Study guide

2.1 Piping Protection, Corrosion, Freezing & Sleeving

Indiana Journeyman Plumber Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Exam Orientation & Trade Mathematics

1.1 Exam Format, Prov Testing Policies & Code References 1.2 Navigating the 2006 IPC & 2012 Indiana Amendments 1.3 Trade Math: Slopes, Head Pressure, Volumes & Fitting Allowances

2 Chapter 2: General Regulations, Structural Safety & Supports

2.1 Piping Protection, Corrosion, Freezing & Sleeving 2.2 Structural Safety: Cutting, Notching & Boring in Joists and Studs 2.3 Pipe Hangers, Brackets, Anchoring & Support Spacing

3 Chapter 3: Plumbing Fixtures, Faucets & Accessibility

3.1 Minimum Plumbing Facilities & Fixture Count Sizing 3.2 Water Closets, Urinals & Flushometer Sizing 3.3 Lavatories, Showers, Bathtubs & Scald Prevention (ASSE 1016/1017)

4 Chapter 4: Traps, Interceptors & Indirect Waste

4.1 Trap Design, Liquid Seal Protection, Primers & Prohibited Traps 4.2 Grease Interceptors, Oil Separators & Sand Traps 4.3 Indirect Waste, Air Gaps, Air Breaks & Food Preparation Waste

5 Chapter 5: Sanitary Drainage: Sizing, Slopes & Materials

5.1 Drainage Fixture Units (DFU) & Horizontal Branch Sizing 5.2 Building Drain & Building Sewer Sizing, Slopes & Velocities 5.3 Drainage Pipe Materials, Solvent Cementing & Mechanical Joints

6 Chapter 6: Sanitary Drainage: Cleanouts, Sumps & Testing

6.1 Cleanout Locations, Sizing, Clearances & Accessibility 6.2 Drainage Sumps, Sewage Ejectors & Backwater Valves 6.3 Drainage System Inspection & Testing (Water, Air & Smoke)

7 Chapter 7: Vents: Principles, Stacks & Terminals

7.1 DWV Venting Principles, Hydraulic Gradients & Trap Protection 7.2 Individual, Common & Relief Vents 7.3 Vent Terminals, Roof Extensions & Frost Closure (IPC Section 904) 7.4 Vent Stacks, Stack Vents, Vent Headers & Waste Stack Vents

8 Chapter 8: Vents: Advanced Systems & Special Venting

8.1 Horizontal & Vertical Wet Venting Systems 8.2 Circuit Venting & Loop Venting Systems 8.3 Combination Waste and Vent Systems & Island Fixture Venting 8.4 Air Admittance Valves (AAVs) & Installation Limits 8.5 Vent Pipe Sizing: Table 916.1, Section 916.2 & Developed Length

9 Chapter 9: Water Supply: Sizing, Distribution & Materials

9.1 Water Service Sizing, Street Pressure & Pressure Regulators 9.2 Water Supply Fixture Units (WSFU) & Pipe Sizing Tables 9.3 Water Distribution Materials, Copper Joining & PEX Systems 9.4 Water Hammer Arrestors & Thermal Expansion Control

10 Chapter 10: Backflow Prevention & Cross-Connection Control

10.1 Cross-Connection Hazards, Backpressure & Backsiphonage 10.2 Backflow Prevention Assemblies: RPZ, DCVA, PVB & Vacuum Breakers 10.3 Containment vs. Isolation, Installation Clearances & Testing

11 Chapter 11: Water Heaters: Sizing, Combustion & Safety

11.1 Water Heater Sizing, Clearances, Drain Pans & Elevation in Garages 11.2 Temperature and Pressure (T&P) Relief Valves & Discharge Piping 11.3 Combustion Air, Draft Hoods & Venting of Fuel-Fired Water Heaters

12 Chapter 12: Storm Drainage Systems & Roof Drainage

12.1 Indiana Rainfall Rates, Projected Roof Area & Roof Drain Sizing 12.2 Vertical Conductors, Downspouts & Horizontal Storm Drains 12.3 Subsoil Drains, Sump Pumps & Secondary Emergency Overflows

13 Chapter 13: Developed Length, Isometric Analysis & Offset Math

13.1 Reading Plumbing Blueprints, Symbols & DWV Riser Diagrams 13.2 Isometric Drawing Interpretation & Three-Dimensional Layouts 13.3 Developed Length Calculations, 45-Degree Offsets & Rolling Offsets

