Study guide

4.3 Time & Work, Pipes & Cisterns, Time, Speed & Distance

Coal India Management Trainee CIL MT

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: CIL MT Exam Overview & Coal Sector Landscape

1.1 CIL MT Exam Pattern, Marking Scheme & Strategy 1.2 Coal India Limited: Corporate Structure, Maharatna Status & Subsidiaries 1.3 Indian Coal Mining Sector, Energy Mix & Environmental Regulations

2 Chapter 2: Paper-I General Awareness, Polity & Current Affairs

2.1 Indian Constitution, Governance & Statutory Bodies 2.2 Indian Economy, Union Budget & Economic Planning 2.3 Indian Geography, Mineral Belts & Environmental Ecology 2.4 Modern Indian History, Freedom Struggle & Cultural Heritage 2.5 General Science: Physics, Chemistry & Biology Fundamentals 2.6 Inventions, Discoveries & Scientific-Technological Development 2.7 Uses of Internet, Computer Awareness & Digital Governance 2.8 National & International Organisations 2.9 Awards, Honours & Sports 2.10 Books & Authors, Important Monuments & Places of India 2.11 Ports, Power Plants & Infrastructure of India 2.12 Climate Change, SDGs, National Parks & Wildlife Sanctuaries 2.13 Flagship Government Programmes & Current Affairs Method 2.14 World Physical, Social & Economic Geography

3 Chapter 3: Paper-I Reasoning & Logical Ability

3.1 Series Completion, Coding-Decoding & Semantic Analogies 3.2 Syllogisms, Logical Deduction & Venn Diagrams 3.3 Seating Arrangements, Linear/Circular Alignments & Puzzles 3.4 Direction Sense, Blood Relations & Order/Ranking 3.5 Alphabetical & Alphanumeric Series 3.6 Statement & Conclusions, Statement & Arguments 3.7 Clocks & Calendars 3.8 Cubes, Dice & Figure Counting 3.9 Mirror Images, Water Images, Embedded Figures & Non-Verbal Series 3.10 Decision Making & Data Analysis in Reasoning

4 Chapter 4: Paper-I Numerical Ability & Quantitative Aptitude

4.1 Arithmetic Foundations: Percentages, Profit & Loss, Ratio & Proportion 4.2 Averages, Simple/Compound Interest, Alligations & Mixtures 4.3 Time & Work, Pipes & Cisterns, Time, Speed & Distance 4.4 Algebra, Mensuration, Geometry & Data Interpretation (DI) 4.5 Number System, LCM, HCF & Decimal Fractions 4.6 Surds, Indices & Simplification 4.7 Problems on Ages 4.8 Boats & Streams and Problems on Trains 4.9 Permutations & Combinations 4.10 Probability for Quantitative Aptitude

5 Chapter 5: Paper-I General English & Verbal Ability

5.1 English Grammar, Error Spotting & Sentence Correction 5.2 Vocabulary Building: Synonyms, Antonyms, Idioms & Phrases 5.3 Reading Comprehension, Cloze Tests & Para Jumbles 5.4 Fill in the Blanks, Cloze Passages & Sentence Completion 5.5 Jumbled Sentences & Sentence Improvement

6 Chapter 6: Paper-II Engineering Mathematics

6.1 Matrix Algebra, Rank & Systems of Linear Equations 6.2 Eigenvalues, Eigenvectors & the Cayley-Hamilton Theorem 6.3 Limits, Continuity, Differentiability & Mean Value Theorems 6.4 Maxima-Minima, Indeterminate Forms & Taylor Series 6.5 Definite, Improper, Double & Triple Integrals 6.6 Partial Derivatives, Total Derivative & Multivariable Optimisation 6.7 First-Order Differential Equations: Linear & Non-Linear 6.8 Higher-Order Linear Differential Equations & Engineering Applications 6.9 Laplace Transforms & Transfer-Function Methods 6.10 Probability, Conditional Probability & Bayes' Theorem 6.11 Random Variables, Distributions & Descriptive Statistics 6.12 Numerical Methods: Root Finding, Integration & ODE Solvers

7 Chapter 7: Paper-II Engineering Mechanics & Statics-Dynamics

7.1 Force Systems, Coplanar Equilibrium & Lami's Theorem 7.2 Plane Trusses, Friction Mechanics & Screws/Wedges 7.3 Centroids, Center of Gravity & Moment of Inertia 7.4 Kinematics, Kinetics of Particles & Rigid Body Dynamics 7.5 Virtual Work & Lagrange's Equation 7.6 Rolling Friction, Belt-Pulley Drives, Brakes, Clutches & Vehicle Dynamics

