Study guide

3.5 Cleanouts: Placement, Sizing, Clearances & Access Requirements

Iowa Journeyperson Plumber Study Guide Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Iowa Licensing, Exam Format, Code Adoption & UPC General Regulations

1.1 Iowa Licensing Tiers, PMSB Rules, Code Adoption, Permits & Inspections 1.2 UPC Chapter 3 General Regulations: Trenching, Protection of Piping & Iowa Burial Depths 1.3 Plumbing Mathematics, Pipe Sizing Formulas & Blueprint Reading 1.4 Hangers, Supports, Pipe Joints, and Material Compatibility 1.5 Exam Format, Approved References & Open-Book Lookup Strategy

2 Chapter 2: Plumbing Fixtures & Fixture Fittings (UPC Chapter 4)

2.1 Fixture Unit Values & Iowa Minimum Plumbing Fixture Requirements 2.2 Water Closets, Urinals, Bidets & Lavatories 2.3 Bathtubs, Showers, Sinks & Food Prep Fixtures 2.4 Plumbing Fixture Installation Standards & ADA Accessibility 2.5 Specialty Appliances, Floor Drains, Indirect Waste & Interceptors

3 Chapter 3: Sanitary Drainage & Building Sewers (UPC Chapter 7)

3.1 Sanitary Drainage System Components, Layout & Gravity Flow Principles 3.2 Drainage Fixture Unit (DFU) Values & Horizontal/Vertical Sizing 3.3 Building Sewers, Building Drains & Sewer Connection Standards 3.4 Drain Slopes, Velocities & Changes of Direction (UPC 706.0 and 708.0) 3.5 Cleanouts: Placement, Sizing, Clearances & Access Requirements 3.6 Sump Pumps, Sewage Ejectors & Backwater Valves 3.7 Drainage Materials, Joints, Prohibited Practices & DWV Testing 3.8 Sizing a Complete DWV System: Two Worked Walkthroughs

4 Chapter 4: Venting Systems (UPC Chapter 9)

4.1 Venting Fundamentals, Trap Seal Protection & the Iowa Trap Arm Table 4.2 Vent Sizing from UPC Table 703.2, Vent Stacks & Yoke Vents 4.3 Wet Venting Under UPC Section 908 and the Iowa Sizing Amendment 4.4 Venting Fixture Batteries: Common Vents, Relief Vents & Why Circuit Venting Is Not an Iowa Method 4.5 Air Admittance Valves, Combination Waste & Vent, and Island Venting 4.6 Vent Termination, Roof Penetrations & Flashings 4.7 Applying the Vent Rules: Worked Venting Walkthroughs 4.8 Diagnosing Venting Failures: Symptom-to-Cause Troubleshooting

5 Chapter 5: Traps, Interceptors & Indirect Waste (UPC Chapters 8 and 10)

5.1 Trap Design, Seals, Prohibited Traps & Trap Primers 5.2 Indirect & Special Waste Receptors and Air Gaps 5.3 Grease Interceptors & Trap Sizing (Hydromechanical & Gravity) 5.4 Oil, Sand, Flammable Liquid & Chemical Interceptors

6 Chapter 6: Water Supply & Distribution (UPC Chapter 6)

6.1 Water Service Piping, Main Sizing & Meter Installation 6.2 Water Supply Fixture Units (WSFU) & Pipe Sizing Calculations 6.3 Water Pressure Regulators, Pressure Relief & Thermal Expansion 6.4 Backflow Prevention: Cross-Connection Control & Device Selection 6.5 Potable Water Pipe Materials, Valves & Disinfection

7 Chapter 7: Water Heaters (UPC Chapter 5)

7.1 Water Heater Types, Sizing, Recovery Rate & First-Hour Rating 7.2 Water Heater Safety: T&P Relief Valves, Drain Pans, Combustion Air & Anti-Scald Controls 7.3 Water Heater Venting: Appliance Categories, Vent Connectors, Chimneys & Terminations 7.4 Water Heater Location, Clearances, Supports, Replacement & Iowa Amendments

