3.3 Tripping Operations & Trip Tank Monitoring

IWCF Level 2 Drilling Well Control Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Well Control Introduction, Pressure Fundamentals & Well Barriers

1.1 Principles of Well Control & Incident Impact 1.2 Hydrostatic Pressure, Formation Pressure & Pressure Gradients 1.3 Well Barrier Philosophy & Barrier Management

2 Chapter 2: Rig Hydraulics, Circulating System & Formation Strength

2.1 Circulating System & Annular Friction Losses 2.2 Equivalent Circulating Density (ECD) & Slow Circulation Rates (SCR) 2.3 Formation Integrity Testing (FIT, LOT) & MAASP

3 Chapter 3: Causes of Kicks & Tripping Mechanics

3.1 Primary Causes of Well Influxes 3.2 Swabbing and Surging Dynamics 3.3 Tripping Operations & Trip Tank Monitoring

4 Chapter 4: Kick Detection & Warning Signs

4.1 Positive Kick Indicators 4.2 Warning Signs of an Impending Kick 4.3 Shallow Gas Hazards & Diverter Operations

5 Chapter 5: Influx Behavior, Shut-In Procedures & Pressures

5.1 Influx Behavior & Gas Migration 5.2 Shut-In Procedures for Drilling, Tripping & Out of Hole 5.3 Shut-In Drill Pipe Pressure (SIDPP), Shut-In Casing Pressure (SICP) & Pit Gain

6 Chapter 6: Kill Sheet Calculations & Well Control Methods

6.1 Kill Sheet Fundamentals & Pre-Recorded Data 6.2 Kill Mud Weight, ICP & FCP Calculations 6.3 Well Control Methods: Driller's, Wait and Weight & Volumetric

7 Chapter 7: Well Control During Casing & Cementing

7.1 Running & Pulling Casing and Liner: Swab, Surge, Returns & Shut-In 7.2 Cementing Casing and Liner: BHP Changes, Verification & Flow During Cementing

8 Chapter 8: Blowout Preventers (BOPs) & Stack Arrangements

8.1 Ram-Type Blowout Preventers 8.2 Annular Blowout Preventers 8.3 BOP Stack Configurations & Drilling Spools

9 Chapter 9: Choke Manifolds, Auxiliary Equipment & Control Systems

9.1 Choke Manifolds, Chokes & Flow Routing 9.2 Internal Blowout Preventers & Auxiliary Equipment 9.3 BOP Hydraulic Control Systems (Closing Units)

10 Chapter 10: Testing, Maintenance & Subsea Systems

10.1 BOP Pressure Testing & Function Testing 10.2 Well Control Drills & Operational Risk Management 10.3 Subsea Well Control Equipment Overview

3.3 Tripping Operations & Trip Tank Monitoring

Key Takeaways Explain This Topic AI

The trip tank is a small-volume (20–50 bbl), high-resolution vessel designed to measure small fluid volume changes (0.1–0.5 bbl) during tripping operations.

Trip sheets track theoretical metal displacement against actual measured hole fill stand-by-stand; taking less mud indicates an influx, while taking more indicates lost circulation.

Pulling wet pipe removes the closed-end volume (steel displacement plus pipe capacity), about three times or more the fill needed for dry pipe (3.4 times in the 5-inch example).

Slugging the drill string with heavy mud creates a U-tube imbalance that drops the fluid level inside the drill pipe below the rotary table, allowing pipe to be pulled dry and producing an initial predictable surface pit gain.

Typical flow-check points are on bottom before tripping, at the casing shoe, before the BHA enters the BOP, and whenever the trip sheet shows an unexplained deviation; if a static well has swabbed, run back to bottom and circulate the influx out.

Last updated: October 2026

Important

A large proportion of kicks are taken while tripping, mainly through swabbing and failure to keep the hole full. Rigorous volumetric tracking using a dedicated trip tank and an accurate stand-by-stand trip sheet represents the driller's primary line of defense against undetected influxes.

