1 Chapter 1: Exam Orientation, NEC Navigation & Idaho Regulations

1.1 Idaho Journeyman Exam Format, PSI Logistics & Rapid NEC Navigation 1.2 Idaho Electrical Licensing Laws (Title 54, Ch. 10) & IDAPA 24.39.10 Requirements 1.3 Idaho Permits, Inspection Procedures & State-Specific NEC Amendments 1.4 NEC Article 90 Scope, Code Arrangement & Article 110 General Requirements

2 Chapter 2: Electrical Theory & Essential Math Calculations

2.1 Ohm's Law, Joule's Law & DC Circuit Calculations 2.2 Single-Phase & Three-Phase AC Fundamentals and Power Factor 2.3 DC & AC Voltage Drop Calculations and Conductor Sizing 2.4 NEC Article 100 Essential Definitions for Journeymen

3 Chapter 3: Conductors, Raceways & Box Sizing Calculations

3.1 Conductor Ampacity, Insulation Types & Terminal Temperature Ratings 3.2 Ambient Temperature Correction & Raceway Conductor Bundling Derating 3.3 Outlet & Junction Box Volume Fill Calculations (NEC 314.16) 3.4 Conduit Fill Calculations & Large Pull Box Sizing (NEC 314.28)

4 Chapter 4: Branch Circuits & Overcurrent Protection

4.1 Branch Circuit Ratings, Multiwire Circuits & Receptacle Placement 4.2 GFCI & AFCI Protection Mandates and Idaho Code Clarifications 4.3 Overcurrent Protective Devices, Standard Ratings & Small Conductor Rules 4.4 Feeder & Transformer Tap Rules (NEC 240.21)

5 Chapter 5: Feeders, Services & Outside Branch Circuits

5.1 Feeder Conductor Sizing, Neutral Calculations & Voltage Drop 5.2 Outside Branch Circuits, Feeders & Overhead/Underground Clearances 5.3 Service Drop, Service Lateral & Service-Entrance Sizing 5.4 Service Disconnecting Means, Emergency Disconnects & Surge Protection

6 Chapter 6: Load Calculations: Dwellings & Commercial

6.1 General Lighting, Small Appliance & Laundry Load Calculations 6.2 Standard Method Single-Family Dwelling Service Calculations (NEC 220 Part III) 6.3 Optional Method Single-Family & Multifamily Calculations (NEC 220 Part IV) 6.4 Commercial & Industrial Feeder/Service Calculations

7 Chapter 7: Grounding and Bonding: Systems & Electrodes

7.1 Grounding vs. Bonding Fundamentals & System Grounding 7.2 Grounding Electrodes & Grounding Electrode Conductor (GEC) Sizing 7.3 Main Bonding Jumpers, System Bonding Jumpers & Supply-Side Bonding

8 Chapter 8: Grounding and Bonding: Equipment & Enclosures

8.1 Equipment Grounding Conductors (EGC) Types, Installation & Sizing (Table 250.122) 8.2 Separately Derived Systems (SDS) Transformers & Generator Grounding 8.3 Service Enclosure Bonding, Concentric Knockouts & Effective Ground-Fault Path

9 Chapter 9: Wiring Methods, Cables & Conduits

9.1 General Requirements for Wiring Methods & Underground Installations (Article 300) 9.2 Nonmetallic-Sheathed (NM), Metal-Clad (MC) & Armored (AC) Cables 9.3 Metallic & Nonmetallic Raceway Systems (EMT, PVC, RMC, FMC) 9.4 Cabinets, Cutout Boxes & Outlet Box Installation Rules (Articles 312 & 314)

10 Chapter 10: Equipment for General Use: Devices, Luminaires & Appliances

10.1 Switches, Receptacles & Device Installation Standards (Articles 404 & 406) 10.2 Luminaire Clearances, Closet Rules & Lighting Track (Article 410) 10.3 Household Appliances & Fixed Electric Space Heating (Articles 422 & 424) 10.4 Generators, Transformer Overcurrent Protection & Panelboards

11 Chapter 11: Motors, Motor Circuits & Controllers

11.1 Motor Nameplate vs. Table FLC & Branch Circuit Conductor Sizing 11.2 Branch Circuit Short-Circuit & Ground-Fault Protection (Table 430.52) 11.3 Motor Overload Protection Sizing & Selection (NEC 430 Part III) 11.4 Motor Disconnects, Controllers & Multimotor Feeder Calculations