8 Chapter 8: Paper-II Mechanics of Materials & Structural Integrity

8.1 Simple Stresses, Strains, Elastic Moduli & Thermal Stresses 8.2 Principal Stresses, Strain Energy & Mohr's Circle 8.3 Shear Force & Bending Moment Diagrams, Beam Bending & Shear Stresses 8.4 Torsion of Circular Shafts, Springs & Column Buckling 8.5 Thin Cylinders, Spheres & Thick-Walled Pressure Vessels 8.6 Deflection of Beams: Double Integration, Macaulay & Moment-Area 8.7 Shear Centre & Unsymmetrical Bending 8.8 Strain Gauges, Rosettes & Experimental Stress Analysis 8.9 Mechanical Testing: Universal Testing Machine, Hardness & Impact

9 Chapter 9: Paper-II Theory of Machines & Mechanical Vibrations

9.1 Simple Mechanisms, Kinematic Inversions & Velocity/Acceleration Diagrams 9.2 Cams & Followers, Toothed Gearing & Epicyclic Gear Trains 9.3 Flywheels, Centrifugal/Inertia Governors & Rotor Balancing 9.4 Free, Damped & Forced Single-Degree-of-Freedom Vibrations 9.5 Gyroscopic Couple & Gyroscopic Effects

10 Chapter 10: Paper-II Machine Design & Failure Theories

10.1 Static Failure Theories & Variable/Fatigue Loading 10.2 Design of Threaded Fasteners, Welded & Riveted Joints 10.3 Design of Shafts, Keys, Couplings & Rolling/Sliding Bearings 10.4 Design of Spur, Helical, Bevel & Worm Gears 10.5 Design of Helical, Leaf & Torsion Springs 10.6 Design of Brakes & Clutches: Energy, Lining Pressure & Heat

11 Chapter 11: Paper-II Fluid Mechanics & Hydraulic Machinery

11.1 Fluid Properties, Hydrostatic Forces & Buoyancy 11.2 Fluid Kinematics, Continuity & Bernoulli's Equation 11.3 Viscous Flow in Pipes, Boundary Layer & Minor Losses 11.4 Hydraulic Turbines, Centrifugal & Reciprocating Pumps 11.5 Dimensional Analysis, Similitude & Model Testing 11.6 Control-Volume Analysis: Continuity, Momentum & Energy

12 Chapter 12: Paper-II Thermodynamics, Thermal Cycles & Turbomachinery

12.1 Fundamental Concepts, First & Second Laws of Thermodynamics 12.2 Entropy, Availability, Exergy & Properties of Pure Substances 12.3 Air-Standard Gas Power Cycles: Otto, Diesel, Dual & Brayton 12.4 Vapour Power Cycles: Ideal, Reheat & Regenerative Rankine Cycles 12.5 Thermodynamic Relations: Maxwell, Clausius-Clapeyron & Joule-Thomson 12.6 Behaviour of Ideal & Real Gases and Equations of State 12.7 Air & Gas Compressors: Reciprocating, Rotary & Multi-Stage 12.8 Steam & Gas Turbines: Impulse, Reaction & Velocity Diagrams

13 Chapter 13: Paper-II Heat Transfer, Refrigeration & Air Conditioning

13.1 Steady & Unsteady Conduction, Extended Surfaces (Fins) 13.2 Forced/Natural Convection, Radiation & Heat Exchanger LMTD/NTU 13.3 Vapour Compression & Vapour Absorption Refrigeration Systems 13.4 Psychrometric Properties, Processes & Air Conditioning Systems 13.5 Gas Refrigeration, Heat Pump Cycles & Cryogenics

14 Chapter 14: Paper-II Materials Science, Metallurgy & Manufacturing Technology

14.1 Crystal Structures, Phase Diagrams & Iron-Iron Carbide Equilibrium 14.2 Heat Treatment Processes & Engineering Alloy Steels 14.3 Casting Processes, Metal Forming & Welding Metallurgy 14.4 Metal Cutting Mechanics, Tool Life & Machine Tools 14.5 Plastic Deformation, Yield Criteria & Load Estimation in Bulk Forming 14.6 Sheet Metal Forming: Shearing, Bending & Deep Drawing 14.7 Powder Metallurgy 14.8 Brazing, Soldering & Adhesive Bonding 14.9 Non-Traditional Machining: EDM, ECM, USM, AJM, LBM & EBM 14.10 Abrasive Machining, Grinding & Superfinishing 14.11 Principles of Work Holding, Jigs & Fixtures 14.12 Economics of Machining & Tool Life Optimisation

