1 Chapter 1: Exam Overview, Administration & Plan Review Workflow

1.1 ICC P3 Exam Overview: Format, References & Content Weights 1.2 Scope, Intent, and Administrative Authority 1.3 Construction Documents & Submittal Requirements 1.4 Inspections, Testing Protocols & Department Operations

2 Chapter 2: General Regulations, Materials & Pipe Protection

2.1 Piping Protection, Trenching & Bedding 2.2 Approved Piping Materials, Joints & Connections 2.3 Piping Hangers, Supports & Thermal Expansion

3 Chapter 3: Plumbing Fixtures, Occupant Load & Minimum Fixture Counts

3.1 Occupant Load Calculation & IPC Table 403.1 3.2 Separate Facilities, Urinal Substitution & Exceptions 3.3 Public Toilet Facilities & Customer Access Requirements 3.4 Multi-User, Single-User & Family/Assisted-Use Facilities

4 Chapter 4: Accessible Plumbing Facilities & Fixture Standards

4.1 ICC A117.1 Clearances & Accessible Fixture Dimensions 4.2 Accessible Showers, Bathtubs & Drinking Fountains 4.3 Fixture Construction, Flow Rates & Water Conservation

5 Chapter 5: Water Heaters, Fuel Gas Piping & Venting

5.1 Water Heater Design, Location & Clearances 5.2 Temperature & Pressure Relief Valves & Discharge Piping 5.3 Safety Controls, Drain Pans & Thermal Expansion 5.4 Fuel Gas Pipe Sizing: Demand, Tables & Length Methods (IFGC 402) 5.5 Gas Water Heater Venting & Combustion Air Calculations (IFGC 304 & 503) 5.6 Gas Piping Materials, Installation, Testing & Appliance Connections (IFGC 403–411, 624)

6 Chapter 6: Water Supply, Backflow Protection & Nonpotable Systems

6.1 Water Supply Fixture Units (WSFU) & Demand Estimation 6.2 Water Service & Distribution Pipe Sizing Calculations 6.3 Maximum Velocities, Water Hammer & Pressure Regulators 6.4 Backflow Prevention & Cross-Connection Control 6.5 Nonpotable Water Systems: Identification, Separation & Storage Tanks 6.6 Graywater Reuse, Rainwater Collection, Reclaimed Water & Subsurface Graywater

7 Chapter 7: Sanitary Drainage System Design & Sizing

7.1 Drainage Principles, Minimum Slope & Flow Velocities 7.2 Drainage Fixture Units (DFU) & System Load Assignment 7.3 Horizontal Branch & Building Drain/Sewer Sizing 7.4 Soil & Waste Stacks, Offsets & Multi-Story Systems

8 Chapter 8: Sanitary Cleanouts, Sumps & Sewage Ejectors

8.1 Cleanout Sizing, Spacing & Installation Requirements 8.2 Backwater Valves & Flood Protection 8.3 Sewage Ejectors, Sumps & Macerating Systems

9 Chapter 9: Venting Systems & Vent Sizing

9.1 Venting Fundamentals, Terminations & Flood Rim Rules 9.2 Fixture Vents, Individual & Common Vents, Trap-to-Vent Distances 9.3 Wet Venting, Circuit Venting & Combination Waste-Vent Systems 9.4 Vent Stacks, Stack Vents & Air Admittance Valves

10 Chapter 10: Traps, Interceptors & Special Waste Systems

10.1 Fixture Traps, Trap Seals & Design Requirements 10.2 Grease Interceptors: Sizing, Types & Plan Review 10.3 Oil Separators, Sand Interceptors & Indirect / Chemical Waste

11 Chapter 11: Storm Drainage Systems & Roof Drainage Design

11.1 Storm Drainage Hydraulics & 100-Year Rainfall Rates 11.2 Sizing Vertical Conductors, Leaders & Horizontal Storm Drains 11.3 Secondary (Emergency) Roof Drainage & Subsoil Systems

12 Chapter 12: Health Care Plumbing Systems

12.1 Health Care Plumbing Scope, Fixtures & Special Equipment 12.2 Health Care Water Supply Protection, Water Services & Medical Gas

11.1 Storm Drainage Hydraulics & 100-Year Rainfall Rates

Key Takeaways Explain This Topic AI

IPC 1101.3 prohibits draining storm water into sewers intended for sewage only, and 1104.1 bars using conductors as soil, waste or vent pipes.

Leaders and storm drains connected to a combined sewer must be trapped under IPC 1103.1; those connected to a storm sewer need not be.