The Tripping Process

Tripping means pulling the drill string out of the hole and running it back in, usually to change the bit or BHA:

Pulling out of hole (POOH): stands are pulled, broken out and racked in the derrick. Steel leaves the well, so the hole must be filled with mud to replace it. The main risk is swabbing .

Running in hole (RIH): stands are picked up and run back in. The pipe pushes mud out of the well into the trip tank. The main risk is surging , and a string with a float must be filled at intervals.

A round trip is a complete trip out and back in. The well must be monitored on the trip tank throughout, including while the bit is out of the hole.

The Trip Tank: Engineering Design and Principles

Active mud pits are poorly suited for monitoring tripping operations. A typical active mud pit holds between 200 200 200 and 500 bbl 500 \text{ bbl} 500 bbl of fluid across a wide surface area; a volume change of 1 1 1 to 2 bbl 2 \text{ bbl} 2 bbl represents a liquid level variation of less than a tenth of an inch, making precise detection virtually impossible.

The trip tank is an engineered monitoring vessel specifically designed to solve this limitation:

Capacity and Dimensions : Small total volume (typically 20 20 20 to 50 bbl 50 \text{ bbl} 50 bbl ), constructed as a tall, narrow rectangular or cylindrical tank.

High Measurement Resolution : Because the cross-sectional area is small, a 1 bbl 1 \text{ bbl} 1 bbl volume change causes a prominent liquid level shift of several inches. Calibrated digital transducers and mechanical float pointers provide resolution to within 0.1 0.1 0.1 to 0.5 bbl 0.5 \text{ bbl} 0.5 bbl .

Continuous vs. Batch Filling :

Continuous Filling : A low-rate centrifugal pump continuously circulates mud from the trip tank to the bell nipple, with an overflow line returning excess fluid back to the tank. As pipe is pulled, fluid fills the wellbore automatically, and the trip tank level drops continuously in direct proportion to displaced steel.

Batch Filling : The well is filled periodically after pulling a fixed number of stands (e.g., every 3 to 5 stands of drill pipe, or after every single stand of drill collars), recording the exact volume required to refill the hole to the overflow line.

Trip Sheets: Stand-by-Stand Displacement Tracking

A trip sheet is an active accounting ledger maintained by the driller, mud logger, and derrickman throughout every tripping operation. It records cumulative theoretical metal displacement against actual measured mud fill from the trip tank.

Discrepancy = V actual fill − V theoretical displacement \text{Discrepancy} = V_{\text{actual fill}} - V_{\text{theoretical displacement}} Discrepancy = V actual fill ​ − V theoretical displacement ​

Interpreting Trip Sheet Discrepancies

Case 1: Actual Fill < Theoretical Displacement : The well took less mud than calculated metal displacement. Formation fluid has entered the wellbore (swabbed influx) and is displacing mud volume. Tripping must stop immediately to conduct a formal flow check!

Case 2: Actual Fill > Theoretical Displacement : The well took more mud than calculated metal displacement. Drilling fluid is leaking into the formation (lost circulation), risking a drop in annular hydrostatic level. Tripping must halt to monitor the well and prepare remedial action.

Any deviation from the expected trip-sheet value that cannot be explained is treated as a warning: stop the trip and flow check. Many operators also set a numeric tolerance in their procedures, but a Level 2 crew member's duty is simply to report any difference to the Driller at once.

Pulling Dry Pipe vs. Pulling Wet Pipe

Accurately calculating theoretical displacement requires distinguishing between dry and wet pipe:

1. Pulling Dry Pipe

When pulling dry pipe, fluid inside the drill string drains freely through the bit nozzles back into the well. Only the volume of the steel pipe wall leaves the borehole:

V fill, dry = L pulled × Steel Displacement Factor (bbl/ft) V_{\text{fill, dry}} = L_{\text{pulled}} \times \text{Steel Displacement Factor (bbl/ft)} V fill, dry ​ = L pulled ​ × Steel Displacement Factor (bbl/ft)

