Study guide

9.2 Internal Blowout Preventers & Auxiliary Equipment

IWCF Level 2 Drilling Well Control Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Well Control Introduction, Pressure Fundamentals & Well Barriers

1.1 Principles of Well Control & Incident Impact 1.2 Hydrostatic Pressure, Formation Pressure & Pressure Gradients 1.3 Well Barrier Philosophy & Barrier Management

2 Chapter 2: Rig Hydraulics, Circulating System & Formation Strength

2.1 Circulating System & Annular Friction Losses 2.2 Equivalent Circulating Density (ECD) & Slow Circulation Rates (SCR) 2.3 Formation Integrity Testing (FIT, LOT) & MAASP

3 Chapter 3: Causes of Kicks & Tripping Mechanics

3.1 Primary Causes of Well Influxes 3.2 Swabbing and Surging Dynamics 3.3 Tripping Operations & Trip Tank Monitoring

4 Chapter 4: Kick Detection & Warning Signs

4.1 Positive Kick Indicators 4.2 Warning Signs of an Impending Kick 4.3 Shallow Gas Hazards & Diverter Operations

5 Chapter 5: Influx Behavior, Shut-In Procedures & Pressures

5.1 Influx Behavior & Gas Migration 5.2 Shut-In Procedures for Drilling, Tripping & Out of Hole 5.3 Shut-In Drill Pipe Pressure (SIDPP), Shut-In Casing Pressure (SICP) & Pit Gain

6 Chapter 6: Kill Sheet Calculations & Well Control Methods

6.1 Kill Sheet Fundamentals & Pre-Recorded Data 6.2 Kill Mud Weight, ICP & FCP Calculations 6.3 Well Control Methods: Driller's, Wait and Weight & Volumetric

7 Chapter 7: Well Control During Casing & Cementing

7.1 Running & Pulling Casing and Liner: Swab, Surge, Returns & Shut-In 7.2 Cementing Casing and Liner: BHP Changes, Verification & Flow During Cementing

8 Chapter 8: Blowout Preventers (BOPs) & Stack Arrangements

8.1 Ram-Type Blowout Preventers 8.2 Annular Blowout Preventers 8.3 BOP Stack Configurations & Drilling Spools

9 Chapter 9: Choke Manifolds, Auxiliary Equipment & Control Systems

9.1 Choke Manifolds, Chokes & Flow Routing 9.2 Internal Blowout Preventers & Auxiliary Equipment 9.3 BOP Hydraulic Control Systems (Closing Units)

10 Chapter 10: Testing, Maintenance & Subsea Systems

10.1 BOP Pressure Testing & Function Testing 10.2 Well Control Drills & Operational Risk Management 10.3 Subsea Well Control Equipment Overview

9.2 Internal Blowout Preventers & Auxiliary Equipment

Key Takeaways Explain This Topic AI

Internal well control barriers (upper and lower kelly cocks, FOSV, IBOP, and float valves) seal the internal bore of the drill string, preventing pressurized formation influx from broaching up the tubulars.

The Full Opening Safety Valve (FOSV / TIW valve) must be maintained on the rig floor in the FULLY OPEN position with matching threads and dedicated operating wrench at all times during tripping.

The Inside BOP (IBOP / Gray valve) is a spring-loaded non-return check valve that halts upward flow while allowing fluid to be pumped down; it is stabbed with its release rod holding it open, or made up on top of the closed FOSV, which is then reopened.

Mud-Gas Separators (MGS) rely on a hydrostatic liquid seal U-tube mud leg ( h seal h_{\text{seal}} h seal ​ ); exceeding vessel blow-through pressure ( P blow-through = 0.052 × ρ mud × h seal P_{\text{blow-through}} = 0.052 \times \rho_{\text{mud}} \times h_{\text{seal}} P blow-through ​ = 0.052 × ρ mud ​ × h seal ​ ) discharges hazardous gas directly to the shale shakers.