IPC 1106.1 sizes storm drainage on the 100-year hourly rainfall rate from Figures 1106.1(1) through (5) or approved local weather data.

IPC 1106.4 adds one-half of the area of any vertical wall that diverts rainwater to the roof to the projected roof area.

IPC Equation 11-1 converts roof rainfall to flow as Q = 0.0104 × A × R, in gallons per minute.

Last updated: October 2026

Storm Drainage Hydraulics & 100-Year Rainfall Rates

Storm drainage systems safeguard structural integrity, life safety, and public health by collecting and conveying precipitation runoff away from roofs, exterior walls, foundations, courtyards, and paved areas. Under IPC Chapter 11, plumbing plans examiners must verify that storm drainage networks possess adequate hydraulic capacity to prevent catastrophic structural overload and interior flooding during severe meteorological events. Understanding rainfall frequency statistics, horizontal area projections, windward wall factors, and flow conversions is fundamental to evaluating commercial plumbing plans.

Scope, General Requirements & Drainage Segregation (IPC Section 1101)

IPC Chapter 11 regulates all piping, fixtures, drains, gutters, conductors, and appurtenances designed to convey rainwater, surface runoff, groundwater, and subsurface drainage. The code enforces rigid administrative and mechanical separation between sanitary and storm drainage systems.

Disposal and Segregation (IPC 1101.2, 1101.3, 1104 and 1109)

Approved place of disposal (1101.2): Rainwater from roofs and storm water from paved areas, yards, courts and courtyards drain to an approved place of disposal. For one- and two-family dwellings, and where approved, storm water may discharge onto flat areas such as streets or lawns if it flows away from the building.

No storm water in sanitary-only sewers (1101.3): Storm water shall not be drained into sewers intended for sewage only.

No shared piping (1104.1): Conductor pipes may not be used as soil, waste or vent pipes, and soil, waste or vent pipes may not be used as conductors.

No floor drains on storm drains (1104.2): Floor drains shall not be connected to a storm drain.

Combined public sewers (1109.1): Where the public sewer is combined, the building storm sewer connects to it independently of the sanitary sewer.

Introducing high-volume stormwater into a municipal sanitary sewer overwhelms wastewater treatment facilities, leading to biological upset and massive raw sewage backups into residential basements and commercial facilities. Conversely, directing sanitary waste into a storm sewer causes direct environmental contamination of public waterways. ┌────────────────────────────────────────────────────────────────────────┐

  • │ MANDATORY PIPING SEGREGATION (IPC 1101.3 / 1104) │
  • ├────────────────────────────────────┬───────────────────────────────────┤
  • │ STORM DRAINAGE SYSTEM │ SANITARY DRAINAGE SYSTEM │
  • ├────────────────────────────────────┼───────────────────────────────────┤
  • │ • Roof Drains & Area Drains │ • Water Closets & Urinals │
  • │ • Exterior Gutters & Leaders │ • Lavatories, Sinks & Showers │
  • │ • Vertical Interior Conductors │ • Commercial Kitchen Waste │
  • │ • Subsoil Foundation Drains │ • Clinical & Industrial Fixtures │
  • │ • Secondary Overflow Systems │ • Mechanical Waste / Trapped Hubs │
  • ├────────────────────────────────────┼───────────────────────────────────┤
  • │ DISCHARGE: Dedicated Storm Sewer, │ DISCHARGE: Dedicated Sanitary │
  • │ Detention Basin, or Approved Point │ Sewer Main or Private Sewage │
  • │ of Disposal (NEVER SANITARY SEWER) │ Disposal System (NEVER STORM) │
  • └────────────────────────────────────┴───────────────────────────────────┘
  • Traps on Storm Drains (IPC Section 1103)

Leaders and storm drains connected to a building storm sewer are not required to be trapped (1103.1). Leaders and storm drains connected to a combined sewer shall be trapped , either with an individual trap on the storm branch serving each conductor or with a single trap in the main storm drain just before it connects to the combined building sewer or public sewer. That keeps sewer gas from rising through the conductors to roof drains near openings. Storm traps are the same material as the piping (1103.2), individual conductor traps are the same size as the horizontal drain (1103.3), and a cleanout is installed on the building side of the trap (1103.4).

Other general rules: storm drains may not be reduced in size in the direction of flow (1101.5), changes in direction use Table 706.3 fittings (1101.6), cleanouts follow the sanitary rules except for subsurface drains (1101.8), backwater valves follow Section 714 (1101.9), and conductors and building storm drains are tested under Section 312 (1101.4).