Example Calculation : Pulling 5 stands ( 465 ft 465 \text{ ft} 465 ft ) of 5-inch, 19.5 lb/ft 19.5 \text{ lb/ft} 19.5 lb/ft drill pipe with a steel displacement factor of 0.00753 bbl/ft 0.00753 \text{ bbl/ft} 0.00753 bbl/ft requires:

V fill = 465 ft × 0.00753 bbl/ft = 3.50 bbl V_{\text{fill}} = 465 \text{ ft} \times 0.00753 \text{ bbl/ft} = 3.50 \text{ bbl} V fill ​ = 465 ft × 0.00753 bbl/ft = 3.50 bbl

2. Pulling Wet Pipe

When the bit nozzles are plugged, or when no heavy slug is pumped and the mud cannot drain fast enough, drilling mud is pulled out inside the pipe. The pipe comes out full of mud and dumps onto the rig floor. Both the steel wall and the internal fluid capacity leave the well:

V fill, wet = L pulled × ( Steel Displacement + Internal Capacity ) = L pulled × Closed-End Displacement V_{\text{fill, wet}} = L_{\text{pulled}} \times (\text{Steel Displacement} + \text{Internal Capacity}) = L_{\text{pulled}} \times \text{Closed-End Displacement} V fill, wet ​ = L pulled ​ × ( Steel Displacement + Internal Capacity ) = L pulled ​ × Closed-End Displacement

Example Calculation : The same 5-inch pipe has an internal capacity of 0.01776 bbl/ft 0.01776 \text{ bbl/ft} 0.01776 bbl/ft . The closed-end displacement is:

Closed-End Factor = 0.00753 + 0.01776 = 0.02529 bbl/ft \text{Closed-End Factor} = 0.00753 + 0.01776 = 0.02529 \text{ bbl/ft} Closed-End Factor = 0.00753 + 0.01776 = 0.02529 bbl/ft

V fill, wet = 465 ft × 0.02529 bbl/ft = 11.76 bbl V_{\text{fill, wet}} = 465 \text{ ft} \times 0.02529 \text{ bbl/ft} = 11.76 \text{ bbl} V fill, wet ​ = 465 ft × 0.02529 bbl/ft = 11.76 bbl

Warning

Pulling wet pipe requires more than 3.3 times the fill volume of dry pipe! If a driller mistakenly calculates hole fill using dry displacement tables while pulling wet pipe, the hole will be under-filled by about 8.3 bbl 8.3 \text{ bbl} 8.3 bbl every 5 stands. In 8.5 -inch 8.5\text{-inch} 8.5 -inch hole around 5-inch pipe (about 0.046 bbl/ft 0.046 \text{ bbl/ft} 0.046 bbl/ft of annulus) that is roughly 180 ft of lost fluid column each time, hundreds of feet within a few groups of stands, enough to trigger a severe kick.

Slugging the Drill String: Physics of U-Tubing

To avoid the hazards, mess, and volumetric confusion of pulling wet pipe, crews pump a heavy slug into the drill string prior to tripping out.

The U-Tube Slugging Procedure

A high-density mud pill (typically 2.0 2.0 2.0 to 4.0 ppg 4.0 \text{ ppg} 4.0 ppg heavier than active mud weight) with a volume of 15 15 15 to 30 bbl 30 \text{ bbl} 30 bbl is mixed in the slug pit.

The slug is pumped into the top of the drill pipe and displaced down the string until it is positioned in the upper drill pipe, well above the bit.

The mud pump is disengaged and the drill string is vented to atmosphere.