Vacuum degassers apply sub-atmospheric pressure ( 5 − 10 inHg 5 - 10\text{ inHg} 5 − 10 inHg ) downstream of shale shakers to extract fine entrained gas bubbles that gravity cannot liberate, preventing gas recirculation and mud pump cavitation.

Last updated: October 2026

Blowout Preventer (BOP) stacks seal the annular space between casing and drill string. However, the drill string forms an open conduit connecting downhole formations directly to the rig floor. If an influx enters the drill pipe through bit nozzles, annular preventers cannot arrest internal flow. To protect the rig floor, maintain wellbore containment, and safely process gas-cut mud at surface, drilling operations depend on internal well control barrier valves and surface mud-gas processing equipment .

1. Kelly Cocks (Upper and Lower)

Kelly cocks isolate surface circulating equipment from internal drill string pressures.

Upper Kelly Cock

Installed between the rotary swivel and top of the kelly with left-hand threads to resist backing off under clockwise table torque. Rated equal to or exceeding BOP stack pressure, closing it protects the flexible rotary hose, swivel washpipe, and standpipe manifold from extreme well pressure.

Lower Kelly Cock (Lower Kelly Valve)

Installed between the bottom of the kelly and the saver sub with standard right-hand threads . It prevents drilling fluid inside the kelly from spilling onto the floor during connections, and provides an emergency barrier if a kick flows up the string.

Top-Drive IBOP Valves

On top-drive rigs the kelly cocks are replaced by two valves in the top drive : an upper valve that is remotely (hydraulically) operated from the driller's console and a lower valve that is operated manually. Closing them isolates the top drive, rotary hose and standpipe from well pressure.

2. Full Opening Safety Valve (FOSV / TIW Valve)

The Full Opening Safety Valve (FOSV) —commonly termed a TIW valve—is a quarter-turn spherical ball valve designed for emergency stabbing into the drill string during tripping.

Design & Readiness Mandate

In the open position, the FOSV provides an unobstructed bore matching the inside diameter of drill pipe tool joints, allowing wireline logging sondes, free-point tools, or drop-in darts to pass downhole unimpeded. During tripping, the FOSV must remain on the rig floor in the FULLY OPEN position , equipped with threads matching the tubulars in the hole (or made up with a crossover sub), with its dedicated operating wrench beside it.

Why the correct crossover matters: the safety valve must be stabbed onto whatever is at the rotary table (drill pipe, heavy-weight pipe, drill collars, casing or tubing), and these often have different connections. If the correct-size crossover is not made up to the valve and ready on the drill floor, the crew cannot close in the string quickly when a kick happens with a different tubular in the slips.

Tripping Deployment Protocol

Stab While Open: Stabbing the valve open allows upward-surging fluids to exit through the bore, minimizing upward jetting thrust that would otherwise push the valve off the pipe box.

Make Up & Close: Once stabbed and torqued using rig tongs, the valve is closed 90 degrees using its operating wrench to seal the internal bore.

Stack Closure: Only after the drill string is isolated by the closed FOSV are BOP annular or pipe rams closed.

3. Inside Blowout Preventer (IBOP / Gray Valve)

The Inside Blowout Preventer (IBOP) , or Gray valve, is a heavy-duty, spring-loaded non-return check valve (dart or plunger type).

Operation & Release Rod Tool

The internal spring drives an elastomer-faced dart against a tapered seat, stopping upward flow while allowing mud to be pumped downward. A threaded release rod holds the dart open against its spring during stabbing; once made up into the string, the release rod is unscrewed, allowing the dart to seal against backpressure. The internal mechanism obstructs the bore, preventing wireline tool passage.

Coordinated Staging: FOSV + IBOP

Step 1: Stab, make up, and close the FOSV to immediately halt well flow.

Step 2: Thread the IBOP directly on top of the closed FOSV.

Step 3: Reopen the FOSV. Pumping operations can now proceed downhole through the IBOP, which automatically prevents reverse flow.

4. Drill Pipe Float Valves (Bit Floats)

Float valves are check valves installed in a float sub directly above the drill bit nozzles, preventing backflow of drilling mud, cuttings, and reservoir fluids into the bottom-hole assembly.

