Study guide

6.4 Commercial & Industrial Feeder/Service Calculations

Idaho Journeyman Electrician Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Exam Orientation, NEC Navigation & Idaho Regulations

1.1 Idaho Journeyman Exam Format, PSI Logistics & Rapid NEC Navigation 1.2 Idaho Electrical Licensing Laws (Title 54, Ch. 10) & IDAPA 24.39.10 Requirements 1.3 Idaho Permits, Inspection Procedures & State-Specific NEC Amendments 1.4 NEC Article 90 Scope, Code Arrangement & Article 110 General Requirements

2 Chapter 2: Electrical Theory & Essential Math Calculations

2.1 Ohm's Law, Joule's Law & DC Circuit Calculations 2.2 Single-Phase & Three-Phase AC Fundamentals and Power Factor 2.3 DC & AC Voltage Drop Calculations and Conductor Sizing 2.4 NEC Article 100 Essential Definitions for Journeymen

3 Chapter 3: Conductors, Raceways & Box Sizing Calculations

3.1 Conductor Ampacity, Insulation Types & Terminal Temperature Ratings 3.2 Ambient Temperature Correction & Raceway Conductor Bundling Derating 3.3 Outlet & Junction Box Volume Fill Calculations (NEC 314.16) 3.4 Conduit Fill Calculations & Large Pull Box Sizing (NEC 314.28)

4 Chapter 4: Branch Circuits & Overcurrent Protection

4.1 Branch Circuit Ratings, Multiwire Circuits & Receptacle Placement 4.2 GFCI & AFCI Protection Mandates and Idaho Code Clarifications 4.3 Overcurrent Protective Devices, Standard Ratings & Small Conductor Rules 4.4 Feeder & Transformer Tap Rules (NEC 240.21)

5 Chapter 5: Feeders, Services & Outside Branch Circuits

5.1 Feeder Conductor Sizing, Neutral Calculations & Voltage Drop 5.2 Outside Branch Circuits, Feeders & Overhead/Underground Clearances 5.3 Service Drop, Service Lateral & Service-Entrance Sizing 5.4 Service Disconnecting Means, Emergency Disconnects & Surge Protection

6 Chapter 6: Load Calculations: Dwellings & Commercial

6.1 General Lighting, Small Appliance & Laundry Load Calculations 6.2 Standard Method Single-Family Dwelling Service Calculations (NEC 220 Part III) 6.3 Optional Method Single-Family & Multifamily Calculations (NEC 220 Part IV) 6.4 Commercial & Industrial Feeder/Service Calculations

7 Chapter 7: Grounding and Bonding: Systems & Electrodes

7.1 Grounding vs. Bonding Fundamentals & System Grounding 7.2 Grounding Electrodes & Grounding Electrode Conductor (GEC) Sizing 7.3 Main Bonding Jumpers, System Bonding Jumpers & Supply-Side Bonding

8 Chapter 8: Grounding and Bonding: Equipment & Enclosures

8.1 Equipment Grounding Conductors (EGC) Types, Installation & Sizing (Table 250.122) 8.2 Separately Derived Systems (SDS) Transformers & Generator Grounding 8.3 Service Enclosure Bonding, Concentric Knockouts & Effective Ground-Fault Path

9 Chapter 9: Wiring Methods, Cables & Conduits

9.1 General Requirements for Wiring Methods & Underground Installations (Article 300) 9.2 Nonmetallic-Sheathed (NM), Metal-Clad (MC) & Armored (AC) Cables 9.3 Metallic & Nonmetallic Raceway Systems (EMT, PVC, RMC, FMC) 9.4 Cabinets, Cutout Boxes & Outlet Box Installation Rules (Articles 312 & 314)

10 Chapter 10: Equipment for General Use: Devices, Luminaires & Appliances

10.1 Switches, Receptacles & Device Installation Standards (Articles 404 & 406) 10.2 Luminaire Clearances, Closet Rules & Lighting Track (Article 410) 10.3 Household Appliances & Fixed Electric Space Heating (Articles 422 & 424) 10.4 Generators, Transformer Overcurrent Protection & Panelboards

11 Chapter 11: Motors, Motor Circuits & Controllers

11.1 Motor Nameplate vs. Table FLC & Branch Circuit Conductor Sizing 11.2 Branch Circuit Short-Circuit & Ground-Fault Protection (Table 430.52) 11.3 Motor Overload Protection Sizing & Selection (NEC 430 Part III) 11.4 Motor Disconnects, Controllers & Multimotor Feeder Calculations

12 Chapter 12: Special Occupancies & Hazardous Locations

12.1 Hazardous (Classified) Locations: Classes, Divisions, Zones & Seals 12.2 Commercial Garages, Repair Hangars & Fuel Dispensing Facilities 12.3 Health Care Facilities: Patient Care Spaces & Redundant Grounding (Article 517) 12.4 Agricultural Buildings, Marinas, Boatyards & RV Parks

13 Chapter 13: Special Equipment, Emergency Systems & Renewable Energy

13.1 Swimming Pools, Spas, Hot Tubs & Equipotential Bonding (Article 680) 13.2 Electric Vehicle Supply Equipment (EVSE) Installation & Sizing (Article 625) 13.3 Solar Photovoltaic (PV) Systems & Energy Storage Systems (Articles 690 & 706) 13.4 Emergency, Standby Power Systems & Fire Pumps (Articles 700, 701, 702 & 695) 13.5 Fire Alarm, Optical Fiber & Power-Limited Circuits (Articles 760, 770 & 800)

6.4 Commercial & Industrial Feeder/Service Calculations

Key Takeaways Explain This Topic AI

The 2023 NEC Table 220.42(A) general-lighting unit loads already include the continuous-load allowance; do not multiply those table values by 125% again.

