 Current Exam Facts & PSI Logistics 1.2 License Families, Classes A–D & Distribution Levels 1.3 Examination Eligibility, Approved Courses & Linear Progression 1.4 Licensure Experience, Fees, Renewal & CEUs

2 Florida Regulations & Water Law

2.1 Chapter 62-602 Operator Certification Rules 2.2 FAC 62-550 Drinking Water Standards & SDWA Primacy 2.3 FAC 62-600 Wastewater & AWT 5-5-3-1 Standards 2.4 FAC 62-610 Reclaimed Water Reuse Rules

3 Source Water & Florida Hydrogeology

3.1 Characteristics of Source Water & Contaminants 3.2 Floridan Aquifer, Wells & Saltwater Intrusion 3.3 Reservoir, Wellfield Management & Water Management Districts

4 Coagulation, Flocculation & Sedimentation

4.1 Coagulation Chemistry & Jar Testing 4.2 Flocculation Process Control 4.3 Clarification & Sedimentation

5 Filtration & Membrane Processes

5.1 Granular Media Filtration Theory 5.2 Filter Operation, Backwash & Troubleshooting 5.3 Membrane Filtration & Reverse Osmosis (Florida RO)

6 Softening, Iron/Manganese & Taste/Odor Control

6.1 Lime Softening & Ion Exchange 6.2 Iron and Manganese Control 6.3 Taste and Odor Control & Aeration

7 Disinfection & Disinfectant Byproducts

7.1 Chlorination Chemistry & Residual Control 7.2 CT Calculations & Pathogen Inactivation 7.3 Alternative Disinfectants (Chloramines, ClO2, Ozone, UV) 7.4 DBP Formation, Stage 1/2 Rules & Compliance

8 Corrosion Control & Chemical Treatment

8.1 Corrosion Control & Lead and Copper Rule 8.2 Chemical Treatment, Fluoridation & Feed Systems 8.3 Residuals Disposal & Waste Handling

9 Wastewater Collection, Preliminary & Primary Treatment

9.1 Collection Systems, Lift Stations & SSO Reporting 9.2 Preliminary Treatment: Screening & Grit 9.3 Primary Sedimentation 9.4 Wastewater Characteristics & Plant Loadings

10 Secondary Treatment & Activated Sludge

10.1 Secondary Process Fundamentals 10.2 Activated Sludge Process Control 10.3 Activated Sludge Troubleshooting 10.4 Fixed-Film, Package Plants & Lagoons

11 Nutrient Removal, AWT & Reuse

11.1 Biological Nutrient Removal (N & P) 11.2 Florida AWT 5-5-3-1 Standards 11.3 Effluent Disposal Options 11.4 Reclaimed Water Systems & FAC 62-610 Practice

12 Solids Handling & Biosolids

12.1 Sludge Thickening & Digestion 12.2 Dewatering & Residuals Disposal 12.3 Biosolids Stabilization & Land Application Basics

13 Distribution Systems & Hydraulics

13.1 Distribution Network Design & Operations 13.2 Pipes, Valves, Hydrants & Appurtenances 13.3 Hydraulics, Pressure & Pumping 13.4 Main Disinfection, Breaks & Repair

14 Cross-Connection, Storage & Distribution Water Quality

14.1 Cross-Connection Control & Backflow Prevention 14.2 Storage Tanks & Reservoirs 14.3 Distribution Water Quality, Flushing & Residual Management

15 Laboratory Testing & Sampling

15.1 Sampling, Preservation & Chain of Custody 15.2 Physical & Chemical Water Analysis 15.3 Wastewater Process Lab Testing 15.4 Microbiological Testing & QA/QC

16 Operator Math

16.1 Math Fundamentals, Conversions & Formula Sheets 16.2 Dosage, Chemical Feed & Detention Time 16.3 Flows, Loadings, Removal Efficiency & Solids Math 16.4 Pump Hydraulics & Horsepower

17 Safety, Security & Emergency Preparedness

17.1 Confined Space, LOTO, PPE & Chemical Safety 17.2 Chlorine Gas Safety & Emergency Response 17.3 Security, Hurricane Preparedness & Contingency Planning (Florida)

18 Equipment, O&M & Administration

18.1 Operate & Maintain Plant Equipment 18.2 Process Control Instrumentation & SCADA Basics 18.3 Records, Reporting & Administrative Duties

16.3 Flows, Loadings, Removal Efficiency & Solids Math

Key Takeaways Explain This Topic AI

Hydraulic loading is Q/A (e.g., clarifier gpd/ft² or filter gpm/ft²).