12 Chapter 12: Special Occupancies & Hazardous Locations

12.1 Hazardous (Classified) Locations: Classes, Divisions, Zones & Seals 12.2 Commercial Garages, Repair Hangars & Fuel Dispensing Facilities 12.3 Health Care Facilities: Patient Care Spaces & Redundant Grounding (Article 517) 12.4 Agricultural Buildings, Marinas, Boatyards & RV Parks

13 Chapter 13: Special Equipment, Emergency Systems & Renewable Energy

13.1 Swimming Pools, Spas, Hot Tubs & Equipotential Bonding (Article 680) 13.2 Electric Vehicle Supply Equipment (EVSE) Installation & Sizing (Article 625) 13.3 Solar Photovoltaic (PV) Systems & Energy Storage Systems (Articles 690 & 706) 13.4 Emergency, Standby Power Systems & Fire Pumps (Articles 700, 701, 702 & 695) 13.5 Fire Alarm, Optical Fiber & Power-Limited Circuits (Articles 760, 770 & 800)

9.3 Metallic & Nonmetallic Raceway Systems (EMT, PVC, RMC, FMC)

Key Takeaways Explain This Topic AI

Electrical Metallic Tubing (EMT - Article 358) must be securely fastened within 3 feet of each box, cabinet, or fitting and supported at least every 10 feet, with a maximum of 360° of total bends between pull points (NEC 358.26).

Rigid Metal Conduit (RMC - Article 344) and Intermediate Metal Conduit (IMC - Article 342) provide maximum physical protection, with horizontal support intervals extending from 10 feet for 1/2–3/4 in. trade sizes up to 20 feet for 3 in. and larger per Table 344.30(B)(2).

Rigid Polyvinyl Chloride Conduit (PVC - Article 352) requires Schedule 80 in areas subject to physical damage, support every 3 to 8 feet per Table 352.30, expansion fittings per 352.44 where thermal movement exceeds 0.25 inches, and an internal wire-type EGC.

Flexible Metal Conduit (FMC) and Liquidtight Flexible Metal Conduit (LFMC) must be secured within 12 inches of boxes and supported every 4.5 feet, with exceptions allowing 3-foot unsupported lengths at terminals and 6-foot luminaire drops.

FMC and LFMC can only serve as the sole equipment grounding conductor under NEC 250.118 if the total ground path length does not exceed 6 feet and upstream overcurrent protection is 20A or 60A maximum.

Last updated: August 2026

9.3 Metallic & Nonmetallic Raceway Systems (EMT, PVC, RMC, FMC)

Conduit and raceway systems provide enclosed physical channels designed to route, protect, and ground electrical conductors. The National Electrical Code governs distinct metallic and nonmetallic raceway types, each engineered for specific structural environments, atmospheric hazards, and mechanical stresses.

On the Idaho Journeyman Electrician exam, raceway questions test support intervals , maximum degrees of bends between pull points , fittings for wet vs dry locations , PVC expansion calculations , and equipment grounding conductor (EGC) rules .

1. Electrical Metallic Tubing (EMT - Article 358)

Electrical Metallic Tubing (EMT) , often called thin-wall conduit , is an unthreaded steel or aluminum raceway of circular cross-section. +-----------------------------------------------------------------------------+

  • | EMT INSTALLATION RULES (ARTICLE 358) |
  • | |
  • | [SUPPORT RULES - NEC 358.30] |
  • | * Fastened within 3 FEET (900 mm) of every box, cabinet, or conduit body. |
  • | (Extended to 5 ft where structural members do not permit 3 ft). |
  • | * Supported at intervals not exceeding 10 FEET (3.0 m) along run. |
  • | |
  • | [BENDING RULES - NEC 358.26 (THE 360° RULE)] |
  • | * Total bends between pull points CANNOT EXCEED 360 DEGREES |
  • | (e.g., maximum of four 90° bends, or two 90° and four 45° bends). |
  • | |
  • | [FITTINGS - DRY VS WET LOCATIONS] |
  • | * Set-Screw Fittings ---> Permitted for DRY locations only. |
  • | * Compression Fittings -> Permitted for dry, damp, & wet (if "Raintight").|
  • +-----------------------------------------------------------------------------+
  • Uses Permitted & Prohibited (NEC 358.10, 358.12)

Permitted: Exposed and concealed in dry, damp, and wet locations (using listed raintight fittings); embedded in poured concrete; in direct contact with earth (if protected by approved corrosion protection).

