Study guide
3.2 Residential Building Systems: HVAC, Plumbing & Electrical
IREM Accredited Residential Manager ARM
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Market Analysis, Advertising & Marketing Planning
1.1 Market Analysis, Competitive Surveys & Demographics 1.2 Residential Marketing Plans & Advertising Channels 1.3 Rental Rate Setting, Concessions & Effective Rent
2 Chapter 2: The Residential Leasing Process & Application Screening
2.1 Inquiry Handling, Guest Cards & CRM Tracking 2.2 Touring, Overcoming Objections & Closing Ratios 2.3 Application Screening, Consumer Reports & Selection Criteria
3 Chapter 3: Maintenance Operations, Work Orders & Building Systems
3.1 Maintenance Types & Work Order Priorities 3.2 Residential Building Systems: HVAC, Plumbing & Electrical 3.3 Unit Turn Process & Make-Ready Standards
4 Chapter 4: Capital Planning, Contractor Management & Environmental Safety
4.1 Capital Expenditures, Reserve Funds & Useful Life 4.2 Vendor Management, Bidding & Contract Administration 4.3 Environmental Safety: Mold, Lead-Based Paint & HazCom
5 Chapter 5: Property Accounting & Financial Statements
5.1 Accounting Methods: Cash vs. Accrual & Chart of Accounts 5.2 The Income Statement: GPR, Vacancy & Effective Gross Income 5.3 Operating Expenses, NOI & Financial Trend Reports
6 Chapter 6: Budgeting, Valuation & Financial Analysis
6.1 Operating Budget Preparation & Forecasting 6.2 Budget Variance Analysis & Corrective Actions 6.3 Property Valuation & Investment Return Metrics
7 Chapter 7: Federal Fair Housing Laws & Protected Classes
7.1 Fair Housing Act: Protected Classes, Prohibited Acts & Coverage 7.2 Reasonable Accommodations & Assistance Animals 7.3 ADA Title III, Section 504, Accessible Design & Screening
8 Chapter 8: Landlord-Tenant Law, Lease Agreements & Evictions
8.1 The Residential Lease Agreement & Key Provisions 8.2 Security Deposits, Habitability & Landlord Obligations 8.3 Lease Terminations, Default & The Eviction Process
9 Chapter 9: Risk Management, Insurance & Emergency Preparedness
9.1 Risk Management Principles & Property Insurance Coverage 9.2 Liability Insurance, Umbrella Policies & Vendor Risk Transfer 9.3 Business Income Insurance & Emergency Preparedness Plans
10 Chapter 10: Resident Retention, Customer Service & Turnover Reduction
10.1 The Economics of Resident Retention & Turnover Costs 10.2 Customer Service Delivery & Service Recovery Frameworks 10.3 Lease Renewal Strategies & Retention Metrics
11 Chapter 11: Property Strategy, Ownership & Client Objectives
11.1 Ownership Structures, Property Context & Investor Objectives 11.2 Management Agreements, Delegated Authority & Client Direction 11.3 Management Plans, Objectives & Performance Controls
12 Chapter 12: Staffing, Employment Compliance & Development
12.1 Staffing Plans, Job Descriptions & Equal Employment Opportunity 12.2 Recruitment, Structured Selection & Onboarding 12.3 Training, Safety Competency & Employee Development
13 Chapter 13: Leadership, Performance & Team Dynamics
13.1 Supervision, Performance, Coaching & Corrective Action 13.2 Leadership, Team Dynamics, Communication & Prioritization
14 Chapter 14: Operating Controls & Sustainable Operations
14.1 Cash Receipts, Payables, Deposits & Bank Reconciliation 14.2 Policies, Records, Inspections & Control Logs 14.3 Sustainable Operations: Energy, Water, Waste & Resilience
15 Chapter 15: IREM Code of Professional Ethics & Enforcement
15.1 Articles 1–4: Loyalty, Confidentiality, Reporting & Funds 15.2 Articles 5–9: Professional Relations, Contracts, Conflicts & Assets 15.3 Articles 10–14 & the IREM Ethics Process
3.2 Residential Building Systems: HVAC, Plumbing & Electrical
Key Takeaways Explain This Topic AI
One ton of cooling equals 12,000 BTU per hour, but equipment sizing requires a qualified load calculation using climate, envelope, orientation, ventilation, occupancy assumptions, and building conditions—not a universal square-feet-per-ton rule.