Organic and solids loads use MGD × mg/L × 8.34 for lb/day.

% removal = (in − out)/in × 100 using matching concentration units.

Simple SRT ≈ solids inventory ÷ (WAS + effluent SS) lb/day.

Wet cake tons = dry mass ÷ (decimal % solids) ÷ 2,000 lb/ton.

Last updated: August 2026

16.3 Flows, Loadings, Removal Efficiency & Solids Math

Quick Answer: Hydraulic loading compares flow to area (gpd/ft² or similar). Organic loading uses the pounds formula on BOD (or COD): MGD × mg/L × 8.34 . Percent removal is ( C in − C out ) / C in × 100 (C_{\text{in}} - C_{\text{out}}) / C_{\text{in}} \times 100 ( C in ​ − C out ​ ) / C in ​ × 100 . Solids mass balances use the same 8.34 factor for WAS , inventory, and simple SRT/sludge age . Wet tons of cake scale dry solids by cake percent solids.

Wastewater Class C exams lean hard on loadings and solids. Water treatment operators still need removal efficiency and filter hydraulic loading. The algebra is shared.

1. Hydraulic Loading

Hydraulic loading rate (HLR) expresses how much flow is applied per unit area (or sometimes per unit volume for towers). HLR = Q A \text{HLR} = \frac{Q}{A} HLR = A Q ​

  • Process (examples) Typical expression Operator use
  • Sedimentation tank gpd/ft² Overflow rate
  • Trickling filter gpd/ft² (media surface plan) Wetting rate
  • Sand filter gpm/ft² Filtration rate
  • Lagoon lb BOD/acre·day is organic; hydraulic is inches/day etc. Design checks
  • Worked Example 1 — Clarifier Overflow Rate

Secondary clarifier diameter 60 ft , flow 2.0 MGD .

Area: A = 0.785 × 60 2 = 0.785 × 3,600 = 2,826 ft 2 A = 0.785 \times 60^2 = 0.785 \times 3{,}600 = 2{,}826\ \text{ft}^2 A = 0.785 × 6 0 2 = 0.785 × 3 , 600 = 2 , 826 ft 2

HLR (gpd/ft²): 2.0 MGD = 2,000,000 gpd. HLR = 2,000,000 / 2,826 ≈ 708 gpd/ft 2 \text{HLR} = 2{,}000{,}000 / 2{,}826 \approx 708\ \text{gpd/ft}^2 HLR = 2 , 000 , 000/2 , 826 ≈ 708 gpd/ft 2

Worked Example 2 — Filter Rate

Filter area 200 ft² , flow 600 gpm . Rate = 600 / 200 = 3.0 gpm/ft 2 \text{Rate} = 600 / 200 = 3.0\ \text{gpm/ft}^2 Rate = 600/200 = 3.0 gpm/ft 2

2. Organic Loading (lb BOD/day and Related) lb BOD/day = Q ( MGD ) × BOD (mg/L) × 8.34 \text{lb BOD/day} = Q\ (\text{MGD}) \times \text{BOD (mg/L)} \times 8.34 lb BOD/day = Q ( MGD ) × BOD (mg/L) × 8.34

Same form works for TSS, COD, nitrogen , etc.: lb/day = Q × C × 8.34 \text{lb/day} = Q \times C \times 8.34 lb/day = Q × C × 8.34

Volumetric organic loading (e.g., aeration tank): lb BOD/day per 1,000 ft 3 = lb BOD/day V ft 3 / 1,000 \text{lb BOD/day per 1,000 ft}^3 = \frac{\text{lb BOD/day}}{V_{\text{ft}^3}/1{,}000} lb BOD/day per 1,000 ft 3 = V ft 3 ​ /1 , 000 lb BOD/day ​

Worked Example 3 — Plant BOD Load

Influent BOD 220 mg/L , flow 1.5 MGD . lb BOD/day = 1.5 × 220 × 8.34 = 330 × 8.34 = 2,752 lb/day \text{lb BOD/day} = 1.5 \times 220 \times 8.34 = 330 \times 8.34 = 2{,}752\ \text{lb/day} lb BOD/day = 1.5 × 220 × 8.34 = 330 × 8.34 = 2 , 752 lb/day

Worked Example 4 — Aeration Tank Loading

Same 2,752 lb BOD/day into aeration volume 120,000 ft³ . lb/day per 1,000 ft 3 = 2,752 / 120 = 22.9 lb BOD/day / 1,000 ft 3 \text{lb/day per 1,000 ft}^3 = 2{,}752 / 120 = 22.9\ \text{lb BOD/day}/1{,}000\ \text{ft}^3 lb/day per 1,000 ft 3 = 2 , 752/120 = 22.9 lb BOD/day /1 , 000 ft 3

(Because 120,000 / 1,000 = 120 “thousands.”)