8 Chapter 8: Storm Drainage (UPC Chapter 11)

8.1 Storm Drainage Scope, Materials, Traps & Prohibited Connections 8.2 Sizing Roof Drains, Leaders & Vertical Rainwater Piping (UPC Table 1103.1) 8.3 Sizing Horizontal Storm Drains, Storm Sewers & Gutters (UPC Tables 1103.2 and 1103.3) 8.4 Side Walls Draining Onto a Roof, Secondary Roof Drainage & Controlled-Flow Roofs 8.5 Subsoil Drains, Areaway Drains, Storm Sumps & Building Storm Sewers

9 Chapter 9: Fuel Gas Piping & Appliance Venting (UPC Chapter 12)

7.1 Iowa Fuel Gas Authority (UPC Chapter 12), Gas Properties, System Types & Regulators 7.2 Gas Pipe Sizing Calculations, Longest Length & Branch Method 7.3 Gas Pipe Materials, Joining, CSST Rules Under the Iowa Amendments, Outlets & Valves 7.4 Fuel Gas Appliance Installation, Clearances & Combustion Air 7.5 Fuel Gas Venting Systems, Chimneys & Safety Testing

3.5 Cleanouts: Placement, Sizing, Clearances & Access Requirements

Key Takeaways Explain This Topic AI

Cleanouts are required at the upper end of horizontal drainage runs, at the junction of building drain and building sewer, where aggregate changes of direction exceed 135 degrees, at intervals not exceeding 100 feet, and at the base of stacks.

UPC Section 707.9 requires 12 inches of clearance in front of cleanouts on piping smaller than 3 inches and 18 inches on piping 3 inches and larger.

Cleanout size follows UPC Table 707.1; the table caps the required cleanout size for large drains rather than matching pipe size indefinitely.

Each cleanout must open in the direction of flow or at right angles to it, and cleanout plugs may never be covered with cement, plaster, or permanent finish material.

Cleanout plugs in floors, walkways, or traffic areas use countersunk heads so the plug sits flush with the finished surface.

Last updated: August 2026

  • Cleanouts: Placement, Sizing, Clearances & Access Requirements
  • Purpose of Cleanouts

A plumbing cleanout is an accessible opening in a drainage system featuring a removable plug or cap, installed to permit mechanical clearing of blockages, snake insertion, and hydro-jetting. Without properly located cleanouts, drain clearing requires cutting piping or removing fixtures.

Under UPC Section 707.0 , cleanouts must be designed and positioned so that cleaning tools can reach every foot of internal horizontal drainage piping.

Mandatory Cleanout Locations (UPC Section 707.4)

Cleanouts must be installed at the following five specific locations in a sanitary drainage system: SUMMARY OF MANDATORY CLEANOUT LOCATIONS

  • 1. Upper End of Horizontal Run ──────► [CO] ─── (Highest Fixture Run)
  • 2. Base of Vertical Stack ────────────► [CO] ─── (Base Stack Fitting)
  • 3. Direction Changes > 135° ──────────► [CO] ─── (e.g., Two 90° Bends)
  • 4. Straight Horizontal Runs ──────────► [CO] ─── (Every 100 Feet Max)
  • 5. Building Drain / Sewer Connection ─► [CO] ─── (Inside or Outside Wall)

Upper End of Horizontal Drainage Piping: Every horizontal drainage pipe must have a cleanout at its upper terminal end.

Exception: Drains less than 5 feet in length measured from the stack or main line, or horizontal branches serving only one fixture (such as a lavatory) located aboveground where the trap is easily removable.

Building Drain / Building Sewer Junction: At or near the junction of the building drain and the building sewer outside or inside the foundation wall. An exterior two-way cleanout tee is preferred.

Changes of Direction: On horizontal drains for aggregate changes of direction exceeding 135 degrees (e.g., two 90-degree bends or a 45-degree plus 90-degree bend).

Maximum Interval on Straight Runs: On long horizontal runs of building drains or sewers, cleanouts must be spaced at intervals not exceeding 100 feet (30.4 meters) .