Hydrostatic U-Tubing : Because the high-density slug column exerts greater hydrostatic pressure than the surrounding active mud in the annulus, the fluid inside the drill string falls, pushing annular fluid upward and out into the surface pits until hydrostatic balance is achieved at the bit nozzles:

H P string = H P annulus HP_{\text{string}} = HP_{\text{annulus}} H P string ​ = H P annulus ​

As the fluid falls, the internal liquid level drops below the rotary table by a vertical distance Δ h drop \Delta h_{\text{drop}} Δ h drop ​ :

Δ h drop = V slug × ( MW slug − MW mud ) MW mud × DP Capacity (bbl/ft) \Delta h_{\text{drop}} = \frac{V_{\text{slug}} \times (\text{MW}_{\text{slug}} - \text{MW}_{\text{mud}})}{\text{MW}_{\text{mud}} \times \text{DP Capacity (bbl/ft)}} Δ h drop ​ = MW mud ​ × DP Capacity (bbl/ft) V slug ​ × ( MW slug ​ − MW mud ​ ) ​

This drop creates an empty interval of 150 150 150 to 300 ft 300 \text{ ft} 300 ft inside the pipe below the rig floor, allowing stands to be disconnected and racked dry without spillage.

Surface Pit Gain Accounting

The mud displaced out of the drill string flows up the annulus and discharges into the active surface pits, generating a predictable pit gain:

V pit gain = Δ h drop × DP Capacity (bbl/ft) = V slug × ( MW slug MW mud − 1 ) V_{\text{pit gain}} = \Delta h_{\text{drop}} \times \text{DP Capacity (bbl/ft)} = V_{\text{slug}} \times \left(\frac{\text{MW}_{\text{slug}}}{\text{MW}_{\text{mud}}} - 1\right) V pit gain ​ = Δ h drop ​ × DP Capacity (bbl/ft) = V slug ​ × ( MW mud ​ MW slug ​ ​ − 1 )

Crew pit discipline requires calculating this expected gain in advance. Any pit gain in excess of the theoretical U-tube volume indicates that an influx has entered during the slugging process!

Trip Margin

A trip margin is an intentional safety increment added to the drilling mud density prior to pulling out of hole, designed to offset the calculated swab pressure drop ( P swab P_{\text{swab}} P swab ​ ):

Trip Margin (ppg) = P swab anticipated 0.052 × TVD \text{Trip Margin (ppg)} = \frac{P_{\text{swab anticipated}}}{0.052 \times \text{TVD}} Trip Margin (ppg) = 0.052 × TVD P swab anticipated ​ ​

The trip margin is set in the well programme (a few tenths of a ppg is common), providing a hydrostatic buffer that prevents transient underbalance during pipe withdrawal.

Flow-Check Protocols During Tripping Operations

A flow check requires halting all pipe motion, lining the well up on the trip tank (or visual observation at the bell nipple), and verifying that the well is completely static.

Flow-Check Duration and Points

The observation period is set by company procedure (commonly 10 to 15 minutes, and longer in some conditions, for example with oil-based mud or in deep, hot wells). Typical flow-check points are:

On Bottom Prior to Tripping Out : After circulating bottoms up and confirming mud properties are homogenous and gas-free.

At the Casing Shoe : When the bit reaches the casing shoe, isolating the open-hole section from the surface casing.

Before the BHA Enters the BOP Stack : Drill collars and stabilizers have minimal clearance in the BOP bore; checking flow before entering the stack ensures the well is static before rams are restricted.

Whenever the Trip Sheet Shows a Discrepancy : any time the hole takes more or less mud than the calculated displacement and the difference cannot be explained.

Whenever Overpull or Swabbing Indications Occur : Any tight hole drag encountered during hoisting.

Actions When the Trip Sheet Shows an Influx

The IWCF syllabus rates this outcome at the highest importance level. When the trip tank shows the hole has taken too little mud:

Stop the trip and flow check: set the slips, install the open full-opening safety valve, and watch the trip tank.

If the well is flowing: shut the well in immediately using the tripping shut-in procedure (Chapter 5).

If the well is static: the swabbed influx is still in the hole. Run back to bottom , checking the trip tank displacement on every stand, and then circulate the influx out (bottoms up), taking returns through the choke and mud-gas separator if gas is expected. Only then is the trip restarted, often with a higher trip margin or by pumping out of the hole.

Running back to bottom matters because an influx can only be circulated out from below; circulating with the bit high in the hole would leave the influx beneath the bit.

Loading diagram... Trip Tank Monitoring and Heavy Slug U-Tube Dynamics