3. Percent Removal Efficiency % Removal = C in − C out C in × 100 \%\ \text{Removal} = \frac{C_{\text{in}} - C_{\text{out}}}{C_{\text{in}}} \times 100 % Removal = C in ​ C in ​ − C out ​ ​ × 100

Rule Meaning

Use same units in and out Both mg/L BOD, both mg/L TSS, etc.

Do not subtract loads unless asked Concentration form is standard for “% removal”

95% removal of 200 mg/L → 10 mg/L out C out = C in ( 1 − % / 100 ) C_{\text{out}} = C_{\text{in}}(1 - \%/100) C out ​ = C in ​ ( 1 − %/100 )

Worked Example 5 — BOD Removal

Influent BOD 220 mg/L , effluent BOD 12 mg/L . % Removal = 220 − 12 220 × 100 = 208 220 × 100 = 94.5 % \%\ \text{Removal} = \frac{220 - 12}{220} \times 100 = \frac{208}{220} \times 100 = 94.5\% % Removal = 220 220 − 12 ​ × 100 = 220 208 ​ × 100 = 94.5%

Worked Example 6 — Required Effluent from Target Removal

Influent TSS 180 mg/L , need 90% removal. Max effluent TSS: C out = 180 × ( 1 − 0.90 ) = 18 mg/L C_{\text{out}} = 180 \times (1 - 0.90) = 18\ \text{mg/L} C out ​ = 180 × ( 1 − 0.90 ) = 18 mg/L

Worked Example 7 — Load Removed

Flow 2.0 MGD , influent BOD 200 mg/L, effluent 20 mg/L.

  • Influent load: 2 × 200 × 8.34 = 3,336 2 \times 200 \times 8.34 = 3{,}336 2 × 200 × 8.34 = 3 , 336 lb/day
  • Effluent load: 2 × 20 × 8.34 = 333.6 2 \times 20 \times 8.34 = 333.6 2 × 20 × 8.34 = 333.6 lb/day
  • Removed: 3,336 − 334 ≈ 3,002 3{,}336 - 334 ≈ 3{,}002 3 , 336 − 334 ≈ 3 , 002 lb/day

% removal: ( 200 − 20 ) / 200 × 100 = 90 % (200-20)/200 × 100 = 90\% ( 200 − 20 ) /200 × 100 = 90% (matches concentration %)

4. Solids Math — WAS, Inventory, Simple SRT

Mass of solids in a flow: lb/day solids = Q MGD × SS (mg/L) × 8.34 \text{lb/day solids} = Q_{\text{MGD}} \times \text{SS (mg/L)} \times 8.34 lb/day solids = Q MGD ​ × SS (mg/L) × 8.34

Mass of solids in a tank (inventory): lb solids = V MG × MLSS (mg/L) × 8.34 \text{lb solids} = V_{\text{MG}} \times \text{MLSS (mg/L)} \times 8.34 lb solids = V MG ​ × MLSS (mg/L) × 8.34

(Use MG of aeration + clarifier inventory only if the problem defines system volume that way.)

Simple sludge age / SRT (operator exam form): SRT (days) ≈ lb solids in system lb solids leaving system per day \text{SRT (days)} \approx \frac{\text{lb solids in system}}{\text{lb solids leaving system per day}} SRT (days) ≈ lb solids leaving system per day lb solids in system ​

Solids leaving ≈ WAS lb/day + effluent SS lb/day (if significant). Many basic problems use WAS only when effluent SS is neglected by the stem.

Worked Example 8 — WAS Solids

Waste 0.05 MGD of sludge at 8,000 mg/L SS. lb/day WAS = 0.05 × 8,000 × 8.34 = 400 × 8.34 = 3,336 lb/day \text{lb/day WAS} = 0.05 \times 8{,}000 \times 8.34 = 400 \times 8.34 = 3{,}336\ \text{lb/day} lb/day WAS = 0.05 × 8 , 000 × 8.34 = 400 × 8.34 = 3 , 336 lb/day

Worked Example 9 — Simple SRT

Aeration tank volume 0.40 MG , MLSS 2,500 mg/L . WAS solids 2,000 lb/day (ignore effluent SS).