Base of Vertical Stacks: At the base of every vertical soil or waste stack where it transitions into the horizontal building drain.

Sizing of Cleanouts (UPC Table 707.1)

Cleanout size is a table lookup, not a formula . UPC Table 707.1 pairs each nominal drain size with a required cleanout size. The pattern to carry into the exam room is:

For small drains the cleanout matches the pipe size .

Above a threshold the table caps the cleanout size, because a rodding machine cable does not need a full-diameter opening — a single cleanout size serves a range of larger drains, and very large sewers are served by manholes instead.

Open the code book and read the exact row. Tab Table 707.1 during your first pass through Chapter 7; a "what size cleanout for an X-inch drain" question is worth more time in the index than in your memory, and the numbers are among the most commonly mis-remembered in the whole code.

Two related rules that are not in the table but are frequently paired with it:

A removable P-trap with slip or ground-joint connections can serve as the cleanout for the drain it protects, which is why a lavatory branch under 5 feet long does not need a separate cleanout.

Where a cleanout is removed from a drainage-pattern fitting in order to extend the drain, another cleanout of equal access and capacity must be provided in the same location .

Clearance and Working Space Requirements (UPC Section 707.9)

A cleanout is useless if a plumber cannot physically insert a drain cleaning machine cable into the opening. The UPC mandates strict clear working space in front of all cleanout plugs: MINIMUM FRONT CLEARANCE REQUIREMENTS

  • Cleanout Plug (smaller than 3") Cleanout Plug (3" or Larger)
  • ┌──────────┐ ┌──────────┐
  • │ O │ │ O │
  • └────┬─────┘ └────┬─────┘
  • │ │
  • │ ◄─────── 12 Inches ───────► │ ◄─────── 18 Inches ───────►
  • ▼ Clear Working Space ▼ Clear Working Space

Piping smaller than 3 inches: at least 12 inches (305 mm) of clearance in front of the cleanout for rodding.

Piping 3 inches and larger: at least 18 inches (457 mm) of clearance in front of the cleanout for rodding.

The IPC numbers — 18 inches for 6-inch and smaller and 36 inches for 8-inch and larger — are a different scheme. On an Iowa exam, answer 12 and 18 .

Under-Floor / Crawlspace Installation: Cleanouts installed under floors must extend flush with or above the finished floor, OR extend outside the exterior wall. If kept in a crawlspace, the crawlspace height must be at least 18 inches , and the cleanout must be located within 20 feet of the crawlspace access hatch.

  • Installation Standards, Access Panels & Plugs
  • Direction of Flow Alignment

Each cleanout must be installed so that it opens in the direction of flow of the soil or waste pipe or at right angles to it. Cleanout tees installed backwards (opening against flow) make snake insertion nearly impossible.

Plug Types and Traffic Areas

Material: Plugs must be heavy-gauge brass or approved plastic (PVC/ABS) matching the piping system.

Raised Head vs. Countersunk: Plugs in wall access covers, floor plates, driveways, walkways, or carpeted areas must have countersunk heads so the plug sits flush with the finished surface, eliminating tripping hazards and damage from foot or vehicle traffic.

Never buried: Cleanout plugs may not be covered with cement, plaster, or any other permanent finishing material. Where a plug must be concealed, provide a covering plate or access door that permits access to the plug. RAISED SQUARE HEAD (Basements / Exposed Pipe) COUNTERSUNK HEAD (Floors / Traffic / Flush Panels)

  • ┌──────┐ ┌──────────┐
  • │ │ │ ┌────┐ │
  • ┌────┴──────┴────┐ ┌────┴──┴────┴──┴────┐
  • │ THREADED │ │ THREADED │
  • │ PLUG BODY │ │ PLUG BODY │
  • └────────────────┘ └────────────────────┘
  • Concealed Access Doors

Cleanouts hidden behind finished drywall, plaster, or tile walls must be brought flush with the wall face or equipped with an access cover plate at least 12 x 12 inches in size.