Equipment efficiency, refrigerant, ventilation, and installation requirements depend on equipment type, region, manufacture date, adopted codes, and current federal standards.
Domestic-water temperature, storage, distribution, and scald/Legionella controls require a system-specific plan; a universal 120°F maximum does not solve every risk.
Plumbing and electrical systems require current maps, shutoff and panel access, qualified work, preventive inspection, code compliance, and prompt escalation of abnormal heat, odor, leakage, pressure, or repeated trips.
Submetering can create a direct conservation signal when lawful and accurate; RUBS and other allocations require lease disclosure, legal review, consistent calculation, and utility-data controls.
Last updated: September 2026
The manager's role
Core controls include:
- an accurate equipment and shutoff inventory;
- qualified inspection, maintenance, and regulated work;
- safe isolation and emergency response;
- trend records for failure, use, and cost; and
commissioning and documented closeout.
An ARM does not replace a licensed engineer, electrician, plumber, or HVAC technician. The manager builds controls around the systems: accurate inventory, current diagrams, inspection and preventive-maintenance schedules, qualified vendors, access and shutdown plans, resident communication, budget forecasts, and complete records. Work within licensing, permit, refrigerant, safety, and adopted-code requirements.
A building-systems file should identify equipment, location, serving area, manufacturer/model/serial, capacity, age or installation date, warranty, controls, energy source, maintenance task, responsible party, and critical parts. Record symptoms and root causes rather than closing repeated failures as isolated calls.
HVAC fundamentals
Cooling capacity is measured in BTU per hour; one nominal ton equals 12,000 BTU/hr . If a qualified design states a 24,000-BTU/hr requirement, nominal capacity is 2 tons. Do not reverse that arithmetic into a rule that every 1,000- or 1,200-square-foot dwelling needs 2 tons.
Sizing uses a recognized load calculation and actual climate, orientation, insulation, windows, infiltration, internal loads, ventilation, ducts, and design conditions. Oversizing can cause short cycles, poor humidity control, noise, and inefficient operation; undersizing can fail to maintain design conditions. Replacement should also examine ducts, electrical service, condensate, ventilation, controls, refrigerant, and commissioning.
Federal minimum efficiency varies with product category, region, capacity, and manufacture or installation dates. Verify the current Department of Energy rule and local energy code for the selected equipment; do not memorize one SEER2 number for all residential systems. Confirm matched indoor and outdoor components and the certified rating.
Preventive work follows manufacturer instructions and conditions. Inspect filters, coils, drains, pans, belts, motors, electrical connections, combustion and venting, thermostats, refrigerant symptoms, and outdoor clearances as applicable. Filter type and interval depend on design, pressure drop, occupancy, air quality, and manufacturer guidance; a high-MERV filter that exceeds system capability can reduce airflow.
Only certified or licensed personnel should perform regulated refrigerant, combustion, gas, or electrical work. Carbon-monoxide alarms are a life-safety backstop, not a substitute for combustion inspection and venting.
Plumbing and water management
Maintain current main, building, riser, unit, irrigation, fire-protection, and fuel shutoff maps. Label valves, protect access, and exercise or inspect them as the system and manufacturer permit. Ball, gate, butterfly, and other valves each have applications; no ARM rule requires replacing every gate valve solely because of type.
Track pressure, consumption, leaks, hot-water delivery, recurring backups, corrosion, freeze exposure, and water-heater relief and drain routing. A temperature-and-pressure relief valve is a safety device; it must never be capped, plugged, or used as an operating control. Qualified service verifies set points and installation.
