Study guide
15.2 Production Planning, Forecasting & Inventory Control Models
Coal India Management Trainee CIL MT
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: CIL MT Exam Overview & Coal Sector Landscape
1.1 CIL MT Exam Pattern, Marking Scheme & Strategy 1.2 Coal India Limited: Corporate Structure, Maharatna Status & Subsidiaries 1.3 Indian Coal Mining Sector, Energy Mix & Environmental Regulations
2 Chapter 2: Paper-I General Awareness, Polity & Current Affairs
2.1 Indian Constitution, Governance & Statutory Bodies 2.2 Indian Economy, Union Budget & Economic Planning 2.3 Indian Geography, Mineral Belts & Environmental Ecology 2.4 Modern Indian History, Freedom Struggle & Cultural Heritage 2.5 General Science: Physics, Chemistry & Biology Fundamentals 2.6 Inventions, Discoveries & Scientific-Technological Development 2.7 Uses of Internet, Computer Awareness & Digital Governance 2.8 National & International Organisations 2.9 Awards, Honours & Sports 2.10 Books & Authors, Important Monuments & Places of India 2.11 Ports, Power Plants & Infrastructure of India 2.12 Climate Change, SDGs, National Parks & Wildlife Sanctuaries 2.13 Flagship Government Programmes & Current Affairs Method 2.14 World Physical, Social & Economic Geography
3 Chapter 3: Paper-I Reasoning & Logical Ability
3.1 Series Completion, Coding-Decoding & Semantic Analogies 3.2 Syllogisms, Logical Deduction & Venn Diagrams 3.3 Seating Arrangements, Linear/Circular Alignments & Puzzles 3.4 Direction Sense, Blood Relations & Order/Ranking 3.5 Alphabetical & Alphanumeric Series 3.6 Statement & Conclusions, Statement & Arguments 3.7 Clocks & Calendars 3.8 Cubes, Dice & Figure Counting 3.9 Mirror Images, Water Images, Embedded Figures & Non-Verbal Series 3.10 Decision Making & Data Analysis in Reasoning
4 Chapter 4: Paper-I Numerical Ability & Quantitative Aptitude
4.1 Arithmetic Foundations: Percentages, Profit & Loss, Ratio & Proportion 4.2 Averages, Simple/Compound Interest, Alligations & Mixtures 4.3 Time & Work, Pipes & Cisterns, Time, Speed & Distance 4.4 Algebra, Mensuration, Geometry & Data Interpretation (DI) 4.5 Number System, LCM, HCF & Decimal Fractions 4.6 Surds, Indices & Simplification 4.7 Problems on Ages 4.8 Boats & Streams and Problems on Trains 4.9 Permutations & Combinations 4.10 Probability for Quantitative Aptitude
5 Chapter 5: Paper-I General English & Verbal Ability
5.1 English Grammar, Error Spotting & Sentence Correction 5.2 Vocabulary Building: Synonyms, Antonyms, Idioms & Phrases 5.3 Reading Comprehension, Cloze Tests & Para Jumbles 5.4 Fill in the Blanks, Cloze Passages & Sentence Completion 5.5 Jumbled Sentences & Sentence Improvement
6 Chapter 6: Paper-II Engineering Mathematics
6.1 Matrix Algebra, Rank & Systems of Linear Equations 6.2 Eigenvalues, Eigenvectors & the Cayley-Hamilton Theorem 6.3 Limits, Continuity, Differentiability & Mean Value Theorems 6.4 Maxima-Minima, Indeterminate Forms & Taylor Series 6.5 Definite, Improper, Double & Triple Integrals 6.6 Partial Derivatives, Total Derivative & Multivariable Optimisation 6.7 First-Order Differential Equations: Linear & Non-Linear 6.8 Higher-Order Linear Differential Equations & Engineering Applications 6.9 Laplace Transforms & Transfer-Function Methods 6.10 Probability, Conditional Probability & Bayes' Theorem 6.11 Random Variables, Distributions & Descriptive Statistics 6.12 Numerical Methods: Root Finding, Integration & ODE Solvers
