Study guide
5.2 Shut-In Procedures for Drilling, Tripping & Out of Hole
IWCF Level 2 Drilling Well Control Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Well Control Introduction, Pressure Fundamentals & Well Barriers
1.1 Principles of Well Control & Incident Impact 1.2 Hydrostatic Pressure, Formation Pressure & Pressure Gradients 1.3 Well Barrier Philosophy & Barrier Management
2 Chapter 2: Rig Hydraulics, Circulating System & Formation Strength
2.1 Circulating System & Annular Friction Losses 2.2 Equivalent Circulating Density (ECD) & Slow Circulation Rates (SCR) 2.3 Formation Integrity Testing (FIT, LOT) & MAASP
3 Chapter 3: Causes of Kicks & Tripping Mechanics
3.1 Primary Causes of Well Influxes 3.2 Swabbing and Surging Dynamics 3.3 Tripping Operations & Trip Tank Monitoring
4 Chapter 4: Kick Detection & Warning Signs
4.1 Positive Kick Indicators 4.2 Warning Signs of an Impending Kick 4.3 Shallow Gas Hazards & Diverter Operations
5 Chapter 5: Influx Behavior, Shut-In Procedures & Pressures
5.1 Influx Behavior & Gas Migration 5.2 Shut-In Procedures for Drilling, Tripping & Out of Hole 5.3 Shut-In Drill Pipe Pressure (SIDPP), Shut-In Casing Pressure (SICP) & Pit Gain
6 Chapter 6: Kill Sheet Calculations & Well Control Methods
6.1 Kill Sheet Fundamentals & Pre-Recorded Data 6.2 Kill Mud Weight, ICP & FCP Calculations 6.3 Well Control Methods: Driller's, Wait and Weight & Volumetric
7 Chapter 7: Well Control During Casing & Cementing
7.1 Running & Pulling Casing and Liner: Swab, Surge, Returns & Shut-In 7.2 Cementing Casing and Liner: BHP Changes, Verification & Flow During Cementing
8 Chapter 8: Blowout Preventers (BOPs) & Stack Arrangements
8.1 Ram-Type Blowout Preventers 8.2 Annular Blowout Preventers 8.3 BOP Stack Configurations & Drilling Spools
9 Chapter 9: Choke Manifolds, Auxiliary Equipment & Control Systems
9.1 Choke Manifolds, Chokes & Flow Routing 9.2 Internal Blowout Preventers & Auxiliary Equipment 9.3 BOP Hydraulic Control Systems (Closing Units)
10 Chapter 10: Testing, Maintenance & Subsea Systems
10.1 BOP Pressure Testing & Function Testing 10.2 Well Control Drills & Operational Risk Management 10.3 Subsea Well Control Equipment Overview
5.2 Shut-In Procedures for Drilling, Tripping & Out of Hole
Key Takeaways Explain This Topic AI
The IWCF Level 2 syllabus teaches the hard shut-in procedure, which most operator and contractor procedures use; the rig's own written procedure always defines the exact steps.
Hard shut-in closes the well faster, minimizes influx volume, results in lower shut-in casing pressure ( S I C P SICP S I CP ), and avoids having to close a choke against flowing returns.
While drilling, the Driller stops rotation, picks up off bottom and spaces out, stops the pumps, closes the designated BOP and opens the choke-line (HCR) valve; before drilling or tripping, the HCR is closed and a path through a closed choke is lined up.
While tripping, the crew must set the pipe in slips, stab and close a fully open FOSV (TIW valve), close the BOP, install an inside BOP (gray valve), and re-open the FOSV.
If a kick occurs when pipe is completely out of the hole, the Driller must immediately close the blind rams or blind shear rams without delay.
Last updated: October 2026
When a well influx occurs, rapid shut-in is the single most critical defense against a catastrophic blowout. Every second of delay permits additional formation fluid to enter the wellbore, enlarging total pit gain, elevating shut-in casing pressure ( S I C P SICP S I CP ), and increasing mechanical stress on the exposed formation and casing shoe.
Every rig must have written, rehearsed shut-in procedures for drilling, tripping and out-of-hole operations. The IWCF Level 2 syllabus asks candidates to explain the hard shut-in for drilling and tripping, to identify the manifold line-ups that make it possible, and to explain the responsibilities of the Driller and the crew.