Plunger vs Flapper Floats

Plunger Type: Spring-loaded axial piston delivering positive reverse shut-off, but permanently obstructs the bore (preventing wireline passage). Like all floats it stops the string self-filling when running in, so the string must be filled from surface at intervals.

Flapper Type: Spring-assisted hinged flapper swinging flat against the sub wall during circulation, providing an unobstructed bore for wireline tools and drop-in balls. Vented flappers feature a micro-bleed orifice that equalizes pressure slowly, allowing static Shut-In Drill Pipe Pressure (SIDPP) to be read directly.

"Bumping the Float" Procedure

With an unvented float, the standpipe gauge reads 0 psi at shut-in. To determine true SIDPP:

Record static Shut-In Casing Pressure (SICP).

Start the mud pump at 2 to 5 SPM, slowly pumping fluid into the drill string while observing standpipe pressure.

At the instant pump pressure overcomes pressure below the bit, the float cracks open ("bumps"). Standpipe pressure levels off or breaks over, and casing pressure begins to tick upward.

Stop pumping as soon as casing pressure starts to rise. The drill pipe pressure at that point, less any rise in casing pressure above the original SICP, is the true SIDPP .

5. Surface Mud Processing: Mud-Gas Separator (MGS)

The Mud-Gas Separator (MGS) , or "poor boy" degasser, is a vertical vessel upstream of the shale shakers that separates free gas from gas-cut mud arriving from the choke manifold.

Separation Principles & Liquid Seal Leg

Gas-cut mud cascades over internal baffle plates that spread fluid into thin sheets, allowing free gas to break out rapidly by gravity and vent through an 8- to 12-inch derrick vent line. Degassed mud discharges through an inverted U-tube piping loop into the shaker ditch. The vertical height of this column ( h seal h_{\text{seal}} h seal ​ ) provides hydrostatic backpressure that prevents gas from entering the shaker house.

Gas Blow-Through Pressure Limit

The maximum allowable vessel backpressure before gas blows through the liquid seal is:

P blow-through = 0.052 × ρ mud × h seal [ psi ] P_{\text{blow-through}} = 0.052 \times \rho_{\text{mud}} \times h_{\text{seal}}\quad [\text{psi}] P blow-through ​ = 0.052 × ρ mud ​ × h seal ​ [ psi ]

In metric units: P blow-through = ρ mud × g × h seal 100 bar P_{\text{blow-through}} = \frac{\rho_{\text{mud}} \times g \times h_{\text{seal}}}{100}\text{ bar} P blow-through ​ = 100 ρ mud ​ × g × h seal ​ ​ bar .

Caution

Gas Blow-Through Hazard: If vessel backpressure exceeds P blow-through P_{\text{blow-through}} P blow-through ​ , the liquid seal is blown out. High-pressure gas blows through the U-tube directly into the shaker house, creating an extreme explosion and toxic H 2 S H_2S H 2 ​ S exposure hazard.

6. Vacuum Degassers

Installed downstream of the shale shakers, the vacuum degasser extracts microscopic entrained gas bubbles and dissolved gas that gravity segregation cannot remove.

Vacuum Mechanism: A vacuum pump or liquid-jet eductor maintains a sub-atmospheric vacuum of 5 to 10 inHg 5\text{ to }10\text{ inHg} 5 to 10 inHg ( 0.17 − 0.34 bar 0.17 - 0.34\text{ bar} 0.17 − 0.34 bar below atmosphere) inside the vessel.

Boyle's Law Expansion: Mud spreads across corrugated internal plates. Negative pressure causes microscopic gas bubbles to expand ( P 1 V 1 = P 2 V 2 P_1 V_1 = P_2 V_2 P 1 ​ V 1 ​ = P 2 ​ V 2 ​ ), burst, and vent away safely.

Preventing Pump Cavitation: Removing entrained gas restores true mud density and prevents vapor-locking and severe impeller cavitation in centrifugal charging pumps and triplex mud pumps.

Loading diagram... Mud-Gas Separator (MGS) Liquid Seal and Flow Separation