7 Chapter 7: Paper-II Engineering Mechanics & Statics-Dynamics
7.1 Force Systems, Coplanar Equilibrium & Lami's Theorem 7.2 Plane Trusses, Friction Mechanics & Screws/Wedges 7.3 Centroids, Center of Gravity & Moment of Inertia 7.4 Kinematics, Kinetics of Particles & Rigid Body Dynamics 7.5 Virtual Work & Lagrange's Equation 7.6 Rolling Friction, Belt-Pulley Drives, Brakes, Clutches & Vehicle Dynamics
8 Chapter 8: Paper-II Mechanics of Materials & Structural Integrity
8.1 Simple Stresses, Strains, Elastic Moduli & Thermal Stresses 8.2 Principal Stresses, Strain Energy & Mohr's Circle 8.3 Shear Force & Bending Moment Diagrams, Beam Bending & Shear Stresses 8.4 Torsion of Circular Shafts, Springs & Column Buckling 8.5 Thin Cylinders, Spheres & Thick-Walled Pressure Vessels 8.6 Deflection of Beams: Double Integration, Macaulay & Moment-Area 8.7 Shear Centre & Unsymmetrical Bending 8.8 Strain Gauges, Rosettes & Experimental Stress Analysis 8.9 Mechanical Testing: Universal Testing Machine, Hardness & Impact
9 Chapter 9: Paper-II Theory of Machines & Mechanical Vibrations
9.1 Simple Mechanisms, Kinematic Inversions & Velocity/Acceleration Diagrams 9.2 Cams & Followers, Toothed Gearing & Epicyclic Gear Trains 9.3 Flywheels, Centrifugal/Inertia Governors & Rotor Balancing 9.4 Free, Damped & Forced Single-Degree-of-Freedom Vibrations 9.5 Gyroscopic Couple & Gyroscopic Effects
10 Chapter 10: Paper-II Machine Design & Failure Theories
10.1 Static Failure Theories & Variable/Fatigue Loading 10.2 Design of Threaded Fasteners, Welded & Riveted Joints 10.3 Design of Shafts, Keys, Couplings & Rolling/Sliding Bearings 10.4 Design of Spur, Helical, Bevel & Worm Gears 10.5 Design of Helical, Leaf & Torsion Springs 10.6 Design of Brakes & Clutches: Energy, Lining Pressure & Heat
11 Chapter 11: Paper-II Fluid Mechanics & Hydraulic Machinery
11.1 Fluid Properties, Hydrostatic Forces & Buoyancy 11.2 Fluid Kinematics, Continuity & Bernoulli's Equation 11.3 Viscous Flow in Pipes, Boundary Layer & Minor Losses 11.4 Hydraulic Turbines, Centrifugal & Reciprocating Pumps 11.5 Dimensional Analysis, Similitude & Model Testing 11.6 Control-Volume Analysis: Continuity, Momentum & Energy
12 Chapter 12: Paper-II Thermodynamics, Thermal Cycles & Turbomachinery
12.1 Fundamental Concepts, First & Second Laws of Thermodynamics 12.2 Entropy, Availability, Exergy & Properties of Pure Substances 12.3 Air-Standard Gas Power Cycles: Otto, Diesel, Dual & Brayton 12.4 Vapour Power Cycles: Ideal, Reheat & Regenerative Rankine Cycles 12.5 Thermodynamic Relations: Maxwell, Clausius-Clapeyron & Joule-Thomson 12.6 Behaviour of Ideal & Real Gases and Equations of State 12.7 Air & Gas Compressors: Reciprocating, Rotary & Multi-Stage 12.8 Steam & Gas Turbines: Impulse, Reaction & Velocity Diagrams
13 Chapter 13: Paper-II Heat Transfer, Refrigeration & Air Conditioning
13.1 Steady & Unsteady Conduction, Extended Surfaces (Fins) 13.2 Forced/Natural Convection, Radiation & Heat Exchanger LMTD/NTU 13.3 Vapour Compression & Vapour Absorption Refrigeration Systems 13.4 Psychrometric Properties, Processes & Air Conditioning Systems 13.5 Gas Refrigeration, Heat Pump Cycles & Cryogenics
14 Chapter 14: Paper-II Materials Science, Metallurgy & Manufacturing Technology