Establishing Design Storm Intensity: The 100-Year, 1-Hour Rainfall Event

Roof drainage is sized for extreme storms, not average showers. Under IPC 1106.1 , vertical conductors and leaders, building storm drains, building storm sewers and their horizontal branches are sized on the 100-year hourly rainfall rate from Figures 1106.1(1) through 1106.1(5) , or on other rates determined from approved local weather data . Secondary systems are sized for the same rate as the primary system (1108.3).

Return Period and Statistical Meaning

The term "100-year storm" (100-year mean recurrence interval) does not mean a storm that occurs only once every century. Statistically, it represents a precipitation event having a 1 percent annual exceedance probability (AEP) in any given calendar year. The 1-hour duration represents the maximum depth of rain (measured in inches per hour, in/hr) that falls continuously over a 60-minute window during that 1 percent storm event.

Approved Rainfall Data Sources

IPC Figures 1106.1(1) through 1106.1(5): National Weather Service maps of 100-year, 1-hour rainfall for the eastern, central and western United States, Alaska and Hawaii.

Approved local weather data: Many jurisdictions accept or require NOAA Atlas 14 point estimates, or adopt their own design rate.

IPC Appendix B (where adopted): Rates of rainfall for various cities.

The plans examiner checks that the rate on the drawings comes from one of these sources for the actual project location, and not from a generic default.

Calculating Projected Roof Area & Vertical Wall Exposure (IPC Section 1105)

Roof drainage sizing begins with the horizontal projected roof area. In physics and fluid mechanics, rainfall falls vertically in still air; therefore, the pitch or slope of a standard flat or sloped roof does not increase the plan footprint collecting vertical precipitation. A 100 ft × 50 ft 100\text{ ft} \times 50\text{ ft} 100 ft × 50 ft gable roof sloped at 4:12 collects the exact same vertical volume of water as a 100 ft × 50 ft 100\text{ ft} \times 50\text{ ft} 100 ft × 50 ft flat roof—namely, 5 , 000 sq ft 5,000\text{ sq ft} 5 , 000 sq ft of projected horizontal area.

Wind-Driven Rain and Vertical Walls (IPC 1106.4)

During severe storms, wind drives rain against facades that rise above the roof, such as penthouses, stair towers, clerestories and adjoining buildings, and the water runs down onto the roof. IPC 1106.4 handles this with a single rule:

In sizing roof drains and storm drainage piping, one-half of the area of any vertical wall that diverts rainwater to the roof shall be added to the projected roof area for calculating the size of vertical conductors, leaders and horizontal storm drainage piping. WIND DIRECTION

  • ══════════════> Vertical Facade (Area = H x W)
  • │
  • ▼
  • ┌───────┐
  • │ │ Sheets down wall onto roof
  • │ │ ────────┐
  • │ │ │
  • ────────────────┘ └─────────▼─────────────────────
  • Upper Roof Lower Roof Deck
  • (Drains independently) [Horizontal Area + Wall Factor]

Applying IPC 1106.4:

  • Situation Added Area Under IPC 1106.4
  • One wall diverting rain onto the roof One-half of that wall's area

Two or more walls diverting rain onto the roof (corners, alcoves, courtyards) One-half of the area of each wall that diverts rain onto the roof

Wall whose runoff does not reach this roof (for example, it drains to its own gutter or to another roof) Nothing for this roof

Older design methods and other codes reduce the allowance for two adjacent walls (for example, 35 percent) or for walls enclosing a courtyard. The 2024 IPC does not; it adds one-half of every wall that diverts rainwater to the roof. Use the IPC rule on the P3 exam unless the question cites a local amendment.

Hydraulic Flow Rate Conversion: Roof Area to Peak GPM

Plans examiners frequently need to convert roof drainage loads between square feet of roof area and hydraulic flow rate in gallons per minute (GPM). This conversion is critical when sizing sump pumps, lift stations, oil/water separators, rainwater harvesting cisterns, and detention storage chambers.