Show-window feeder/service lighting uses at least 200 VA per linear foot under NEC 220.46(A); apply the appropriate continuous-load sizing rule when the load is continuous.

Each commercial occupancy accessible to pedestrians requires at least one 20A sign/outline lighting branch circuit calculated at a minimum of 1,200 VA under NEC 220.14(F) and 600.5 (sized at 1,500 VA continuous).

Commercial receptacle loads are computed under NEC 220.14(I) at 180 VA per yoke/strap and derated under Table 220.47 at 100% for the first 10 kVA and 50% for all remaining kVA.

Commercial kitchen electric cooking equipment is subject to Table 220.56 demand factors (1-2 units = 100%, 3 units = 90%, 4 units = 80%, 5 units = 70%, 6+ units = 65%), but the total demand can never be less than the sum of the two largest units.

Last updated: September 2026

6.4 Commercial & Industrial Feeder/Service Calculations

Unlike residential installations, commercial and industrial occupancies feature substantial continuous lighting, specialized display window loads, dedicated exterior signage, high-density receptacle layouts, three-phase commercial kitchen cooking appliances, and heavy motor equipment.

Designing commercial services requires applying the specific rules in NEC Article 220 Parts II and III alongside three-phase power mathematics.

For this section, use the 2023 NEC . Keep the general-lighting table allowance, other continuous loads, demand factors, and motor allowances distinct; applying a percentage twice overstates the load.

1. Commercial Lighting Loads (2023 NEC Table 220.42(A))

Multiply floor area by the applicable minimum unit load. These table values already include the continuous-load allowance.

  • Occupancy Minimum unit load (VA/sq ft)
  • Office / bank 1.3
  • Retail 1.9
  • Restaurant 1.5
  • Warehouse 1.2
  • Hospital 1.6
  • Hotel / motel 1.7
  • School / university 1.5

Do not apply another 125% multiplier to these tabulated minimum lighting loads. This does not remove the applicable continuous-load sizing requirements for separately calculated loads such as signs or show-window lighting.

  • 2. Show Window & Commercial Sign Loads
  • Show Window Lighting (NEC 220.14(G) & 220.46(A))

Show windows used for retail merchandise display must be calculated at not less than 200 VA per linear foot (660 VA/m), measured horizontally along the base of the window.

  • Connected Show Window VA = Linear Feet x 200 VA/ft
  • Continuous Design VA = Linear Feet x 200 VA/ft x 1.25
  • Sign and Outline Lighting (NEC 220.14(F) & 600.5)

Under NEC 600.5(A) , each commercial building and each commercial occupancy accessible to pedestrians must be provided with at least one outlet for sign or outline lighting on a dedicated 20A branch circuit. The branch circuit load must be calculated at a minimum of 1,200 VA (or actual rating of connected sign equipment). For the continuous sign load assumed here:

  • Sign Circuit Load = 1,200 VA x 1.25 = 1,500 VA
  • 3. Commercial Receptacle Loads & Demand Factors (NEC 220.14(I) & Table 220.47)

In non-dwelling occupancies, convenience receptacle outlets are calculated separately from lighting:

Individual Receptacles: Each single or multi-receptacle device mounted on a single yoke/strap is calculated at not less than 180 VA (NEC 220.14(I)).

Duplex Receptacle: Mounted on one yoke = 180 VA .

Triplex Receptacle: Mounted on one yoke = 180 VA .

Quadruplex (Two Duplexes on 2 yokes): Mounted on two yokes = 2 x 180 = 360 VA. +-----------------------------------------------------------------------------+

  • | NEC TABLE 220.47 RECEPTACLE FEEDER DEMAND FACTORS |
  • | |
  • | TOTAL CONNECTED RECEPTACLE LOAD = Total Yokes x 180 VA |
  • | |
  • | PORTION OF RECEPTACLE LOAD | DEMAND FACTOR | CALCULATION METHOD |
  • | ----------------------------------+---------------+------------------- |
  • | First 10 kVA (10,000 VA) or less | 100% | First 10,000 VA x 1.00|
  • | Remainder over 10 kVA (10,000 VA) | 50% | (Load - 10,000) x 0.50|
  • +-----------------------------------------------------------------------------+

Example: An office building contains 150 duplex receptacles on single yokes. Calculate the receptacle-count component first:

Total Connected Load = 150 x 180 VA = 27,000 VA = 27 kVA.

