Study guide
LOT/FIT Graphs and the Pressure Window
IWCF Level 3 Drilling Well Control Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Exam Overview
Well Control Incidents and Their Consequences Qualification, Assessment and Study Planning
2 Hydrostatic Pressure and the Circulating System
Hydrostatic Pressure, Fluid Gradients, and Mud Weight Multiple Fluid Columns and Inverse Hydrostatic Calculations U-Tube Principle, Dynamic Pressure Losses, and Equivalent Circulating Density
3 Formation Pressure and Integrity Limits
Formation Pore Pressure, Normal vs Abnormal Pressure, and Fracture Gradient LOT/FIT Graphs and the Pressure Window MAASP, Kick Tolerance, and Formation Breakdown
4 Barriers and Risk Management
Well Barrier Concepts: Primary, Secondary, and Composite Envelopes Barrier Verification, Monitoring, and Life Cycle Management Well Control Risk Assessment, Human Factors, and Management of Change
5 Fluid Density and Circulation Data
Insufficient Mud Density & Encountering Abnormal Pressures Barite Weighting and Pump-Pressure Changes Pre-Recorded Data, Pump Output, and Slow Circulating Rates
6 Trip Preparation and Pressure Support
Swabbing and Surging During Tripping Operations Slugs, Trip Margin and Pumping Out Unfilled-Hole Limits and Tubular Displacement
7 Trip Monitoring and Connections
Hole Fill Failure and Trip Tank Monitoring Procedures Trip Tanks, PVT Systems, and Flow Return Sensors Kick Indicators During Tripping, Connections, and Out of Hole
8 Kick Warnings and Indicators
Flow Checks and Drilling Breaks Primary Kick Indicators While Drilling Lost Circulation and Loss of Hydrostatic Head
9 Influx Characteristics and Behaviour
Influx Types (Gas, Oil, Salt Water) & Influx Density Determination Gas Solubility in Oil-Based Mud vs Water-Based Mud
10 Gas Expansion and Closed-Well Migration
Gas Physics: Boyle's Law, Expansion, and Migration Velocities Gas Migration in a Shut-In Well & Pressure Buildup Effects
11 Surface Shut-In and Pressure Interpretation
Hard Shut-In vs Soft Shut-In Philosophies & Principles Surface BOP Shut-In Protocols (Drilling, Tripping, Wireline/Out of Hole) Post Shut-In Pressure Stabilization & Data Recording
12 Subsea, Wireline and Stripping Response
Subsea BOP Shut-In Protocols & Space-Out Procedures Wireline Displacement and Pressure-Control Equipment Annular and Ram-to-Ram Stripping
13 Kill-Sheet Calculations
Calculating Kill Mud Weight, ICP, and FCP Drill String/Annular Volumes, Strokes to Bit, and Circulating Times
14 Circulating Kill Methods
The Driller's Method: Detailed Two-Circulation Procedure The Wait and Weight Method & Step-Down Pressure Graphs Comparison of Constant Bottomhole Pressure Methods
15 Special Pressure-Control Methods
Volumetric Method, Lubricate and Bleed, and Bullheading Subsea CLF: Startup, Shutdown and Fluid Displacement
16 Casing and Cementing Well Control
Running Casing: Floats, Clearances and Volumes Cementing: Pressure Profile and Barrier Quality Casing Shut-In and Assembly Readiness
17 Drills and Equipment First Actions
Well Control Drills and Operational Checklists Gauge Failure and BOP Leak First Actions Bit Nozzle Plugging and Mud Pump Failure During a Kill
18 Operational Contingencies
Drill String Washout and Parted Pipe Management Severe Lost Circulation and Underground Blowout Scenarios Gas at Surface, Hydrate Formation, and Diverter Operations
19 Preventer Capabilities
Annular Preventers: Design, Operation, and Stripping Use Pipe Rams and Variable Bore Rams (VBRs) Blind Rams, Shear Rams, and Casing Shear Rams
20 Stack, Connections and Flow Routes
Surface BOP Stack Arrangements, API Specifications, and Outlets Ram Locking Mechanisms and Wellhead Connectors Choke and Kill Lines, Valves, and Pressure Ratings Choke Manifolds, Remote Chokes, and Manual Adjustable Chokes
21 Diverters and Auxiliary Equipment
Shallow Gas and Diverter Response Mud/Gas Separators (Poor Boy Degassers): Liquid Seal & Blow-Through Vacuum Degassers, Desanders, Desilters, and Rig Gas Detectors Drill String Safety Valves, Gray Valves, and Float Valves
22 Hydraulic Control Systems
Accumulator Unit Components: Reservoir, Fluid, and Pumps Accumulator Bottles, Nitrogen Precharge, and Operating Pressures Regulators, Pilot Circuits, and Manifold/Annular Pressure Control Stored Capacity, Accumulator Drawdown Tests and Remote Panels
23 Testing and Subsea Systems
Low-Pressure and High-Pressure BOP Testing Criteria Function Testing, Test Frequencies, and Test Tools Subsea BOP Architecture, LMRP, MUX Control, and Choke Line Friction Subsea Riser Margin, Gas in Riser, and Emergency Disconnect
LOT/FIT Graphs and the Pressure Window
Key Takeaways Explain This Topic AI
A FIT verifies a target pressure; a LOT seeks leak-off behaviour.