14 Chapter 14: Indiana Plumbing Laws, Rules, Code Amendments & Business

14.1 Indiana Plumbing Commission (IC 25-28.5) & Licensing Standards 14.2 Key Indiana Amendments to the 2006 IPC (675 IAC 16-1.4) 14.3 Plumbing Permits, Local Administrative Rules & Inspections 14.4 Plumbing Business, OSHA Safety & Project Management Fundamentals

2.1 Piping Protection, Corrosion, Freezing & Sleeving

Key Takeaways Explain This Topic AI

Trench bottoms must provide continuous, uniform bearing along the pipe barrel, with bell holes excavated at joints and a minimum 3-inch clean granular bed where rock or rubble is encountered.

Indiana deleted the model code's 'six inches below the frost line' sentence from Section 305.6 and replaced it with Section 305.6.2 and Table 305.6.2, a county-by-county bury depth of 36, 42 or 48 inches measured from finished grade to the top of the water pipe.

Piping penetrating exterior foundation walls or footings must pass through a protective pipe sleeve sized two pipe sizes larger than the carrier pipe or beneath an engineered relieving arch.

Metallic piping embedded in concrete, masonry, or corrosive soils must be shielded with an approved poly wrap or 50% overlapped 10-mil tape, and dissimilar metals must be isolated with dielectric unions.

Indiana amended Section 305.8 so the protective shield plate is 0.0575 inch thick (No. 16 gage) steel rather than the model code's 0.062 inch, covering the bored or notched area and extending at least 2 inches above sole plates and below top plates.

Last updated: September 2026

2.1 Piping Protection, Corrosion, Freezing & Sleeving

Quick Answer: Under IPC Chapter 3 and the Indiana Plumbing Code (675 IAC 16-1.4), plumbing systems must be actively protected against physical damage, structural settlement, freezing, and electrochemical corrosion. Trenches require continuous uniform bearing with a minimum 3-inch granular bedding when rock is encountered, followed by compacted, debris-free backfill in 6-inch lifts up to 12 inches over the pipe. In Indiana, exterior water supply piping is buried to the county depth in Table 305.6.2 (36, 42 or 48 inches to the top of the pipe) rather than to a frost-line offset. Foundation wall penetrations require a sleeve two pipe sizes larger than the pipe or a relieving arch. Metallic pipes passing through concrete or corrosive soil must be wrapped, dissimilar metals must be isolated with dielectric fittings, and framing penetrations within 1.5 inches of a stud edge require a 0.0575-inch-thick (No. 16 gage) steel shield plate extending at least 2 inches above sole plates and below top plates.

Regulatory Framework: IPC Chapter 3 & Indiana Amendments

Plumbing installations must withstand environmental forces, mechanical stresses, and structural interactions throughout the lifecycle of a building. The International Plumbing Code (IPC) Chapter 3 establishes fundamental administrative and physical mandates for all piping assemblies, fixtures, and appurtenances. In Indiana, the Indiana Plumbing Code (codified under 675 IAC 16-1.4 , adopting and amending the IPC) enforces specific amendments that account for the state's severe continental winters, varied glacial soil profiles, and local construction methods.

A journeyman plumber must not treat pipe installation in isolation from the surrounding building envelope. A properly sized drainage or water supply run can fail catastrophically if thermal contraction shears an un-sleeved penetration, if aggressive soil chemistry corrodes copper tubing, or if an errant drywall screw punctures an unshielded plastic stack. The regulations outlined in IPC Section 305 (Protection of Pipes) and Section 306 (Trenching, Excavation, and Backfill) represent non-negotiable minimum safety baselines.