Inventory: 0.40 × 2,500 × 8.34 = 1,000 × 8.34 = 8,340 lb 0.40 \times 2{,}500 \times 8.34 = 1{,}000 \times 8.34 = 8{,}340\ \text{lb} 0.40 × 2 , 500 × 8.34 = 1 , 000 × 8.34 = 8 , 340 lb

SRT: SRT = 8,340 / 2,000 = 4.17 days \text{SRT} = 8{,}340 / 2{,}000 = 4.17\ \text{days} SRT = 8 , 340/2 , 000 = 4.17 days

Worked Example 10 — Include Effluent Solids

Same inventory 8,340 lb. WAS 2,000 lb/day. Effluent flow 1.5 MGD at 10 mg/L SS. lb/day effluent SS = 1.5 × 10 × 8.34 = 125.1 lb/day \text{lb/day effluent SS} = 1.5 \times 10 \times 8.34 = 125.1\ \text{lb/day} lb/day effluent SS = 1.5 × 10 × 8.34 = 125.1 lb/day SRT = 8,340 / ( 2,000 + 125 ) ≈ 8,340 / 2,125 ≈ 3.92 days \text{SRT} = 8{,}340 / (2{,}000 + 125) \approx 8{,}340 / 2{,}125 \approx 3.92\ \text{days} SRT = 8 , 340/ ( 2 , 000 + 125 ) ≈ 8 , 340/2 , 125 ≈ 3.92 days

5. Wet Tons of Cake (Dewatering)

Dewatered cake is reported as % total solids (wet basis). Dry solids lb = Wet cake lb × ( decimal % solids ) \text{Dry solids lb} = \text{Wet cake lb} \times (\text{decimal \% solids}) Dry solids lb = Wet cake lb × ( decimal % solids ) Wet tons = Dry tons decimal % solids \text{Wet tons} = \frac{\text{Dry tons}}{\text{decimal \% solids}} Wet tons = decimal % solids Dry tons ​

Also: 1 ton = 2,000 lb .

Worked Example 11 — Wet Tons from Dry Solids

A belt press produces 1,200 lb/day dry solids as 20% cake. Wet lb/day = 1,200 / 0.20 = 6,000 lb/day \text{Wet lb/day} = 1{,}200 / 0.20 = 6{,}000\ \text{lb/day} Wet lb/day = 1 , 200/0.20 = 6 , 000 lb/day Wet tons/day = 6,000 / 2,000 = 3.0 wet tons/day \text{Wet tons/day} = 6{,}000 / 2{,}000 = 3.0\ \text{wet tons/day} Wet tons/day = 6 , 000/2 , 000 = 3.0 wet tons/day

Worked Example 12 — Hauling Check

Plant wastes 3,336 lb/day WAS solids (from Example 8). After digestion/thickening assume 80% of that mass is dewatered at 18% cake (simplified exam chain).

Dry to press ≈ 0.80 × 3,336 = 2,669 0.80 × 3{,}336 = 2{,}669 0.80 × 3 , 336 = 2 , 669 lb/day dry. Wet lb/day = 2,669 / 0.18 ≈ 14,827 lb/day ≈ 7.4 wet tons/day \text{Wet lb/day} = 2{,}669 / 0.18 \approx 14{,}827\ \text{lb/day} \approx 7.4\ \text{wet tons/day} Wet lb/day = 2 , 669/0.18 ≈ 14 , 827 lb/day ≈ 7.4 wet tons/day

6. Formula Sheet for This Section

  • Quantity Formula
  • Hydraulic loading (Q / A)
  • lb/day (BOD, SS, etc.) MGD × mg/L × 8.34

% removal ( C in − C out ) / C in × 100 (C_{\text{in}}-C_{\text{out}})/C_{\text{in}} × 100 ( C in ​ − C out ​ ) / C in ​ × 100

  • Tank solids inventory MG × mg/L × 8.34
  • WAS lb/day WAS MGD × SS mg/L × 8.34
  • Simple SRT inventory lb ÷ (WAS + effluent SS) lb/day
  • Wet cake mass dry mass ÷ decimal % solids
  • 7. Exam Strategy — Loadings & Solids

If the stem gives mg/L and MGD , reach for 8.34 immediately.

% removal almost always uses concentrations, not a mix of load and concentration.

SRT denominators: read carefully whether effluent SS is included.

Cake problems: % solids is wet basis unless stated otherwise—wet tons > dry tons.

Overflow rate: convert MGD → gpd before dividing by ft².

Florida wastewater items often combine a loading question with a removal or WAS follow-on in separate stems—each still uses the same pounds engine.