3.3 Move/Add/Change (MAC), Construction Execution & Commissioning

IFMA CFM Certified Facility Manager Exam

Track your progress as you read

Finished sections get a check mark.

1 Introduction & Exam Overview

0.1 Current CFM Exam Facts & Official Blueprint 0.2 How to Use This Study Guide & CFM Prep Strategy

2 Chapter 1: Facility Operations (Domain B, 10%)

1.1 Facility Condition Assessments & Building Audits 1.2 Maintenance Strategies: PM, PdM, RCM & CMMS Workflow 1.3 Building Physical Systems: HVAC, Electrical, Plumbing & Life Safety 1.4 Occupant Services, Custodial Operations & Service Delivery 1.5 Asset Management, FF&E & Work Management Systems (B.4–B.5 / B.7)

3 Chapter 2: Leadership & Strategy (Domain A, 10%)

2.1 Strategic Facility Planning (SFP) & Alignment 2.2 FM Organizational Models & Governance 2.3 Change Leadership & Transformation in FM 2.4 Executive Stakeholder Management & Value Demonstration 2.5 Political, Social, Economic & Industry Factors (A.6)

4 Chapter 3: Project Management (Domain J, 10%)

3.1 Project Initiation, Scope Definition & Feasibility 3.2 Project Scheduling, Cost Estimating & Budget Control 3.3 Move/Add/Change (MAC), Construction Execution & Commissioning 3.4 Project Closeout & Turnover to Operations (J.3)

5 Chapter 4: Finance & Business (Domain D, 10%)

4.1 Operating & Capital Budgeting in FM 4.2 Financial Evaluation & Investment Analysis 4.3 Procurement, Sourcing Strategies & Contract Administration

6 Chapter 5: Real Estate (Domain H, 10%)

5.1 Real Estate Portfolio Planning & Asset Strategy 5.2 Lease Administration & Commercial Lease Types 5.3 Space Planning, Occupancy Management & Workplace Strategy

7 Chapter 6: Sustainability (Domain E, 10%)

6.1 Building Energy Management & Decarbonization 6.2 Sustainable Building Rating Systems & ESG Integration 6.3 Water Conservation, Waste Reduction & Circular Economy 6.4 Materials, Consumables & Site Management (E.5 / E.8)

8 Chapter 7: Risk Management (Domain C, 10%)

7.1 Hazard Identification, Risk Assessment & Insurance 7.2 Emergency Response Planning & Business Continuity 7.3 Physical Security, Access Control & Cybersecurity Integration

9 Chapter 8: Occupant Health, Safety & Wellness (B.6 / E.7)

8.1 Indoor Environmental Quality (IEQ) & Occupant Thermal/Acoustic Comfort 8.2 Workplace Ergonomics, Health & Safety 8.3 Universal Design, ADA Compliance & Occupant Engagement

10 Chapter 9: Quality (Domain G, 10%)

9.1 Quality Assurance, KPIs & Service Level Agreements 9.2 Continuous Improvement & Operational Methodologies 9.3 FM Benchmarking & Performance Metrics

11 Chapter 10: Communication (Domain F, 10%)

10.1 Strategic Communication Planning & Crisis Communication 10.2 Executive Reporting & FM Value Storytelling 10.3 Cross-Functional Collaboration & Conflict Resolution

12 Chapter 11: Facility Technology & Data Management (Domain I, 10%)

11.1 CAFM, CMMS & Integrated Workplace Management Systems 11.2 BIM for FM, IoT Sensors & Smart Building Automation 11.3 FM Data Governance, Information Security & Predictive Analytics

3.3 Move/Add/Change (MAC), Construction Execution & Commissioning

Key Takeaways Explain This Topic AI

Move/Add/Change (MAC) management controls workplace churn, managing employee relocations and furniture adjustments to optimize spatial agility and minimize cost.

Construction administration relies on disciplined tracking of RFIs, Submittals, Change Orders, and Punch Lists to enforce quality, cost, and schedule parameters.

Substantial Completion marks the milestone where the facility is sufficiently complete for its intended use, shifting building custody, insurance, and warranty periods.

Building Commissioning (Cx) is a systematic quality assurance process operating through Pre-Design, Design, Construction, and Occupancy phases to ensure systems perform per owner requirements.

Existing building performance is maintained and restored through Retro-Commissioning (Re-Cx) and Continuous Commissioning programs.

Last updated: July 2026

3.3 Move/Add/Change (MAC), Construction Execution & Commissioning

The final stages of facility project delivery translate design documents into operational reality. Facility managers must manage construction execution in the field, coordinate Move/Add/Change (MAC) operations for workspace occupants, and enforce comprehensive Building Commissioning (Cx) to verify system performance. Mastery of construction administration controls, MAC churn metrics, and building handover protocols is essential for CFM certification.

1. Move/Add/Change (MAC) Operations & Churn Management

Move/Add/Change (MAC) operations refer to the day-to-day or project-driven relocation of personnel, workstations, technology, and equipment within facility portfolios.

Key Concepts in MAC Management

Churn Rate: The percentage of an organization's personnel or workstations that move or are altered within a given year. Churn Rate (%) = ( Total Number of Moves / Relocations per Year Total Building Headcount / Occupants ) × 100 \text{Churn Rate (\%)} = \left( \frac{\text{Total Number of Moves / Relocations per Year}}{\text{Total Building Headcount / Occupants}} \right) \times 100 Churn Rate (%) = ( Total Building Headcount / Occupants Total Number of Moves / Relocations per Year ​ ) × 100

High Churn Industries: Technology, financial services, and consulting firms often experience annual churn rates exceeding 30% to 50%.