Mathematical Derivation of the Hydraulic Constant

Consider 1 inch of rain falling uniformly over 1 square foot of roof surface in 1 hour:

Volume of Rain: Depth is 1 inch = 1 / 12 foot 1\text{ inch} = 1/12\text{ foot} 1 inch = 1/12 foot . Over an area of 1 sq ft 1\text{ sq ft} 1 sq ft , the volume is: V = 1 sq ft × 1 12 ft = 1 12 ft 3 = 0.08333 ft 3 V = 1\text{ sq ft} \times \frac{1}{12}\text{ ft} = \frac{1}{12}\text{ ft}^3 = 0.08333\text{ ft}^3 V = 1 sq ft × 12 1 ​ ft = 12 1 ​ ft 3 = 0.08333 ft 3

Conversion to Gallons: One cubic foot of water contains exactly 7.48052 gallons 7.48052\text{ gallons} 7.48052 gallons . Therefore, the hourly volume in gallons is: V gal/hr = 1 12 ft 3 × 7.48052 gal/ft 3 = 0.623377 gallons per hour V_{\text{gal/hr}} = \frac{1}{12}\text{ ft}^3 \times 7.48052\text{ gal/ft}^3 = 0.623377\text{ gallons per hour} V gal/hr ​ = 12 1 ​ ft 3 × 7.48052 gal/ft 3 = 0.623377 gallons per hour

Conversion to Gallons Per Minute (GPM): Dividing the hourly flow rate by 60 minutes: Q gpm = 0.623377 gal/hr 60 min = 0.0103896 GPM Q_{\text{gpm}} = \frac{0.623377\text{ gal/hr}}{60\text{ min}} = 0.0103896\text{ GPM} Q gpm ​ = 60 min 0.623377 gal/hr ​ = 0.0103896 GPM

The Imperial Reciprocal: Taking the reciprocal of 0.0103896 0.0103896 0.0103896 yields: 1 0.0103896 = 96.25 \frac{1}{0.0103896} = 96.25 0.0103896 1 ​ = 96.25

IPC 1106.2.1 (Equation 11-1) converts the rainfall rate on a roof surface to a flow rate in gallons per minute using this relationship:

Q gpm = 0.0104 × A × I or Q gpm = A × I 96.25 Q_{\text{gpm}} = 0.0104 \times A \times I \quad \text{or} \quad Q_{\text{gpm}} = \frac{A \times I}{96.25} Q gpm ​ = 0.0104 × A × I or Q gpm ​ = 96.25 A × I ​

Where:

  • Q gpm Q_{\text{gpm}} Q gpm ​ = Peak storm drainage flow rate in gallons per minute
  • A A A = Total equivalent projected roof area in square feet (including vertical wall additions)
  • I I I = Local 100-year, 1-hour rainfall intensity in inches per hour
  • 0.0104 0.0104 0.0104 = Hydraulic flow conversion factor ( 1 / 96.25 1 / 96.25 1/96.25 )
  • Worked Design Example: Multi-Tier Roof with Clerestory Walls

A plans examiner is reviewing the storm drainage submittal for a 3-story suburban medical office building located in an area with a 100-year, 1-hour design rainfall rate of I = 3.5 in/hr I = 3.5\text{ in/hr} I = 3.5 in/hr . ┌────────────────────────┐

  • │ Penthouse Roof (Tier 1)│
  • │ 40 ft x 50 ft │
  • └───────────┬────────────┘
  • │ [Penthouse Wall: 50 ft wide x 16 ft high]
  • ┌───────────────────────────────────────────┴────────────────────────┐
  • │ Main Building Roof (Tier 2): 100 ft x 140 ft │
  • │ Drained by four interior primary roof drains │
  • └────────────────────────────────────────────────────────────────────┘
  • Step 1: Analyze Tier 1 (Penthouse Roof)
  • Dimensions: 40 ft × 50 ft 40\text{ ft} \times 50\text{ ft} 40 ft × 50 ft

Projected Horizontal Area: A tier1 = 40 × 50 = 2 , 000 sq ft A_{\text{tier1}} = 40 \times 50 = 2,000\text{ sq ft} A tier1 ​ = 40 × 50 = 2 , 000 sq ft

Vertical Wall Additions: None (roof is at the top of the structure with no projecting walls above it).

Peak Flow for Tier 1: Q tier1 = 0.0104 × 2 , 000 sq ft × 3.5 in/hr = 72.8 GPM Q_{\text{tier1}} = 0.0104 \times 2,000\text{ sq ft} \times 3.5\text{ in/hr} = 72.8\text{ GPM} Q tier1 ​ = 0.0104 × 2 , 000 sq ft × 3.5 in/hr = 72.8 GPM

Step 2: Analyze Tier 2 (Main Lower Roof)

Dimensions: 100 ft × 140 ft = 14 , 000 sq ft 100\text{ ft} \times 140\text{ ft} = 14,000\text{ sq ft} 100 ft × 140 ft = 14 , 000 sq ft

Net Horizontal Roof Area (excluding penthouse footprint): 14 , 000 − 2 , 000 = 12 , 000 sq ft 14,000 - 2,000 = 12,000\text{ sq ft} 14 , 000 − 2 , 000 = 12 , 000 sq ft

Projecting Vertical Wall: The south facade of the penthouse rises 16 ft 16\text{ ft} 16 ft above the Tier 2 roof deck across a width of 50 ft 50\text{ ft} 50 ft .