Prohibited: Where subject to severe physical damage ; in hazardous (classified) locations except where specifically permitted by Chapter 5; for the support of luminaires or equipment (except conduit bodies no larger than the tubing size).

2. Rigid Metal Conduit (RMC - Article 344) & Intermediate Metal Conduit (IMC - Article 342)

Rigid Metal Conduit (RMC) and Intermediate Metal Conduit (IMC) are heavy-wall threaded ferrous or nonferrous metal raceways that provide the highest level of mechanical protection available. +-----------------------------------------------------------------------------+

  • | RMC & IMC MAXIMUM SUPPORT SPANS (TABLE 344.30(B)(2)) |
  • | |
  • | CONDUIT TRADE SIZE MAXIMUM DISTANCE BETWEEN SUPPORTS |
  • | ----------------------------------------------------------------------- |
  • | 1/2 in. to 3/4 in. ---------> 10 FEET (3.0 m) |
  • | 1 in. trade size ---------> 12 FEET (3.7 m) |
  • | 1-1/4 in. to 1-1/2 in. ---------> 14 FEET (4.3 m) |
  • | 2 in. to 2-1/2 in. ---------> 16 FEET (4.9 m) |
  • | 3 in. and larger ---------> 20 FEET (6.0 m) |
  • | |
  • | VERTICAL RISERS FROM INDUSTRIAL MACHINERY: Up to 20 ft between supports |
  • | if threaded couplings are used and fixed firmly top and bottom. |
  • +-----------------------------------------------------------------------------+
  • RMC & IMC Key Code Mandates

Threading & Reaming (NEC 344.28 / 342.28): All field-cut conduit ends must be reamed with a reamer or deburring tool to remove sharp burrs that could damage conductor insulation during pulling. Threads must have a standard 3/4-inch taper per foot (1-in-16 taper, NPT).

Support Near Enclosures (344.30(A)): RMC/IMC must be securely fastened within 3 feet (900 mm) of each box, cabinet, or fitting (extended to 5 ft for unbroken conduit lengths).

Corrosion Protection: When buried directly in earth or cinder concrete, RMC/IMC must have supplemental nonmetallic coatings (e.g., PVC-coated rigid conduit) unless soil resistivity testing indicates low corrosiveness.

3. Rigid Polyvinyl Chloride Conduit (PVC - Article 352)

Rigid PVC Conduit is a nonmetallic, corrosion-resistant raceway widely used for underground, wet, chemical, and slab installations. +-----------------------------------------------------------------------------+

  • | SCHEDULE 40 VS. SCHEDULE 80 PVC (NEC 352.10) |
  • | |
  • | [SCHEDULE 40 PVC] |
  • | * Standard wall thickness. |
  • | * Permitted underground, embedded in concrete, walls, floors, & ceilings. |
  • | * PROHIBITED where subject to physical damage! |
  • | |
  • | [SCHEDULE 80 PVC] |
  • | * Heavy wall thickness (smaller interior cross-sectional area). |
  • | * MANDATORY where subject to PHYSICAL DAMAGE (e.g., pole risers, exposed |
  • | commercial traffic areas, driveways). |
  • +-----------------------------------------------------------------------------+
  • Support Spacing for Rigid PVC (NEC Table 352.30)

PVC must be securely fastened within 3 feet (900 mm) of every box/cabinet and supported along runs per Table 352.30:

  • Conduit Trade Size Maximum Support Spacing (PVC)
  • 1/2 in. through 1 in. 3 feet (900 mm)
  • 1-1/4 in. through 2 in. 5 feet (1.5 m)
  • 2-1/2 in. through 3 in. 6 feet (1.8 m)
  • 3-1/2 in. through 5 in. 7 feet (2.1 m)
  • 6 in. trade size 8 feet (2.4 m)
  • Thermal Expansion & Expansion Fittings (NEC 352.44 & Table 352.44)

PVC expands and contracts significantly with temperature changes (approximately 5 times more than steel). NEC 352.44 mandates that expansion fittings must be installed whenever the anticipated temperature change will cause a length change of 0.25 inches (6 mm) or more in a straight conduit run.