First 10,000 VA x 1.00 = 10,000 VA.

Remaining 17,000 VA x 0.50 = 8,500 VA.

Net Feeder Receptacle Demand Load = 10,000 + 8,500 = 18,500 VA . For an office, NEC 220.43 also requires comparison with 1 VA/sq ft; use the larger result. Floor area is therefore needed before this component can be accepted as the final office receptacle load.

4. Commercial Kitchen Cooking Equipment (NEC Table 220.56)

In commercial kitchens (restaurants, cafeterias, hotels, institutional dining), electric cooking equipment—including fryers, griddles, ovens, steamers, microwave ovens, booster heaters, and commercial dishwashers—is subject to the demand factors in NEC Table 220.56 . +-----------------------------------------------------------------------------+

  • | NEC TABLE 220.56 COMMERCIAL KITCHEN EQUIPMENT DEMAND |
  • | |
  • | NUMBER OF COMMERCIAL UNITS | DEMAND FACTOR (PERCENT OF NAMEPLATE) |
  • | ----------------------------------+------------------------------------- |
  • | 1 to 2 Units | 100% |
  • | 3 Units | 90% |
  • | 4 Units | 80% |
  • | 5 Units | 70% |
  • | 6 or More Units | 65% |
  • +-----------------------------------------------------------------------------+

Important

The Minimum Floor Rule for Kitchen Demand: Under NEC 220.56, in no case shall the feeder demand load calculated under Table 220.56 be less than the sum of the nameplate ratings of the two largest kitchen equipment items .

5. Balanced Three-Phase Current

For a balanced three-phase apparent load, line current is: I = S 3 V L L I = \frac{S}{\sqrt{3}\,V_{LL}} I = 3 ​ V LL ​ S ​

Use volt-amperes for S and line-to-line volts for V. The divisor is approximately 360.27 at 208 V, or 831.38 at 480 V. Check individual phase loading when single-phase loads are unevenly distributed.

6. Restaurant Example: Known Loads and Missing Motor Data

Given loads:

Restaurant floor area: 3,600 sq ft.

Show window: 25 linear feet; one sign circuit; 60 duplex receptacles on individual yokes.

Six cooking appliances: fryer 12.0 kW, oven 8.5 kW, griddle 6.0 kW, dishwasher/booster 9.5 kW, steam table 4.0 kW, microwave 2.0 kW. Total: 42.0 kW.

At 208 V three-phase: rooftop AC unit 15.0 kVA, heating blower 3.0 kVA, cooler compressor 4.8 kVA, freezer compressor 3.6 kVA, exhaust/make-up-air fan 2.4 kVA.

Calculation assumptions: Lighting uses the 2023 table minimum; show-window and sign loads are continuous. Cooking nameplate kW equals kVA for this exercise. Cooling and heating do not operate together, the other listed motors can run with cooling, and the listed HVAC/motor loads do not yet include any extra largest-motor allowance. Treat the final service load as balanced when converting VA to current.

  • Component Calculation Load
  • General lighting 3,600 × 1.5; no second 125% factor 5,400 VA
  • Show window 25 × 200 × 1.25 6,250 VA
  • Sign 1,200 × 1.25 1,500 VA
  • Receptacles 10,000 + (60 × 180 − 10,000) × 0.50 10,400 VA
  • Cooking equipment 42,000 × 0.65 = 27,300; exceeds the two-largest sum of 21,500 27,300 VA
  • Subtotal before HVAC and motors 5,400 + 6,250 + 1,500 + 10,400 + 27,300 50,850 VA
  • HVAC/motors before extra allowance 15,000 + 4,800 + 3,600 + 2,400 25,800 VA
  • Known total before extra motor allowance 50,850 + 25,800 76,650 VA
  • Why the Largest Motor Is Not Yet Known

The 15.0 kVA rooftop unit is an equipment total . It may contain a compressor, fans, and other loads. The problem does not give their individual ratings, so it does not establish that the 4.8 kVA cooler compressor is the largest motor. Nor can the whole 15.0 kVA automatically be treated as a single motor.

NEC 220.50 directs motor calculations to Article 430 and hermetic air-conditioning compressor loads to Article 440. Obtain the applicable motor/compressor currents and equipment nameplate data, and check whether a supplied equipment load already includes a required allowance. Do not add the same allowance twice.

For a simplified case where the stated base loads are appropriate and exclude the extra allowance, let M be the VA corresponding to the largest applicable individual motor/compressor load. Then: S calculated = 76,650 + 0.25 M S_{\text{calculated}} = 76{,}650 + 0.25M S calculated ​ = 76 , 650 + 0.25 M I = 76,650 + 0.25 M 3 × 208 I = \frac{76{,}650 + 0.25M}{\sqrt{3}\times208} I = 3 ​ × 208 76 , 650 + 0.25 M ​

Conditional check: Only if the missing rooftop data confirms that M = 4,800 VA is the governing motor does the result become 77,850 VA and approximately 216.1 A. That condition is not established by the given unit total. Resolve it, phase loading, conductor conditions, and equipment requirements before selecting a final service, conductor, or OCPD rating.