Trenching, Excavation, Bedding & Backfilling (IPC 306)

Underground piping requires meticulous ground preparation to avoid uneven settling, shear cracking, and joint separation. The code dictates three distinct phases for underground installations: trench bottom excavation, pipe bedding, and backfilling. +-------------------------------------------------------------------+

  • | FINISHED GRADE SURFACE |
  • +-------------------------------------------------------------------+
  • | |
  • | FINAL BACKFILL: Compacted site material, free of massive |
  • | debris and boulders (placed in maximum 12-inch lifts). |
  • | |
  • +-------------------------------------------------------------------+
  • | INITIAL BACKFILL ZONE (Minimum 12" above top of pipe barrel): |
  • | Clean earth, sand, or granular material free of rocks > 1.5", |
  • | frozen clods, slag, or construction refuse. Placed in 6" lifts. |
  • +-------------------------------------------------------------------+
  • | [ CARRIER PIPE BARREL ] |
  • | (Bell holes under couplings) |
  • +-------------------------------------------------------------------+
  • | BEDDING LAYER: Minimum 3" tamped pea gravel or sand when |
  • | excavated into solid rock, hardpan, or frozen ground. |
  • +-------------------------------------------------------------------+
  • | UNDISTURBED EARTH OR EXCAVATED TRENCH SUBGRADE |
  • +-------------------------------------------------------------------+
  • Trench Bottom Preparation and Uniform Bearing

Trenches must be excavated along the design slope of the piping. The bottom of the trench must provide a firm, continuous, and completely uniform bearing surface throughout the entire length of the pipe barrel. Piping cannot be supported on intermittent mounded earth, timber blocking, or bricks, as point loading inevitably causes beam failure or bell distortion.

At every joint, fitting, and coupling, plumbers must excavate bell holes (depressions in the trench bottom). These bell holes ensure that the full weight of the pipe and its liquid contents rests solely along the horizontal barrel rather than bearing down upon the joint socket or mechanical coupling band.

Excavation in Rock and Unstable Soils

Where the trench bottom encounters rock, shale, boulders, hardpan, or masonry debris:

The trench must be over-excavated to a minimum depth of 3 inches (76 mm) below the bottom of the pipe.

The over-excavated depth must be backfilled and tamped with clean, granular bedding material, such as washed pea gravel, crushed stone (maximum 3/8-inch aggregate), or coarse sand.

This continuous cushion prevents sharp rock outcroppings from fracturing the pipe barrel during compaction or thermal cycling.

If unstable, organic, or mucky soil is encountered, the soft material must be removed and replaced with compacted structural fill or stabilized with engineered geotextile fabric to prevent differential settlement.

Backfilling Protocols and Compaction Lifts

Backfilling must be conducted in two distinct stages to protect the pipe integrity:

Initial Backfill (Bedding to 12 Inches Above Pipe Crown): Backfill material placed directly beside and over the pipe must consist of clean earth, sand, or fine granular material entirely free of rocks larger than 1.5 inches in diameter, frozen earth clumps, concrete rubble, asphalt chunks, or corrosive cinders. This initial fill must be placed in loose layers not exceeding 6 inches (152 mm) in depth and uniformly compacted on both sides of the pipe (haunching) to prevent lateral displacement.

Final Backfill (Above 12 Inches to Grade): Once the pipe barrel has at least 12 inches (305 mm) of compacted clean cover, general site material may be used for the remainder of the trench. Rocks larger than 3 inches in diameter, heavy boulders, and large clay clods must still be excluded, and backfill should proceed in compacted lifts of 12 inches to prevent surface subsidence.

Freezing Protection & Indiana Frost Depths (IPC 305.6)

Water expands by approximately 9% upon freezing, generating hydrostatic pressures in excess of 40,000 psi—far beyond the burst rating of any common plumbing pipe material. IPC Section 305.6 requires all water and drainage systems subject to freezing temperatures to be physically protected.

Indiana Bury Depth: Section 305.6.2 and Table 305.6.2

This is the single most Indiana-specific item in Chapter 3, and it is a pure lookup. 675 IAC 16-1.4-4 adds Section 305.6.2 , which reads: "The minimum depth of exterior water supply piping measured from finished grade to the top of the water pipe shall be in accordance with Table 305.6.2." Table 305.6.2 then lists all 92 Indiana counties with a required depth of 36, 42 or 48 inches .

There is no "bury it six inches below the frost line" rule in the Indiana Plumbing Code. If the exam gives you a county, you look the county up in Table 305.6.2 and read the number. Tab that table.