15 Chapter 15: Paper-II Metrology, Quality Control & Industrial Engineering / OR

15.1 Limits, Fits, Tolerances, Gauges & Surface Metrology 15.2 Production Planning, Forecasting & Inventory Control Models 15.3 Operations Research: Linear Programming & Transportation/Assignment 15.4 Project Management: CPM, PERT, Network Analysis & Crashing 15.5 Comparators & Interferometry 15.6 Coordinate Measuring Machines & Machine Tool Alignment Testing 15.7 Computer Integrated Manufacturing: CAD/CAM & Integration Tools 15.8 NC/CNC Machines & CNC Part Programming 15.9 Material Requirements Planning, Scheduling & Sequencing 15.10 Queuing Theory & Simple Queuing Models 15.11 Network Flow Models: Shortest Route, Maximal Flow & Spanning Tree

4.3 Time & Work, Pipes & Cisterns, Time, Speed & Distance

Key Takeaways Explain This Topic AI

The LCM Units method converts reciprocal work rates into integer daily efficiencies, dramatically streamlining multi-worker, alternate-day, and variable-schedule problems.

The generalized work equivalence identity M 1 D 1 H 1 E 1 W 1 = M 2 D 2 H 2 E 2 W 2 \frac{M_1 D_1 H_1 E_1}{W_1} = \frac{M_2 D_2 H_2 E_2}{W_2} W 1 ​ M 1 ​ D 1 ​ H 1 ​ E 1 ​ ​ = W 2 ​ M 2 ​ D 2 ​ H 2 ​ E 2 ​ ​ provides a universal template for contractor workforce adjustments, overtime calculations, and multi-stage tasks.

Pipes and cisterns operate on algebraic net efficiency, where inlet filling rates are positive ( + E +E + E ) and drain/leak rates are negative ( − E -E − E ).

Relative speed is the difference ( u − v ) (u - v) ( u − v ) for collinear motion in the same direction and the sum ( u + v ) (u + v) ( u + v ) for opposite directions; train crossing equations must sum physical lengths ( L 1 + L 2 L_1 + L_2 L 1 ​ + L 2 ​ ).

Boats and streams resolve into downstream velocity D = u + v D = u + v D = u + v and upstream velocity U = u − v U = u - v U = u − v , yielding still water speed u = D + U 2 u = \frac{D+U}{2} u = 2 D + U ​ and stream current speed v = D − U 2 v = \frac{D-U}{2} v = 2 D − U ​ .

Last updated: August 2026

Time & Work, Pipes & Cisterns, Time, Speed & Distance

Efficiency analysis, project completion timelines, pipeline filling dynamics, and haulage transport logistics form the operational core of mining engineering. In CIL MT Paper-I, questions testing Time & Work and Time, Speed & Distance (TSD) are heavily emphasized. Mastering integer LCM models and relative speed mechanics allows candidates to bypass fraction-heavy systems of equations.

1. Time & Work: The LCM Efficiency Model

Instead of assigning total work as 1 1 1 and handling reciprocal fractions (e.g., 1 / 12 + 1 / 15 1/12 + 1/15 1/12 + 1/15 ), assume total work to be the Least Common Multiple (LCM) of the individual completion times. This converts daily work rates into intuitive integer efficiencies.

Step-by-Step LCM Method

Define Total Work ( W W W ): LCM ( T A , T B , T C ) \text{LCM}(T_A, T_B, T_C) LCM ( T A ​ , T B ​ , T C ​ ) .

Calculate Daily Efficiencies: E A = W / T A E_A = W / T_A E A ​ = W / T A ​ , E B = W / T B E_B = W / T_B E B ​ = W / T B ​ , E C = W / T C E_C = W / T_C E C ​ = W / T C ​ .

Calculate Combined Rate: E combined = E A + E B + E C E_{\text{combined}} = E_A + E_B + E_C E combined ​ = E A ​ + E B ​ + E C ​ .

Evaluate Completion Time: T = W E combined T = \frac{W}{E_{\text{combined}}} T = E combined ​ W ​ .

Alternate-Day Working Schedules

When workers operate in rotation (e.g., Worker A on Day 1, Worker B on Day 2):

Determine work accomplished during one complete cycle: W cycle = E A + E B W_{\text{cycle}} = E_A + E_B W cycle ​ = E A ​ + E B ​ .