Vertical Wall Area: A wall = 50 ft × 16 ft = 800 sq ft A_{\text{wall}} = 50\text{ ft} \times 16\text{ ft} = 800\text{ sq ft} A wall ​ = 50 ft × 16 ft = 800 sq ft

Vertical Wall Addition (IPC 1106.4): One-half of the area of the wall that diverts rain onto the roof: A wall-equiv = 0.50 × 800 sq ft = 400 sq ft A_{\text{wall-equiv}} = 0.50 \times 800\text{ sq ft} = 400\text{ sq ft} A wall-equiv ​ = 0.50 × 800 sq ft = 400 sq ft

Total Equivalent Design Area for Tier 2: A tier2-total = 12 , 000 sq ft (net deck) + 400 sq ft (wall factor) = 12 , 400 sq ft A_{\text{tier2-total}} = 12,000\text{ sq ft (net deck)} + 400\text{ sq ft (wall factor)} = 12,400\text{ sq ft} A tier2-total ​ = 12 , 000 sq ft (net deck) + 400 sq ft (wall factor) = 12 , 400 sq ft

Step 3: Determine Cumulative Building Load

If the penthouse roof drainage is piped independently down through dedicated vertical conductors directly to the building storm drain, Tier 2 is sized for 12 , 400 sq ft 12,400\text{ sq ft} 12 , 400 sq ft . However, if the penthouse roof conductors discharge onto the Tier 2 roof deck via scuppers or splash blocks, the total drainage load on Tier 2 becomes: A combined = 12 , 400 sq ft + 2 , 000 sq ft (Tier 1) = 14 , 400 sq ft A_{\text{combined}} = 12,400\text{ sq ft} + 2,000\text{ sq ft (Tier 1)} = 14,400\text{ sq ft} A combined ​ = 12 , 400 sq ft + 2 , 000 sq ft (Tier 1) = 14 , 400 sq ft

Peak flow rate for the combined Tier 2 deck: Q total = 0.0104 × 14 , 400 sq ft × 3.5 in/hr = 524.16 GPM Q_{\text{total}} = 0.0104 \times 14,400\text{ sq ft} \times 3.5\text{ in/hr} = 524.16\text{ GPM} Q total ​ = 0.0104 × 14 , 400 sq ft × 3.5 in/hr = 524.16 GPM Each of the four primary roof drains must be sized for at least 14 , 400 / 4 = 3 , 600 sq ft 14,400 / 4 = 3,600\text{ sq ft} 14 , 400/4 = 3 , 600 sq ft of equivalent area ( 131.04 GPM 131.04\text{ GPM} 131.04 GPM ). Sizing conductors for only the raw horizontal deck area ( 12 , 000 sq ft 12,000\text{ sq ft} 12 , 000 sq ft ) would result in severe under-sizing and parapet overflow.

Plan Reviewer Verification Checklist: Storm Drainage Hydraulics

When evaluating storm drainage calculations and drawing sheets, the plumbing plans examiner must verify the following items:

Segregation Verified: Storm water is not drained into sanitary-only sewers (1101.3), conductors are not used as soil, waste or vent pipes (1104.1), and no floor drains connect to storm drains (1104.2).

Approved Rainfall Rate: The 100-year hourly rate comes from Figures 1106.1(1) through (5) or approved local weather data (1106.1).

Horizontal Plan Dimensions: Projected roof areas match architectural dimensions and exclude pitch multipliers.

Vertical Wall Additions: One-half of the area of every wall that diverts rain onto the roof is added (IPC 1106.4).

Combined Sewer Traps: Leaders and storm drains connected to a combined sewer are trapped, with a cleanout on the building side (IPC 1103).

Multi-Tier Discharge: Splash-block or scupper discharges from higher roof levels onto lower roof decks are properly summed into the lower roof drain tributary calculations.

Flow Conversions: Sump pumps, lift stations, and detention inlet pipes match the calculated peak GPM ( Q gpm = 0.0104 × A × I Q_{\text{gpm}} = 0.0104 \times A \times I Q gpm ​ = 0.0104 × A × I ).