Depth Required Where It Applies Representative Counties

48 inches The northern tier and a band of north-central counties Allen (Fort Wayne), Lake, Porter, St. Joseph (South Bend), LaPorte, Elkhart, Kosciusko, LaGrange, Steuben, Noble, DeKalb, Adams, Wells, Wabash, Miami, Cass, Carroll, Benton, Jasper, Newton, Pulaski, Starke, Fulton, White, Whitley, Marshall, Huntington

42 inches The central band Marion (Indianapolis), Hamilton, Hancock, Boone, Hendricks, Johnson, Morgan, Delaware, Madison, Howard, Grant, Tipton, Clinton, Montgomery, Tippecanoe (Lafayette), Blackford, Jay, Randolph, Wayne, Fayette, Union, Henry, Rush, Shelby, Parke, Putnam, Vermillion, Warren, Harrison

36 inches The southern tier Vanderburgh (Evansville), Monroe (Bloomington), Floyd (New Albany), Clark, Vigo (Terre Haute), Bartholomew, Brown, Jackson, Jefferson, Jennings, Knox, Lawrence, Martin, Daviess, Dubois, Perry, Pike, Posey, Gibson, Greene, Orange, Owen, Ohio, Ripley, Scott, Spencer, Sullivan, Switzerland, Warrick, Washington, Clay, Crawford, Dearborn, Decatur, Fountain, Franklin

Exam Key Point: Two numbers to keep straight. Table 305.6.2 governs exterior water supply piping bury depth by county. The soil and waste freezing rule is Section 305.6 , which is a performance rule — such pipes may not be run outside the building, in attics or crawl spaces, or anywhere subject to freezing temperatures unless adequate provision is made to protect them by insulation or heat or both. Indiana amended 305.6 by deleting the word "water" from the first sentence, precisely because waterlines are now handled separately in 305.6.1 and 305.6.2.

Indiana Section 305.6.1: Waterlines

Indiana deleted the model text of 305.6.1 and inserted its own: "Waterlines shall not be installed outside of a building, in attics or crawlspaces, or in any other place subjected to freezing temperatures, unless adequate provision is made to protect such waterlines from freezing by insulation, ambient heat, or alternate heat source. No waterlines shall be concealed in outside walls, above grade. " That last sentence is an absolute prohibition with no insulation escape hatch — a favorite exam distractor.

Exterior Walls, Unconditioned Spaces & Crawl Spaces

Water distribution lines, trap primers, and sanitary drainage piping carrying liquid waste must never be installed in exterior wall cavities, unconditioned attics, roof overhang soffits, or vented unheated crawl spaces unless positive thermal protection is engineered:

Insulation Placement: When water piping is installed in exterior framing cavities, the piping must be located on the heated / conditioned side of the building insulation (between the insulation and the interior drywall).

Thermal Enclosure: Piping must never be sandwiched between the exterior sheathing and the insulation batts.

Unconditioned Crawl Spaces: In unheated crawl spaces, water supply lines must be wrapped with closed-cell elastomeric thermal insulation (minimum R-value specified by the energy code) or equipped with self-regulating heat tracing cable listed to IEEE 515 / UL 2043.

Frost-Proof Wall Hydrants

Exterior hose connections, sillcocks, and wall hydrants penetrating exterior walls must be of the frost-proof (anti-siphon) automatic draining type complying with ASSE 1019 . The valve seat of the frost-proof hydrant must extend into the heated interior building envelope (typically available in 8-inch, 10-inch, 12-inch, or 14-inch stem lengths). The supply pipe connecting to the sillcock must be installed with a continuous positive downward pitch toward the exterior to ensure complete gravity self-drainage when the valve is closed and the garden hose is disconnected. If a non-frost-proof valve is installed, it must be equipped with an interior stop-and-waste isolation valve located inside the heated envelope.

Pipe Passing Through Foundation Walls: Sleeves & Relieving Arches (IPC 305.5)

Differential settlement between a building's heavy concrete foundation and the surrounding backfilled earth imposes massive shear and bending loads on piping entering or exiting the structure. Furthermore, building vibration and thermal movement can abrade piping cast directly into rigid masonry. POURED CONCRETE FOUNDATION WALL

  • +-----------------------------------------+
  • | |
  • | +---------------------------------+ |
  • | | PIPE SLEEVE (Schedule 40 | |
  • | | Steel, Cast Iron, or PVC) | |
  • | | +-------------------------+ | |
  • | | | WATERPROOF SEALANT | | |
  • | | | (Bituminous/Silicone) | | |
  • | | | +-------------------+ | | |
  • | | | | CARRIER PIPE | | | |
  • | | | | (Water/Sewer) | | | |
  • | | | +-------------------+ | | |
  • | | | (Annular Space) | | |
  • | | +-------------------------+ | |
  • | | Sleeve must be TWO PIPE SIZES | |
  • | | LARGER than carrier pipe. | |
  • | +---------------------------------+ |
  • | |
  • +-----------------------------------------+
  • Pipe Sleeves