14.1 Crystal Structures, Phase Diagrams & Iron-Iron Carbide Equilibrium 14.2 Heat Treatment Processes & Engineering Alloy Steels 14.3 Casting Processes, Metal Forming & Welding Metallurgy 14.4 Metal Cutting Mechanics, Tool Life & Machine Tools 14.5 Plastic Deformation, Yield Criteria & Load Estimation in Bulk Forming 14.6 Sheet Metal Forming: Shearing, Bending & Deep Drawing 14.7 Powder Metallurgy 14.8 Brazing, Soldering & Adhesive Bonding 14.9 Non-Traditional Machining: EDM, ECM, USM, AJM, LBM & EBM 14.10 Abrasive Machining, Grinding & Superfinishing 14.11 Principles of Work Holding, Jigs & Fixtures 14.12 Economics of Machining & Tool Life Optimisation
15 Chapter 15: Paper-II Metrology, Quality Control & Industrial Engineering / OR
15.1 Limits, Fits, Tolerances, Gauges & Surface Metrology 15.2 Production Planning, Forecasting & Inventory Control Models 15.3 Operations Research: Linear Programming & Transportation/Assignment 15.4 Project Management: CPM, PERT, Network Analysis & Crashing 15.5 Comparators & Interferometry 15.6 Coordinate Measuring Machines & Machine Tool Alignment Testing 15.7 Computer Integrated Manufacturing: CAD/CAM & Integration Tools 15.8 NC/CNC Machines & CNC Part Programming 15.9 Material Requirements Planning, Scheduling & Sequencing 15.10 Queuing Theory & Simple Queuing Models 15.11 Network Flow Models: Shortest Route, Maximal Flow & Spanning Tree
15.2 Production Planning, Forecasting & Inventory Control Models
Key Takeaways Explain This Topic AI
Exponential smoothing updates demand forecasts using F_t = F_{t-1} + alpha*(A_{t-1} - F_{t-1}), where alpha is equivalent to 2/(N + 1) in moving averages
Tracking signal is RSFE / MAD, maintaining a healthy process when bounded within +/- 3 to +/- 4
The classical EOQ balances annual ordering and holding costs to yield EOQ = sqrt(2 D Co / Ch), with minimum total inventory cost TIC* = sqrt(2 D Co*Ch)
The EPQ/EBQ model accounts for simultaneous production and consumption at rate p > d, scaling the batch size by sqrt(p / (p - d))
Selective inventory control pairs Pareto ABC analysis (monetary value 70-20-10) with VED (vitality) and FSN (movement velocity) for optimal spare parts warehousing
Last updated: August 2026
Production Planning, Forecasting & Inventory Control Models
In high-capital mining operations like Coal India Limited—where millions of tonnes of coal are extracted using fleets of heavy earth-moving machinery (HEMM), dumpers, draglines, and conveyor belts—effective production planning and inventory control ensure continuous equipment uptime while preventing excessive working capital lockup.
1. Demand Forecasting Models
Forecasting predicts future demand based on historical patterns, trends, and seasonal variations.
Time-Series Forecasting Formulations
Simple Moving Average ( n n n -period): F t = A t − 1 + A t − 2 + ⋯ + A t − n n = 1 n ∑ i = 1 n A t − i F_t = \frac{A_{t-1} + A_{t-2} + \dots + A_{t-n}}{n} = \frac{1}{n}\sum_{i=1}^n A_{t-i} F t = n A t − 1 + A t − 2 + ⋯ + A t − n = n 1 i = 1 ∑ n A t − i
Characteristics: All past n n n periods carry equal weight 1 / n 1/n 1/ n . Increasing n n n smooths out random fluctuations but slows response to real trend shifts.
Weighted Moving Average: F t = w 1 A t − 1 + w 2 A t − 2 + ⋯ + w n A t − n = ∑ i = 1 n w i A t − i F_t = w_1 A_{t-1} + w_2 A_{t-2} + \dots + w_n A_{t-n} = \sum_{i=1}^n w_i A_{t-i} F t = w 1 A t − 1 + w 2 A t − 2 + ⋯ + w n A t − n = i = 1 ∑ n w i A t − i
where ∑ i = 1 n w i = 1 \sum_{i=1}^n w_i = 1 ∑ i = 1 n w i = 1 and higher weights are assigned to more recent periods ( w 1 > w 2 > ⋯ > w n w_1 > w_2 > \dots > w_n w 1 > w 2 > ⋯ > w n ).