Determine number of complete cycles: k = ⌊ W / W cycle ⌋ k = \lfloor W / W_{\text{cycle}} \rfloor k = ⌊ W / W cycle ​ ⌋ .

Calculate remaining work: W rem = W − ( k × W cycle ) W_{\text{rem}} = W - (k \times W_{\text{cycle}}) W rem ​ = W − ( k × W cycle ​ ) .

Allocate W rem W_{\text{rem}} W rem ​ sequentially to the active worker in the next rotation.

Work and Wages Principle

Wages are divided strictly in proportion to the total quantum of work executed by each individual (Efficiency × \times × Days Worked): Wage Share Ratio ( W A : W B ) = ( E A × D A ) : ( E B × D B ) \text{Wage Share Ratio } (W_A : W_B) = (E_A \times D_A) : (E_B \times D_B) Wage Share Ratio ( W A ​ : W B ​ ) = ( E A ​ × D A ​ ) : ( E B ​ × D B ​ )

Generalized Work Equivalence Formula

For problems with varying worker headcounts, daily hours, work efficiencies, and project scales, use the universal chain rule: M 1 × D 1 × H 1 × E 1 W 1 = M 2 × D 2 × H 2 × E 2 W 2 \frac{M_1 \times D_1 \times H_1 \times E_1}{W_1} = \frac{M_2 \times D_2 \times H_2 \times E_2}{W_2} W 1 ​ M 1 ​ × D 1 ​ × H 1 ​ × E 1 ​ ​ = W 2 ​ M 2 ​ × D 2 ​ × H 2 ​ × E 2 ​ ​

Where:

  • M = Number of workers M = \text{Number of workers} M = Number of workers
  • D = Number of days D = \text{Number of days} D = Number of days
  • H = Working hours per day H = \text{Working hours per day} H = Working hours per day
  • E = Relative worker efficiency E = \text{Relative worker efficiency} E = Relative worker efficiency

W = Quantified work units (volume, length, items) W = \text{Quantified work units (volume, length, items)} W = Quantified work units (volume, length, items)

2. Pipes & Cisterns Mechanics

Pipes and cisterns problems mirror Time & Work, with one critical extension: outlet pipes and leaks exert negative efficiency .

Inlet Pipe ( A A A ): Fills tank in T A T_A T A ​ hours ⟹ E A = + W T A \implies E_A = +\frac{W}{T_A} ⟹ E A ​ = + T A ​ W ​

Outlet Pipe / Leak ( B B B ): Empties tank in T B T_B T B ​ hours ⟹ E B = − W T B \implies E_B = -\frac{W}{T_B} ⟹ E B ​ = − T B ​ W ​

Net Efficiency ( E net E_{\text{net}} E net ​ ): E net = E A − E B E_{\text{net}} = E_A - E_B E net ​ = E A ​ − E B ​ Net Time to Fill T = W E A − E B = T A × T B T B − T A ( when T B > T A ) \text{Net Time to Fill } T = \frac{W}{E_A - E_B} = \frac{T_A \times T_B}{T_B - T_A} \quad (\text{when } T_B > T_A) Net Time to Fill T = E A ​ − E B ​ W ​ = T B ​ − T A ​ T A ​ × T B ​ ​ ( when T B ​ > T A ​ )

Loading diagram... Relative Velocity and Distance Equations in TSD

3. Time, Speed & Distance (TSD) Fundamentals

Core Formulas & Unit Conversions Distance ( D ) = Speed ( S ) × Time ( T ) \text{Distance } (D) = \text{Speed } (S) \times \text{Time } (T) Distance ( D ) = Speed ( S ) × Time ( T )

km/h to m/s: Multiply by 5 18 \frac{5}{18} 18 5 ​ (e.g., 72 km/h = 72 × 5 18 = 20 m/s 72\text{ km/h} = 72 \times \frac{5}{18} = 20\text{ m/s} 72 km/h = 72 × 18 5 ​ = 20 m/s ).

m/s to km/h: Multiply by 18 5 \frac{18}{5} 5 18 ​ (e.g., 15 m/s = 15 × 18 5 = 54 km/h 15\text{ m/s} = 15 \times \frac{18}{5} = 54\text{ km/h} 15 m/s = 15 × 5 18 ​ = 54 km/h ).