Any pipe passing through an exterior foundation wall, footing, or heavy grade beam must be protected by a pipe sleeve cast into the wall. The sleeve must comply with strict criteria:

Sleeve Sizing: The sleeve must be two pipe sizes larger than the carrier pipe passing through it. For example, a 4-inch building sewer requires a minimum 6-inch diameter sleeve; a 2-inch water service requires a minimum 3-inch diameter sleeve. This provides adequate radial clearance for building settlement.

Sleeve Material: Sleeves through masonry or concrete walls must consist of Schedule 40 steel pipe, cast iron pipe, or Schedule 40 rigid plastic pipe (PVC/ABS).

Annular Space Sealing: The void space between the exterior of the carrier pipe and the interior of the sleeve must be packed and sealed with an approved water-tight, gas-tight, and vermin-proof elastomeric sealant, mechanical modular seal (e.g., Link-Seal), or bituminous mastic. The sealant must remain flexible to accommodate structural shifts without shearing the pipe.

Relieving Arches

As an approved alternative to a pipe sleeve, the code permits the wall opening above the pipe to be bridged with an engineered masonry relieving arch or structural lintel. The relieving arch spans across the pipe opening, transferring all vertical wall and footing loads laterally to adjacent stable footings. The pipe must pass beneath the center of the arch with at least 1 inch of open clearance, completely free of any structural contact.

Corrosion Protection & Dissimilar Metals (IPC 305.1, 305.3)

Corrosion degrades piping walls from both the exterior (soil and chemical attack) and the interior (water chemistry and galvanic reactions). Plumbers must prevent both forms of degradation through proper isolation techniques.

Corrosion from Soil, Concrete & Masonry

Aggressive Soils: Soils containing cinders, ashes, industrial slag, chemical fill, or high sulfate/chloride concentrations chemically attack metallic piping. Steel, wrought iron, and copper pipes routed through such soils must be shielded by an extruded polyethylene encasement (poly-wrap), a coal-tar epoxy coating, or continuous spirally applied corrosion-resistant tape (minimum 10-mil thickness applied with a 50% overlap).

Embedment in Concrete or Masonry: Copper, brass, and steel tubing must never be embedded directly in concrete slabs, footings, or mortar joints without protective sleeving or continuous nonmetallic wrapping. Concrete contains reactive lime aggregates that, in the presence of moisture, corrode bare copper and steel. Where pipes penetrate or run within concrete floors, they must be sheathed in polyethylene tubing or closed-cell foam sleeves.

Galvanic Action Between Dissimilar Metals

When two electrochemically dissimilar metals make direct physical contact in the presence of an electrolyte (water or damp earth), an electric galvanic cell is created. Electrons migrate from the more active metal ( anode ) to the less active metal ( cathode ), causing accelerated, catastrophic pitting and wall thinning of the anode. ANODIC (Sacrificial / Corrodes) CATHODIC (Protected)

<-- [Zinc / Galvanized Steel] ---- [Malleable Iron] ---- [Brass] ---- [Copper] -->

In plumbing systems, the most common destructive galvanic pair occurs when copper tubing is threaded or coupled directly to galvanized steel or black iron pipe:

The zinc and iron act as the anode and corrode rapidly, while the copper remains cathodic.

Code Requirement (IPC 305.3): Direct joints between dissimilar metals are strictly prohibited. The connection must be made using an approved dielectric union , a dielectric coupling , a brass or bronze companion flange, or a heavy brass adapter nipple (at least 6 inches long). Dielectric unions utilize a high-density non-conductive thermoplastic gasket, an insulating sleeve around the union bolts, and an insulating washer to break electrical continuity completely.