Simple Exponential Smoothing: F t = F t − 1 + α ( A t − 1 − F t − 1 ) = α A t − 1 + ( 1 − α ) F t − 1 F_t = F_{t-1} + \alpha(A_{t-1} - F_{t-1}) = \alpha A_{t-1} + (1 - \alpha)F_{t-1} F t = F t − 1 + α ( A t − 1 − F t − 1 ) = α A t − 1 + ( 1 − α ) F t − 1
where:
- F t F_t F t = Forecast for current period t t t
- F t − 1 F_{t-1} F t − 1 = Forecast for previous period t − 1 t-1 t − 1
- A t − 1 A_{t-1} A t − 1 = Actual demand in previous period t − 1 t-1 t − 1
- α \alpha α = Smoothing constant ( 0 ≤ α ≤ 1 0 \le \alpha \le 1 0 ≤ α ≤ 1 )
Equivalent Moving Average Relationship: α = 2 N + 1 ⟺ N = 2 − α α \alpha = \frac{2}{N + 1} \iff N = \frac{2 - \alpha}{\alpha} α = N + 1 2 ⟺ N = α 2 − α
A high α \alpha α (e.g., 0.7 − 0.9 0.7 - 0.9 0.7 − 0.9 ) makes the forecast highly responsive to recent demand changes.
A low α \alpha α (e.g., 0.1 − 0.3 0.1 - 0.3 0.1 − 0.3 ) provides high stability and dampens noise.
Forecast Error Metrics
Let forecast error for period t t t be e t = A t − F t e_t = A_t - F_t e t = A t − F t .
Error Metric Mathematical Formula Purpose & Sensitivity
Mean Absolute Deviation (MAD) MAD = 1 n ∑ t = 1 n ∣ A t − F t ∣ \text{MAD} = \frac{1}{n}\sum_{t=1}^n \vert A_t - F_t\vert MAD = n 1 ∑ t = 1 n ∣ A t − F t ∣ Measures average magnitude of error in original units. For normal error distribution, σ ≈ 1.25 × MAD \sigma \approx 1.25 \times \text{MAD} σ ≈ 1.25 × MAD .
Mean Squared Error (MSE) MSE = 1 n ∑ t = 1 n ( A t − F t ) 2 \text{MSE} = \frac{1}{n}\sum_{t=1}^n (A_t - F_t)^2 MSE = n 1 ∑ t = 1 n ( A t − F t ) 2 Heavily penalizes large outlier errors; tracks error variance.
Mean Absolute Percentage Error (MAPE) MAPE = 1 n ∑ t = 1 n ∣ A t − F t A t ∣ × 100 % \text{MAPE} = \frac{1}{n}\sum_{t=1}^n \left\vert\frac{A_t - F_t}{A_t}\right\vert\times 100\% MAPE = n 1 ∑ t = 1 n A t A t − F t × 100% Scale-independent percentage metric for comparing across different product lines.
Tracking Signal (TS) TS = RSFE MAD = ∑ t = 1 n ( A t − F t ) MAD \text{TS} = \frac{\text{RSFE}}{\text{MAD}} = \frac{\sum_{t=1}^n (A_t - F_t)}{\text{MAD}} TS = MAD RSFE = MAD ∑ t = 1 n ( A t − F t ) Monitors systematic bias. A well-controlled forecast stays within [ − 4 , + 4 ] [-4, +4] [ − 4 , + 4 ] or [ − 3 , + 3 ] [-3, +3] [ − 3 , + 3 ] .
- 2. Production Planning Hierarchy and Aggregate Planning AGGREGATE PRODUCTION PLAN (6 - 18 months)
- |
- v
- MASTER PRODUCTION SCHEDULE (MPS, Weeks/Months)
- |
- v
- MATERIAL REQUIREMENTS PLANNING (MRP-I)
- (Explodes Bill of Materials & Inventory Status)
- |
- v
- MANUFACTURING RESOURCE PLANNING (MRP-II)
- (Integrates Capacity, Tooling, Finance, Labor)
- |
- v
- ENTERPRISE RESOURCE PLANNING (ERP)
- Aggregate Planning Strategies
Chase Demand Strategy: Match production capacity dynamically to demand in each period by adjusting workforce levels (hiring, firing, overtime, subcontracting). Minimizes inventory holding costs but incurs substantial hiring/firing and workforce instability costs.
Level Capacity Strategy: Maintain a constant production output rate and steady workforce. Fluctuations in demand are absorbed by accumulating finished goods inventory during low-demand periods and utilizing backorders/stockouts during peak periods. Ideal for capital-intensive, automated processes.
Mixed (Hybrid) Strategy: Combines level baseline production with controlled overtime, temporary workforce shifts, or subcontracting during peak demand.