Average Speed Average Speed = Total Distance Traveled Total Time Taken \text{Average Speed} = \frac{\text{Total Distance Traveled}}{\text{Total Time Taken}} Average Speed = Total Time Taken Total Distance Traveled ​

Two Equal Distance Segments: When an object travels equal distances at speeds S 1 S_1 S 1 ​ and S 2 S_2 S 2 ​ , the average speed is the harmonic mean: S avg = 2 S 1 S 2 S 1 + S 2 S_{\text{avg}} = \frac{2 S_1 S_2}{S_1 + S_2} S avg ​ = S 1 ​ + S 2 ​ 2 S 1 ​ S 2 ​ ​

Three Equal Distance Segments: S avg = 3 S 1 S 2 S 3 S 1 S 2 + S 2 S 3 + S 3 S 1 S_{\text{avg}} = \frac{3 S_1 S_2 S_3}{S_1 S_2 + S_2 S_3 + S_3 S_1} S avg ​ = S 1 ​ S 2 ​ + S 2 ​ S 3 ​ + S 3 ​ S 1 ​ 3 S 1 ​ S 2 ​ S 3 ​ ​

Late and Early Arrival Distance Shortcut

If traveling at speed S 1 S_1 S 1 ​ leads to arriving t 1 t_1 t 1 ​ minutes late, and traveling at speed S 2 S_2 S 2 ​ leads to arriving t 2 t_2 t 2 ​ minutes early (net time difference Δ t = t 1 + t 2 \Delta t = t_1 + t_2 Δ t = t 1 ​ + t 2 ​ hours): D = S 1 × S 2 ∣ S 1 − S 2 ∣ × Δ t D = \frac{S_1 \times S_2}{|S_1 - S_2|} \times \Delta t D = ∣ S 1 ​ − S 2 ​ ∣ S 1 ​ × S 2 ​ ​ × Δ t

  • 4. Trains, Relative Velocity, and Boats & Streams
  • Train Crossing Formulas

Scenario Distance Traversed Speed Formula Crossing Time ( T T T )

Train crossing stationary pole/man L train L_{\text{train}} L train ​ S train S_{\text{train}} S train ​ T = L train S train T = \frac{L_{\text{train}}}{S_{\text{train}}} T = S train ​ L train ​ ​

Train crossing platform/bridge L train + L plat L_{\text{train}} + L_{\text{plat}} L train ​ + L plat ​ S train S_{\text{train}} S train ​ T = L train + L plat S train T = \frac{L_{\text{train}} + L_{\text{plat}}}{S_{\text{train}}} T = S train ​ L train ​ + L plat ​ ​

Two trains crossing (Opposite dir.) L 1 + L 2 L_1 + L_2 L 1 ​ + L 2 ​ S 1 + S 2 S_1 + S_2 S 1 ​ + S 2 ​ T = L 1 + L 2 S 1 + S 2 T = \frac{L_1 + L_2}{S_1 + S_2} T = S 1 ​ + S 2 ​ L 1 ​ + L 2 ​ ​

Two trains crossing (Same dir.) L 1 + L 2 L_1 + L_2 L 1 ​ + L 2 ​ S 1 − S 2 S_1 - S_2 S 1 ​ − S 2 ​ T = L 1 + L 2 S 1 − S 2 T = \frac{L_1 + L_2}{S_1 - S_2} T = S 1 ​ − S 2 ​ L 1 ​ + L 2 ​ ​

Boats and Streams Mechanics

Let speed of boat in still water = u km/h = u\text{ km/h} = u km/h and speed of water current = v km/h = v\text{ km/h} = v km/h :

  • Downstream Speed ( D D D ): Motion with the current ⟹ D = u + v \implies D = u + v ⟹ D = u + v
  • Upstream Speed ( U U U ): Motion against the current ⟹ U = u − v \implies U = u - v ⟹ U = u − v

From these two equations, we obtain: Speed of Boat in Still Water ( u ) = D + U 2 \text{Speed of Boat in Still Water } (u) = \frac{D + U}{2} Speed of Boat in Still Water ( u ) = 2 D + U ​ Speed of Current ( v ) = D − U 2 \text{Speed of Current } (v) = \frac{D - U}{2} Speed of Current ( v ) = 2 D − U ​

Round-Trip Average Speed: S avg, round trip = 2 × D × U D + U = 2 ( u + v ) ( u − v ) 2 u = u 2 − v 2 u S_{\text{avg, round trip}} = \frac{2 \times D \times U}{D + U} = \frac{2(u + v)(u - v)}{2u} = \frac{u^2 - v^2}{u} S avg, round trip ​ = D + U 2 × D × U ​ = 2 u 2 ( u + v ) ( u − v ) ​ = u u 2 − v 2 ​