Physical Damage Protection: Steel Shield / Nail Plates (IPC 305.8)

When piping traverses wood or light-gauge cold-formed steel framing members, it is exposed to penetration from drywall screws, trim nails, and cabinet mounting lag bolts. WOOD STUD (Top View - Looking Down)

  • +-------------------------------------------------------+
  • | |
  • | [ X ] NAIL PLATE (1/16" thick steel plate on stud) |
  • | +-------------------------------------------------+ |
  • | | < 1.5" | | |
  • | | Edge | ( BORED HOLE WITH CARRIER PIPE ) | |
  • | | Dist. | | |
  • | +-------------------------------------------------+ |
  • | |
  • +-------------------------------------------------------+
  • <------------------ 3.5" (2x4 Stud) -------------------->
  • The 1.5-Inch Edge Clearance Rule

Under IPC Section 305.8, physical shield protection is mandated whenever piping passes through holes or notches in framing members (studs, joists, rafters, sole plates, or top plates) where the outside edge of the pipe is located closer than 1.5 inches (38 mm) from the nearest face of the framing member.

If a hole is bored dead center in a nominal 2x6 stud (actual width 5.5 inches), a 1-inch pipe leaves (5.5 - 1.0) / 2 = 2.25 inches of wood on either side. Because 2.25 inches exceeds 1.5 inches, no steel shield plate is mandated by code (though installing one remains good trade practice).

If the same pipe is bored in a nominal 2x4 stud (actual width 3.5 inches), the remaining wood on either side is (3.5 - 1.0) / 2 = 1.25 inches . Because 1.25 inches is less than 1.5 inches, a steel shield plate is strictly required.

Shield Plate Specifications

Where protection is triggered:

Material & Thickness: Indiana amended Section 305.8 specifically on this point. Where the model 2006 IPC calls for a plate "sixty two thousandths (0.062)-inch-thick," 675 IAC 16-1.4-4(j) substitutes "five hundred seventy-five ten-thousandths (0.0575)-inch-thick (1.463 mm), No. 16 gage" steel. So the Indiana answer is 0.0575 inch, No. 16 gage steel — not 0.062 inch and not a rounded "1/16 inch."

Coverage Area: The code language is precise: the plate "shall cover the area of the pipe where the member is notched or bored, and shall extend a minimum of 2 inches (51 mm) above sole plates and below top plates ."

Which pipes trigger it: Section 305.8 applies to piping other than cast-iron or galvanized steel . A cast-iron or galvanized steel pipe run through a bored stud does not require a shield plate.

Cold-Formed Steel Studs: In steel-framed structures, certified steel stud clips or listed snap-in grommets must be used to prevent the razor-sharp punched edges of the steel studs from abrading plastic or copper pipes, in addition to steel strike plates on the stud flanges.

  • Comparison Reference Tables
  • Table 1: Underground Piping & Soil Protection Standards
  • Installation Scenario Minimum Code Requirement Relevant IPC / IN Code Clause
  • Trench Subgrade in Solid Rock Over-excavate 3 inches; bed with clean sand or pea gravel IPC 306.2.2
  • Initial Backfill Depth 12 inches minimum clean, stone-free earth in 6-inch lifts IPC 306.3
  • Exterior Water Supply Bury Depth 36, 42 or 48 inches to top of pipe, by county IN 305.6.2 / Table 305.6.2

Exterior Wall Penetration (Sillcock) Frost-proof, automatic draining wall hydrant conforming to ASSE 1019, seat inside the heated envelope ASSE 1019 (referenced standard); see IPC 305.6 for freeze protection generally

  • Foundation Wall Penetration Pipe sleeve 2 pipe sizes larger, or relieving arch IPC 305.5
  • Piping in Cinders / Corrosive Soils Polyethylene wrap, coal-tar epoxy, or 10-mil 50% overlap tape IPC 305.1

Dissimilar Metal Joint (Copper to Steel) Dielectric union, dielectric coupling, or brass nipple IPC 305.1 / 305.3

Table 2: Structural Framing & Shielding Criteria

Framing Condition Clearance Threshold Required Protection Device Dimensional Specification

Bored Hole / Notch in Wood Stud Less than 1.5 inches from edge No. 16 gage steel shield plate 0.0575" thick (IN 305.8)

Penetration of Sole / Top Plate Closer than 1.5 inches from edge No. 16 gage steel shield plate Extends 2" above sole / below top plate

Penetration of Steel Studs All punch-out penetrations Plastic / elastomeric grommet + plate Snug fit grommet plus 0.0575" flange plate

Direct Concrete Slab Embedment All plumbing pipes (IN 305.3) Sleeve or wrap — direct embedment prohibited "No plumbing pipes shall be directly embedded in concrete or masonry"