The Operational Debate: Hard Shut-In vs. Soft Shut-In
Industry practice historically debated the relative merits of "Hard Shut-In" versus "Soft Shut-In." Understanding this evolution explains why the hard shut-in is now the widely used method.
Definitions of Shut-In Methods
Hard Shut-In: During normal drilling the choke-line HCR valve and the adjustable choke are closed, with a flow path through the choke manifold lined up to the mud-gas separator. When a kick is detected, the BOP (annular preventer or upper pipe ram) is closed immediately against the closed choke line. After the BOP is sealed, the choke line hydraulic fail-safe valve (HCR) is opened to align casing pressure to remote console gauges.
Soft Shut-In: During drilling the choke-line valve (HCR) is closed but the choke is left open. When a kick occurs, the HCR is opened, the BOP is closed so that the well flows through the open choke, and the choke is then closed to shut in the well.
- Operational Factor Hard Shut-In (Modern Standard) Soft Shut-In (Historical Practice)
- Execution Time Fastest: one BOP closure secures the well Slower: the choke must still be closed after the BOP
- Influx Volume Minimized (smallest pit gain) Substantially larger (influx flows during choke closure)
Shut-In Casing Pressure ( S I C P SICP S I CP ) Lowest possible casing pressure Higher casing pressure due to greater influx height
Casing Shoe Stress Lowest risk of formation breakdown Higher risk of exceeding MAASP and fracturing shoe
Human Error Risk Lower (fewer steps) Higher (choke must be closed under flow, with driller and choke operator coordinating)
- Water Hammer Effect Small pressure surge on closure in practice Designed to avoid water hammer
- Why the Hard Shut-In Is Preferred
Soft shut-in was originally advocated due to fears that closing a BOP rapidly against flowing mud would induce destructive hydraulic shock waves, known as water hammer , capable of rupturing casing or wellhead equipment.
Field experience and published studies have shown this concern to be small in practice:
Drilling mud is compressible enough (it contains solids and often small amounts of gas) to cushion the pressure wave.
BOPs do not close instantaneously. API Standard 53 allows a surface ram BOP up to 30 seconds to close, and an annular preventer up to 30 seconds (below 18-3/4 in bore) or 45 seconds (18-3/4 in and larger), so the flow is not stopped abruptly.
The extra influx taken during a soft shut-in is a far greater risk to the casing shoe than the small surge from a hard shut-in.
Conversely, soft shut-in delays well closure, allowing additional volumes of formation fluid to enter the well. A larger gas influx creates a taller annular bubble height, reducing annular hydrostatic head and driving S I C P SICP S I CP to dangerous levels that risk fracturing the casing shoe.
Important
The hard shut-in is the method taught at IWCF Level 2 and used by most operators. It gives the smallest influx volume, the lowest shut-in casing pressure and casing-shoe stress, and the simplest sequence, but always follow the rig's written shut-in procedure.
Line-Ups Before Drilling and Tripping
A hard shut-in only works if the manifolds are already lined up correctly. Level 2 candidates must be able to identify simple line-ups from a diagram:
Item Line-up while drilling or tripping (hard shut-in) Why
Choke-line valves at the BOP Inner manual valve open; outer hydraulic (HCR) valve closed Opening the HCR after the BOP closes is the step that connects the well to the choke manifold
Choke manifold One flow path lined up from the choke line through an adjustable choke to the mud-gas separator; that choke closed ; other paths isolated The well is shut in against a closed choke and can be circulated as soon as the kill starts
Casing pressure gauge In service and readable at the remote choke panel Shut-in casing pressure can be read immediately
Kill line Kill-line valves closed Prevents an unintended flow path from the well
Standpipe manifold Mud pump lined up to the standpipe and drill string; bleed-off and cement-unit valves closed; standpipe gauge in service Drill pipe pressure can be read and the pumps used for the kill
Trip tank (when tripping) Lined up to the well, with the hole-fill pump and return line set Hole fill and gains are measured stand by stand
Standardized Shut-In Procedure While Drilling
When a positive kick indicator is recognized while rotary or top-drive drilling, the Driller must execute the following sequence immediately:
Stop Rotary Table or Top Drive: Cease drill string rotation to protect equipment and eliminate mechanical agitation.
Pick Up Off Bottom & Space Out: Raise the traveling block until the nearest tool joint is spaced out safely above the BOP stack ram cavities and annular packing element.