- 3. Deterministic Inventory Control Models
- 1. Classical Economic Order Quantity (EOQ / Wilson-Harris Model)
Assumptions:
Annual demand D D D is constant, continuous, and known with certainty.
Order quantity Q Q Q arrives instantaneously in a single batch (replenishment rate is infinite).
Lead time is zero or constant.
Unit purchase cost C C C , ordering cost C o C_o C o (per order), and holding cost C h C_h C h (per unit per year) are constant.
- Shortages/stockouts are strictly prohibited. Inventory ^
- Level |
- Q | /| /| /|
- | / | / | / |
- Q/2 |/--|------/--|------/--|---- Average Inventory = Q/2
- | | / | / |
- 0 +---+-----+---+-----+---+-----> Time
- |< T >|
Cost Equations: Annual Purchase Cost = D ⋅ C \text{Annual Purchase Cost} = D \cdot C Annual Purchase Cost = D ⋅ C Annual Ordering Cost = ( D Q ) C o \text{Annual Ordering Cost} = \left(\frac{D}{Q}\right) C_o Annual Ordering Cost = ( Q D ) C o Annual Carrying/Holding Cost = ( Q 2 ) C h \text{Annual Carrying/Holding Cost} = \left(\frac{Q}{2}\right) C_h Annual Carrying/Holding Cost = ( 2 Q ) C h Total Inventory Cost (TIC) = ( D Q ) C o + ( Q 2 ) C h \text{Total Inventory Cost (TIC)} = \left(\frac{D}{Q}\right) C_o + \left(\frac{Q}{2}\right) C_h Total Inventory Cost (TIC) = ( Q D ) C o + ( 2 Q ) C h
Equating Annual Ordering Cost to Annual Carrying Cost: D Q C o = Q 2 C h ⟹ Q ∗ 2 = 2 D C o C h \frac{D}{Q} C_o = \frac{Q}{2} C_h \implies Q^{*2} = \frac{2 D C_o}{C_h} Q D C o = 2 Q C h ⟹ Q ∗ 2 = C h 2 D C o Q ∗ = EOQ = 2 D C o C h \mathbf{Q^* = \text{EOQ} = \sqrt{\frac{2 D C_o}{C_h}}} Q ∗ = EOQ = C h 2D C o
Key Optimal Metrics:
Minimum Total Inventory Cost: TIC ∗ = 2 D C o C h \text{TIC}^* = \sqrt{2 D C_o C_h} TIC ∗ = 2 D C o C h
Optimal Order Frequency: N ∗ = D Q ∗ = D C h 2 C o N^* = \frac{D}{Q^*} = \sqrt{\frac{D C_h}{2 C_o}} N ∗ = Q ∗ D = 2 C o D C h
Optimal Order Cycle Time: T ∗ = Q ∗ D = 2 C o D C h T^* = \frac{Q^*}{D} = \sqrt{\frac{2 C_o}{D C_h}} T ∗ = D Q ∗ = D C h 2 C o
Sensitivity of EOQ to Parameter Estimation Errors
If an order quantity Q = k Q ∗ Q = k Q^* Q = k Q ∗ is selected instead of the optimal Q ∗ Q^* Q ∗ (where k > 0 k > 0 k > 0 is an estimation factor): TIC ( Q ) TIC ∗ = 1 2 ( k + 1 k ) \frac{\text{TIC}(Q)}{\text{TIC}^*} = \frac{1}{2}\left(k + \frac{1}{k}\right) TIC ∗ TIC ( Q ) = 2 1 ( k + k 1 )
Example: If Q = 2 Q ∗ Q = 2 Q^* Q = 2 Q ∗ ( k = 2 k = 2 k = 2 ), TIC = 1 2 ( 2 + 0.5 ) TIC ∗ = 1.25 TIC ∗ \text{TIC} = \frac{1}{2}(2 + 0.5)\text{TIC}^* = 1.25\,\text{TIC}^* TIC = 2 1 ( 2 + 0.5 ) TIC ∗ = 1.25 TIC ∗ (only a 25 % 25\% 25% cost penalty for a 100 % 100\% 100% order quantity error, illustrating that the total cost curve is relatively flat around the minimum).