ΔL = L(inches) x ΔT x 0.0000338 — or equivalently — ΔL = L(feet) x ΔT x 0.000406

Where:

ΔL = Change in length (inches)

L = Total length of straight conduit run (use INCHES with the 0.0000338 coefficient, or FEET with the 0.000406 coefficient)

ΔT = Expected temperature differential between extreme summer heat and winter cold (°F)

Warning

Watch the units. The NEC coefficient of thermal expansion for PVC is 3.38 x 10⁻⁵ in./in./°F — inches of growth per inch of conduit per degree. Plugging a run length expressed in feet straight into that coefficient understates the answer by a factor of 12. Table 352.44 sidesteps the problem by tabulating length change per 100 feet of conduit: a 100°F temperature change yields 4.06 inches per 100 ft .

Example Calculation: A 100-foot run of outdoor PVC in Boise, Idaho, experiences a temperature swing of 100°F (from 0°F winter to 100°F summer).

Convert to inches: 100 ft x 12 = 1,200 in. → ΔL = 1,200 x 100 x 0.0000338 = 4.06 inches .

Cross-check against Table 352.44: at a 100°F change the table lists 4.06 in. per 100 ft . Match.

Because 4.06 in. far exceeds the 0.25 in. threshold, an expansion fitting is mandatory — and note that a fitting offering only 2 inches of travel would be inadequate for this run.

4. Flexible Conduits: FMC (Article 348) & LFMC (Article 350)

Flexible Metal Conduit (FMC) and Liquidtight Flexible Metal Conduit (LFMC) provide vibration isolation, mechanical flexibility, and ease of routing to motors, transformers, and luminaires. +-----------------------------------------------------------------------------+

  • | FLEXIBLE CONDUIT SUPPORT & EGC RULES |
  • | |
  • | [SUPPORT SPACING (348.30 / 350.30)] |
  • | * Fastened within 12 INCHES (300 mm) of every box/fitting. |
  • | * Supported at intervals not exceeding 4.5 FEET (1.4 m) along run. |
  • | |
  • | [SUPPORT EXCEPTIONS] |
  • | * Lengths up to 3 FEET at terminals where flexibility is required. |
  • | * Lengths up to 6 FEET from luminaire terminal connection (fixture whip). |
  • | |
  • | [EQUIPMENT GROUNDING RESTRICTIONS (NEC 250.118(5) & (6))] |
  • | FMC / LFMC may serve as the sole EGC ONLY IF: |
  • | 1. The total length in the ground return path DOES NOT EXCEED 6 FEET. |
  • | 2. The circuit is protected by an OCPD rated <= 20A (for 3/8"-1/2") |
  • | or <= 60A (for 3/4" through 1-1/4"). |
  • | 3. Listed grounding fittings are installed. |
  • | If run > 6 ft or circuit > 60A: MUST pull a separate wire-type EGC! |
  • +-----------------------------------------------------------------------------+

5. Master Raceway Comparison & Bend Budget Matrix +-----------------------------------------------------------------------------+

  • | THE 360-DEGREE BEND BUDGET CALCULATION |
  • | |
  • | [PULL BOX A] [PULL BOX B] |
  • | | | |
  • | +-----( 90° )=======( 90° )=======( 90° )=======( 90° )---+ |
  • | 1 2 3 4 |
  • | |
  • | Total Bend Degrees = 90° + 90° + 90° + 90° = 360° (MAXIMUM PERMITTED!) |
  • | If a 5th bend (even 15°) is added, a pull point or conduit body (C, LB) |
  • | MUST be inserted! |
  • +-----------------------------------------------------------------------------+
  • Raceway Type Article Box Fastening Distance Maximum Support Interval Grounding Path Capability (250.118)
  • EMT (Thin-wall) 358 3 feet 10 feet Listed as sole EGC (with approved fittings)
  • RMC (Rigid Steel) 344 3 feet 10 to 20 feet (Table 344.30(B)(2)) Supreme EGC (threaded joints)
  • IMC (Intermediate) 342 3 feet 10 to 20 feet (Table 342.30(B)(2)) Supreme EGC (threaded joints)
  • PVC (Schedule 40/80) 352 3 feet 3 to 8 feet (Table 352.30) NO (Must install separate wire EGC)
  • FMC (Greenfield) 348 12 inches 4.5 feet Permitted <= 6 ft & <= 20A (otherwise wire EGC)
  • LFMC (Sealtite) 350 12 inches 4.5 feet Permitted <= 6 ft & <= 60A (otherwise wire EGC)