Hot-water management balances scald prevention, microbial control, code, equipment, distribution loss, resident vulnerability, and point-of-use protection. A storage or outlet temperature of 120°F is not a universal federal maximum and does not by itself manage Legionella throughout a complex system. Use a written water-management approach where building type and risk warrant it, measure at appropriate points, maintain circulation, address stagnation, and use mixing or anti-scald devices as designed.
On a leak, protect people from electrical and structural hazards, stop water through the correct valve if safe, notify affected residents and response resources, extract water, evaluate hidden migration and contamination, and document repair and drying.
Utility measurement and recovery
Master metering shows total property use. Direct submeters can measure unit consumption and provide a direct price signal when lawful, installed and calibrated correctly, and billed transparently. A ratio utility billing system allocates a master bill using defined factors rather than measured unit use. RUBS must not be described as exact consumption.
Before implementing a recovery method, check utility regulation, submeter licensing or testing, lease disclosure, fee limits, vacant/common-area allocation, data privacy, dispute rights, and affordable-program restrictions. Reconcile resident charges to source bills and approved calculations.
Electrical systems
Maintain panel and disconnect directories that identify the actual served load. Keep required working clearances and secure resident or public access without blocking authorized emergency response. Qualified electricians evaluate overheating, arcing, corrosion, water intrusion, damaged conductors, missing covers, repeated breaker trips, improper modifications, grounding/bonding, and capacity.
GFCI and AFCI requirements depend on the adopted electrical code, location, construction or alteration, and equipment. Do not reduce current rules to “within six feet of water” or assume every existing unit has the same retrofit trigger. Never replace a tripping breaker with a higher rating until a qualified person verifies conductor ampacity, load, fault, and code.
Older equipment with documented concerns, including Federal Pacific Stab-Lok panels, calls for prompt evaluation by a qualified electrician, insurer coordination, risk control, and a documented replacement recommendation based on condition and current evidence. A manager should not declare equipment permanently grandfathered or allow unapproved breaker substitutions.
Roofs, drainage, pavement, and exterior systems
Treat the roof, flashing, sealants, walls, windows, balconies, site drainage, and pavement as connected water- and safety-control systems. Maintain dated condition records and inspect at risk-based intervals, including after severe weather or nearby work. Look for membrane or shingle damage, open seams, failed flashing, blocked drains, ponding, staining, displaced components, corrosion, settlement, trip hazards, potholes, and failed pavement drainage.
A ceiling stain identifies a symptom, not necessarily the entry point. Protect occupants and contents, control active water when safe, trace migration with qualified help, document moisture and drying, and repair the source rather than repeatedly patching the interior. Roof access, fall protection, structural evaluation, and electrical proximity require qualified procedures.
For pavement and exterior areas, prioritize active trip, accessibility, drainage, fire-access, and structural hazards. Seal or patch work may extend service life but does not cure failed base, slope, or drainage. Link inspection findings to preventive work, reserve forecasts, permits, warranties, resident communication, and a phased capital plan; age alone neither proves failure nor justifies deferral.
Preventive and capital controls
Rank systems by life safety, service criticality, failure history, remaining support, energy or water impact, and consequence of failure. Use trend data—repeat calls, runtime, temperature, pressure, consumption, parts, and downtime—to distinguish maintenance from replacement. Evaluate installed cost, permits, resident disruption, maintenance, useful life, compatibility, incentives, and measured savings.
Commission completed work. Verify controls, labels, capacity, permits, startup data, manuals, warranties, staff training, and baseline performance. Close the project only after deficiencies are resolved.
Exam approach
Use unit conversions when the load is provided, but reject rules of thumb as design. Choose qualified assessment, source isolation, current code and manufacturer instructions, documented authority, and verification. Never defeat a safety device, upsize a breaker to stop trips, or promise a utility method without legal and meter controls.