2. Economic Production Quantity / Batch Quantity (EPQ / EBQ)
Used when the manufacturing unit produces components internally at a finite production rate p p p while demand consumes them at rate d d d ( p > d p > d p > d ). Inventory ^
- Level | /\ /\
- Imax | / \ / \
- | /| \ /| \
- | / | \ / | \
- | / | \ / | \
- 0 +---+---+------+-----+---+------+----> Time
- |tp | td |
- Production cycle time: t p = Q / p t_p = Q / p t p = Q / p
Maximum inventory accumulated: I max = t p ( p − d ) = Q ( 1 − d p ) I_{\max} = t_p(p - d) = Q\left(1 - \frac{d}{p}\right) I m a x = t p ( p − d ) = Q ( 1 − p d )
Average inventory: I avg = I max 2 = Q 2 ( 1 − d p ) I_{\text{avg}} = \frac{I_{\max}}{2} = \frac{Q}{2}\left(1 - \frac{d}{p}\right) I avg = 2 I m a x = 2 Q ( 1 − p d ) Total Cost = ( D Q ) C s + Q 2 ( 1 − d p ) C h \text{Total Cost} = \left(\frac{D}{Q}\right) C_s + \frac{Q}{2}\left(1 - \frac{d}{p}\right) C_h Total Cost = ( Q D ) C s + 2 Q ( 1 − p d ) C h Q EPQ ∗ = 2 D C s C h ( 1 − d p ) = 2 D C s C h p p − d \mathbf{Q^*_{\text{EPQ}} = \sqrt{\frac{2 D C_s}{C_h \left(1 - \frac{d}{p}\right)}} = \sqrt{\frac{2 D C_s}{C_h}}\sqrt{\frac{p}{p - d}}} Q EPQ ∗ = C h ( 1 − p d ) 2D C s = C h 2D C s p − d p
(where C s C_s C s is the setup cost per production run) .
3. Inventory Model with Planned Shortages (Backorders Permitted)
When stockouts are allowed at a backordering cost C b C_b C b (per unit short per year): Q ∗ = 2 D C o C h ⋅ ( C h + C b C b ) \mathbf{Q^* = \sqrt{\frac{2 D C_o}{C_h} \cdot \left(\frac{C_h + C_b}{C_b}\right)}} Q ∗ = C h 2D C o ⋅ ( C b C h + C b ) I max ∗ = Q ∗ ( C b C h + C b ) = 2 D C o C h ⋅ ( C b C h + C b ) \mathbf{I_{\max}^* = Q^* \left(\frac{C_b}{C_h + C_b}\right) = \sqrt{\frac{2 D C_o}{C_h} \cdot \left(\frac{C_b}{C_h + C_b}\right)}} I m a x ∗ = Q ∗ ( C h + C b C b ) = C h 2D C o ⋅ ( C h + C b C b ) Maximum Backorder Level S ∗ = Q ∗ − I max ∗ = Q ∗ ( C h C h + C b ) \text{Maximum Backorder Level } S^* = Q^* - I_{\max}^* = Q^*\left(\frac{C_h}{C_h + C_b}\right) Maximum Backorder Level S ∗ = Q ∗ − I m a x ∗ = Q ∗ ( C h + C b C h ) Minimum Total Cost TIC ∗ = 2 D C o C h ( C b C h + C b ) \text{Minimum Total Cost } \text{TIC}^* = \sqrt{2 D C_o C_h \left(\frac{C_b}{C_h + C_b}\right)} Minimum Total Cost TIC ∗ = 2 D C o C h ( C h + C b C b )
Since C h + C b C b > 1 \frac{C_h + C_b}{C_b} > 1 C b C h + C b > 1 , permitting shortages increases optimal batch size Q ∗ Q^* Q ∗ while reducing maximum on-hand inventory and total inventory cost.