Stop Mud Pumps: Disengage mud pumps to isolate circulating friction from hydrostatic pressure.
Close Designated BOP: Actuate the annular preventer (or upper pipe ram) to seal the annulus.
Open Choke Line HCR Valve: Open the hydraulic fail-safe valve against the closed remote choke to direct wellbore pressure to choke console transmitters.
Confirm Well is Fully Shut In: Inspect flowline to verify zero flow.
Notify Supervisors: Inform the Toolpusher, Rig Superintendent, and Company Representative.
Record Stabilized Pressures: Monitor and log stabilized S I D P P SIDPP S I D PP , S I C P SICP S I CP , and active pit volume gain.
A positive kick indicator is not checked again before closing the BOP (Section 4.1). Only a warning sign calls for a flow check first (Section 4.2).
Tool Joint Space-Out Management
Before closing any preventer, the Driller must ensure tool joints are not positioned across ram cavities. Closing a pipe ram across a heavy tool joint prevents ram closure, damages ram elastomer seals, bends the drill pipe, and causes catastrophic seal failure. Rigs utilize physical space-out marks or laser position sensors on the mast to guide the Driller.
Standardized Shut-In Procedure While Tripping Pipe
Many kicks are taken while tripping, through swabbing and failure to keep the hole full. When a kick occurs during tripping, the crew must execute the tripping shut-in protocol:
Set Drill Pipe in Slips: Position the nearest tool joint at an ergonomic working height above the rotary table.
Stab Full Opening Safety Valve (FOSV / TIW Valve) in OPEN Position: The FOSV must be stabbed open to allow fluid flow through its bore without hydraulic resistance.
Close the FOSV: Turn the ball valve 90° with the operating wrench to seal the drill pipe bore.
Close Designated BOP: Actuate the annular preventer or pipe rams to seal the annulus.
Open Choke Line HCR Valve: Line up pressure to the closed remote choke.
Install Inside BOP (IBOP / Gray Valve) when directed: Make up the spring-loaded non-return valve on top of the closed FOSV.
Re-Open the FOSV: Opening the FOSV allows drill pipe pressure to transmit to surface gauges while the IBOP prevents upward flow.
Confirm Shut-In & Record Data: Verify zero flow, notify supervisors, and log stabilized pressures and pit gain.
Standardized Shut-In Procedure When Out of Hole
If the well begins flowing when drill pipe is completely out of the hole:
Close Blind Rams or Blind Shear Rams Immediately: Actuate the blind rams from the rig floor console to establish a heavy-duty metal-to-rubber seal across the open hole diameter.
Open Choke Line HCR Valve: Route pressure to the closed remote choke gauge.
Confirm Shut-In: Verify flowline returns have ceased completely.
Notify Supervisors & Monitor Pressure: Record casing pressure buildup. Because no drill string is present, S I D P P SIDPP S I D PP is absent; the well is controlled by volumetric methods and lubrication, by bullheading, or by stripping pipe back into the well, as the supervisor directs.
Warning
Never close pipe rams on an open hole without pipe present. Pipe rams will over-travel, ruin elastomer packing blocks, and fail to seal. Blind rams or blind shear rams are the only preventers engineered to seal an open wellbore.
Responsibilities of the Driller and the Crew
Driller: detects or is told about the kick, carries out the shut-in, has authority to shut in without asking permission, and informs the toolpusher and company representative.
Floor crew (roughnecks, assistant driller): stab and close the safety valve when tripping, check the flowline for flow after shut-in, and stand by for instructions.
Derrickman and pit crew: watch pit and trip-tank levels, report changes immediately, and prepare to mix kill mud.
Mud logger and other service crews: report gains, flow changes, drilling breaks and gas trends to the Driller and keep recording data.
Everyone: report anything abnormal to the Driller at once and go to assigned positions; a shut-in well is never left unmonitored.
Driller's Autonomous Shut-In Authority
Modern safety culture establishes the Driller's Absolute Shut-In Authority :
The Driller has full authority to shut in the well immediately upon detecting any kick indicator or ambiguous flow anomaly.
No Supervisory Approval Required: The Driller must never delay shut-in to seek managerial concurrence. Delayed shut-in has been a primary root cause of landmark blowout disasters.
Safety Over NPT: If the Driller shuts in on a suspected influx and the well proves static, the Driller is commended for proactive barrier vigilance rather than criticized for non-productive time.