Types of Moves:

Box Move (Individual/Group): Simple relocation of personal effects, computer hardware, and files to existing configured workstations.

Project / Departmental Move: Phased relocation of entire divisions, requiring space re-planning, MEP re-configuration, and IT patching.

Swing Space Move: Temporary relocation of staff to transitional space while their primary workspace undergoes renovation.

MAC Logistics & Execution Workflow [ MAC Request Submission ] ──► [ Space & IT Feasibility Review ] ──► [ Move Schedule & Labeling ]

  • │
  • [ Post-Move Support & Sign-Off ] ◄── [ Physical Move & IT Setup ] ◄───────────┘

Move Management Software (CAFM / IWMS): Automated ticketing and space management systems track move requests, asset tags, seat assignments, and network port mapping.

IT & Telecom Integration: Coordination of IP telephony, network patch panel re-routing, desktop hardware reconnects, and access control badge permissions prior to Day 1 occupancy.

Move Communication & Logistics: Providing move kits, color-coded box labels, crate deliveries, and clear move-instructions to employees to prevent lost assets.

Day-One Post-Move Support: Deploying "Help Desks" or move champions on the first business day following a move to immediately address missing peripherals, ergonomic adjustments, or key card issues.

2. Construction Administration & Quality Controls

During physical construction, the facility project manager acts as the owner's representative, monitoring the general contractor (GC) and design team to ensure contract compliance.

Administrative Control Purpose & Operational Mechanics

Request for Information (RFI) Formal query submitted by the GC to the architect/engineer seeking clarification on drawing inconsistencies, field obstructions, or specification ambiguities. Must be answered promptly to avoid schedule claims.

Submittals & Shop Drawings Detailed fabrication drawings, product data sheets, and physical samples submitted by trade subcontractors for design team approval prior to material fabrication or installation (e.g., air handler shop drawings, carpet samples).

Change Orders (CO) Formal contract modifications that alter project scope, contract cost, or completion schedule. Must be reviewed, negotiated, and approved by the FM prior to work execution to prevent unauthorized budget drift.

Application for Payment & Retainage Monthly billing submitted by the GC based on percentage of completion. The FM typically retains 5% to 10% (Retainage) from each progress payment until final project completion to ensure punch list performance.

Project Completion & Handover Milestones [ Construction Progress ] ──► [ Substantial Completion ] ──► [ Certificate of Occupancy ] ──► [ Final Acceptance & Closeout ]

  • │ │
  • ├── Punch List Generation ├── Retainage Release
  • ├── Warranty Period Starts └── O&M Manuals / As-Builts
  • └── Custody / Insurance Transfers

Substantial Completion: The stage in the progress of work when the facility (or designated portion) is sufficiently complete in accordance with contract documents so that the owner can occupy or utilize it for its intended use.

Significance: Marks the formal end of liquidated damages, shifts insurance liability and utility costs to the owner, and triggers the start of statutory equipment warranty periods.

Certificate of Occupancy (CO): Official permit issued by the local Authority Having Jurisdiction (AHJ / Building Inspector) certifying that the building complies with applicable building, fire, and health codes and is safe for human occupancy.

Punch List Inspection: A joint walkthrough by the FM, architect, engineer, and GC to identify minor non-conforming work, cosmetic defects, or incomplete items (e.g., missing wall plates, scratched paint, uncalibrated thermostats). Items are documented on a punch list that the GC must complete prior to final payment.

Final Closeout & Acceptance: Submission of options and maintenance (O&M) manuals, warranty certificates, attic stock materials, finalized as-built drawings (BIM models), and full release of contractor retainage.

3. Building Commissioning (Cx)

Building Commissioning (Cx) is a systematic quality assurance process that verifies and documents that all building systems and assemblies are designed, installed, tested, and operated to meet the Owner's Project Requirements (OPR) .

Commissioning Across Project Phases

Phase Key Commissioning Activities

Pre-Design Phase Develop the Owner's Project Requirements (OPR) document; select the Commissioning Authority (CxA).

Design Phase Create the Basis of Design (BOD) document; conduct Cx design reviews; write Cx specifications into bid documents.

Construction Phase Inspect installation of commissioned equipment; review shop drawings; conduct pre-functional checklists.

Occupancy & Acceptance Phase Perform Functional Performance Testing (FPT) under full operational loads; train O&M staff; deliver final Cx report.

Post-Occupancy Phase Conduct 10-month seasonal testing prior to warranty expiration; resolve latent operational defects.

Specialized Commissioning Types

Retro-Commissioning (Re-Cx): A commissioning process applied to existing buildings that have never been commissioned. Identifies operational improvements, baseline energy waste, and control sequence corrections without major capital equipment replacement.

Re-Commissioning: Commissioning an existing facility that was previously commissioned, performed periodically (e.g., every 3-5 years) to restore systems to optimal operating efficiency.

Continuous (Ongoing) Commissioning: An ongoing process using automated fault detection and diagnostics (AFDD) software integrated with Smart Building IoT sensors to continuously monitor and optimize system performance.