Use the approved graph interpretation rather than automatically choosing peak pressure.
MAASP depends on accepted weak-point pressure and the actual hydrostatic head above that point.
Dynamic pressure limits also depend on influx location and circulating friction.
Last updated: October 2026
Two tests with different endpoints
A formation integrity test, or FIT, demonstrates that an exposed formation and shoe system can sustain a predetermined test pressure without evidence of unacceptable leak-off. It normally stops at that target. It establishes a tested lower bound for integrity, not the exact fracture pressure. A leak-off test, or LOT, seeks the point where fluid begins entering the formation as pumping continues. Leak-off can involve opening a fracture, existing fractures or permeable paths. Treating every LOT endpoint as an exact natural fracture pressure overstates what was observed.
The well programme defines the objective, test limits, hole preparation and acceptance criteria. The exposed interval, fluid density, fluid condition, gauge location and line-up must be known. Pump slowly at the specified rate, record pressure against volume or time, and observe the volume returned on controlled bleed-off. A hesitation procedure uses pauses; a continuous procedure pumps without those pauses. Use the authorised method and its interpretation rather than changing methods midway because the graph is inconvenient.
Read the shape before selecting the number
At first, pressure generally rises approximately linearly with pumped volume as the closed system compresses and expands elastically. A persistent deviation from that line can indicate leak-off. A single erratic point may instead be a pump, gauge or line-up problem. Check the record and the test conditions. The largest pressure observed is not automatically the correct pressure to use for the allowable pressure calculation; the approved interpretation may select an earlier leak-off point and include a margin.
Consider this simplified LOT record for a vertical shoe at 4,000 ft with 10.0 ppg test mud:
- Cumulative volume Surface pressure
- 0.5 bbl 100 psi
- 1.0 bbl 200 psi
- 1.5 bbl 300 psi
- 2.0 bbl 400 psi
- 2.5 bbl 450 psi
- 3.0 bbl 470 psi
The first four points follow a 200 psi/bbl trend. The later increments are smaller. If the approved interpretation selects 400 psi as the usable leak-off pressure, use 400, not the peak of 470. This training table demonstrates interpretation; an actual acceptance decision needs the complete test record, equipment checks and the responsible supervisor's approval.
Convert the accepted pressure into a fluid-density limit
Hydrostatic pressure at the shoe during this test is 0.052 × 10.0 × 4,000 = 2,080 psi. Adding the accepted 400 psi surface pressure gives a test-derived shoe pressure of 2,480 psi. The corresponding equivalent mud weight is 2,480 ÷ (0.052 × 4,000) = 11.923 ppg. Equivalently, add 400 ÷ 208 = 1.923 ppg to the 10.0 ppg test density. This is the test-derived limit before any programme-required reduction or allowance.
If the current homogeneous mud above the shoe is 10.8 ppg, its shoe head is 2,246.4 psi. The corresponding static MAASP is 2,480 − 2,246.4 = 233.6 psi. Increasing the mud density to 11.3 ppg reduces this simplified static MAASP to 129.6 psi. Recalculate when the fluid above the weak point changes. The mud at the bit cannot be used as a substitute for the actual fluid profile above the shoe.
A FIT example and its limitation
Suppose another programme specifies a FIT to an equivalent density of 12.0 ppg at the same 4,000 ft shoe with 10.0 ppg mud. The target surface pressure is (12.0 − 10.0) × 0.052 × 4,000 = 416 psi. If the test reaches and satisfies the target criteria, the system has demonstrated integrity at that pressure under the test conditions. It has not demonstrated that fracture occurs at 416 psi. Continuing until the formation breaks would change the test objective and requires authorisation.
Use the window during an operation
The lower pressure limit comes from the formation-pressure prognosis, with the relevant operational margin. The upper limit comes from the weakest exposed formation or other binding integrity limit. Both carry uncertainty. At shallow depth below a subsea wellhead, increased water depth can leave a small formation overburden contribution and a narrow operating window; the same surface pressure can be significant relative to formation strength. Use pressure at the weak point rather than depth alone to assess this risk.
Static MAASP is a useful reference for a specified fluid profile. During a kill, influx position, fluid interfaces and friction change the relationship between surface pressure and pressure at the weak point. A surface pressure above the original mud-only MAASP does not by itself reveal the complete downhole profile, and a pressure below it does not guarantee every formation is safe. Monitor the approved dynamic limits, predicted pressures, returns and volumes. A fall in returns combined with unexpected pressure behaviour requires immediate communication and the approved contingency response.