4. Reorder Level (ROL) and Safety Stock Under Uncertainty
When lead time demand is uncertain, a safety stock buffer is maintained to prevent stockouts at a specified service level Z α Z_{\alpha} Z α . Inventory ^
- Level |
- | /\ /\
- ROL |--/--\------/--\------------------ Reorder Level (ROL)
- | / \ / \
- SS |/------\--/------\---------------- Safety Stock (SS)
- | \/ \
- 0 +-------------------------> Time
- |< LT >|
Formulations ROL = Expected Demand During Lead Time + Safety Stock (SS) \mathbf{\text{ROL} = \text{Expected Demand During Lead Time} + \text{Safety Stock (SS)}} ROL = Expected Demand During Lead Time + Safety Stock (SS)
Variable Demand ( d ∼ N ( d ˉ , σ d 2 ) d \sim \mathcal{N}(\bar{d}, \sigma_d^2) d ∼ N ( d ˉ , σ d 2 ) ) and Constant Lead Time ( L T LT L T ): σ D L = σ d L T \sigma_{DL} = \sigma_d \sqrt{LT} σ D L = σ d L T SS = Z α ⋅ σ d L T \text{SS} = Z_{\alpha} \cdot \sigma_d \sqrt{LT} SS = Z α ⋅ σ d L T ROL = d ˉ ⋅ L T + Z α ⋅ σ d L T \text{ROL} = \bar{d} \cdot LT + Z_{\alpha} \cdot \sigma_d \sqrt{LT} ROL = d ˉ ⋅ L T + Z α ⋅ σ d L T
Constant Daily Demand ( d ˉ \bar{d} d ˉ ) and Variable Lead Time ( L T ∼ N ( L T ˉ , σ L T 2 ) LT \sim \mathcal{N}(\bar{LT}, \sigma_{LT}^2) L T ∼ N ( L T ˉ , σ L T 2 ) ): SS = Z α ⋅ d ˉ ⋅ σ L T \text{SS} = Z_{\alpha} \cdot \bar{d} \cdot \sigma_{LT} SS = Z α ⋅ d ˉ ⋅ σ L T ROL = d ˉ ⋅ L T ˉ + Z α ⋅ d ˉ ⋅ σ L T \text{ROL} = \bar{d} \cdot \bar{LT} + Z_{\alpha} \cdot \bar{d} \cdot \sigma_{LT} ROL = d ˉ ⋅ L T ˉ + Z α ⋅ d ˉ ⋅ σ L T
Both Demand and Lead Time are Independent Random Variables: σ D L = L T ˉ ⋅ σ d 2 + d ˉ 2 ⋅ σ L T 2 \sigma_{DL} = \sqrt{\bar{LT}\cdot\sigma_d^2 + \bar{d}^2\cdot\sigma_{LT}^2} σ D L = L T ˉ ⋅ σ d 2 + d ˉ 2 ⋅ σ L T 2 SS = Z α ⋅ L T ˉ ⋅ σ d 2 + d ˉ 2 ⋅ σ L T 2 \text{SS} = Z_{\alpha} \cdot \sqrt{\bar{LT}\cdot\sigma_d^2 + \bar{d}^2\cdot\sigma_{LT}^2} SS = Z α ⋅ L T ˉ ⋅ σ d 2 + d ˉ 2 ⋅ σ L T 2
5. Selective Inventory Control Techniques
In mining stores containing tens of thousands of spare parts (from O-rings to diesel engines), selective control allocates managerial attention based on specific operational and financial criteria.
Technique Basis of Classification Categories & Industrial Policy
ABC Analysis Annual Monetary Consumption Value (Pareto's Law) A items: ∼ 10 % \sim 10\% ∼ 10% items, ∼ 70 % \sim 70\% ∼ 70% value (Strict control, low safety stock, frequent ordering).; B items: ∼ 20 % \sim 20\% ∼ 20% items, ∼ 20 % \sim 20\% ∼ 20% value (Moderate control).; C items: ∼ 70 % \sim 70\% ∼ 70% items, ∼ 10 % \sim 10\% ∼ 10% value (Loose control, bulk orders, high safety stock).
VED Analysis Criticality to Production Breakdown V (Vital): Immediate production shutdown if unavailable (high safety stock).; E (Essential): Serious loss of efficiency within hours.; D (Desirable): Minor inconvenience, no production stoppage.
FSN Analysis Inventory Movement Velocity / Consumption Rate F (Fast-moving): High turnover, frequent replenishment.; S (Slow-moving): Moderate consumption, regular review.; N (Non-moving): Zero consumption over 12+ months; candidates for disposal.
SDE Analysis Procurement Lead Time & Market Scarcity S (Scarce): Imported or monopoly supply (high safety stock).; D (Difficult): Long lead time from domestic suppliers.; E (Easy): Readily available local market stock.
HML Analysis Unit Purchase Price H (High price), M (Medium price), L (Low price): Dictates purchasing authority levels.
GOLF Analysis Supply Source Nature G (Government), O (Open market), L (Local), F (Foreign/Import).