1 Exam Overview

Well Control Incidents and Their Consequences Qualification, Assessment and Study Planning

2 Hydrostatic Pressure and the Circulating System

Hydrostatic Pressure, Fluid Gradients, and Mud Weight Multiple Fluid Columns and Inverse Hydrostatic Calculations U-Tube Principle, Dynamic Pressure Losses, and Equivalent Circulating Density

3 Formation Pressure and Integrity Limits

Formation Pore Pressure, Normal vs Abnormal Pressure, and Fracture Gradient LOT/FIT Graphs and the Pressure Window MAASP, Kick Tolerance, and Formation Breakdown

4 Barriers and Risk Management

Well Barrier Concepts: Primary, Secondary, and Composite Envelopes Barrier Verification, Monitoring, and Life Cycle Management Well Control Risk Assessment, Human Factors, and Management of Change

5 Fluid Density and Circulation Data

Insufficient Mud Density & Encountering Abnormal Pressures Barite Weighting and Pump-Pressure Changes Pre-Recorded Data, Pump Output, and Slow Circulating Rates

6 Trip Preparation and Pressure Support

Swabbing and Surging During Tripping Operations Slugs, Trip Margin and Pumping Out Unfilled-Hole Limits and Tubular Displacement

7 Trip Monitoring and Connections

Hole Fill Failure and Trip Tank Monitoring Procedures Trip Tanks, PVT Systems, and Flow Return Sensors Kick Indicators During Tripping, Connections, and Out of Hole

8 Kick Warnings and Indicators

Flow Checks and Drilling Breaks Primary Kick Indicators While Drilling Lost Circulation and Loss of Hydrostatic Head

9 Influx Characteristics and Behaviour

Influx Types (Gas, Oil, Salt Water) & Influx Density Determination Gas Solubility in Oil-Based Mud vs Water-Based Mud

10 Gas Expansion and Closed-Well Migration

Gas Physics: Boyle's Law, Expansion, and Migration Velocities Gas Migration in a Shut-In Well & Pressure Buildup Effects

11 Surface Shut-In and Pressure Interpretation

Hard Shut-In vs Soft Shut-In Philosophies & Principles Surface BOP Shut-In Protocols (Drilling, Tripping, Wireline/Out of Hole) Post Shut-In Pressure Stabilization & Data Recording

12 Subsea, Wireline and Stripping Response

Subsea BOP Shut-In Protocols & Space-Out Procedures Wireline Displacement and Pressure-Control Equipment Annular and Ram-to-Ram Stripping

13 Kill-Sheet Calculations

Calculating Kill Mud Weight, ICP, and FCP Drill String/Annular Volumes, Strokes to Bit, and Circulating Times

14 Circulating Kill Methods

The Driller's Method: Detailed Two-Circulation Procedure The Wait and Weight Method & Step-Down Pressure Graphs Comparison of Constant Bottomhole Pressure Methods

15 Special Pressure-Control Methods

Volumetric Method, Lubricate and Bleed, and Bullheading Subsea CLF: Startup, Shutdown and Fluid Displacement

16 Casing and Cementing Well Control

Running Casing: Floats, Clearances and Volumes Cementing: Pressure Profile and Barrier Quality Casing Shut-In and Assembly Readiness

17 Drills and Equipment First Actions

Well Control Drills and Operational Checklists Gauge Failure and BOP Leak First Actions Bit Nozzle Plugging and Mud Pump Failure During a Kill

18 Operational Contingencies

Drill String Washout and Parted Pipe Management Severe Lost Circulation and Underground Blowout Scenarios Gas at Surface, Hydrate Formation, and Diverter Operations

19 Preventer Capabilities

Annular Preventers: Design, Operation, and Stripping Use Pipe Rams and Variable Bore Rams (VBRs) Blind Rams, Shear Rams, and Casing Shear Rams

20 Stack, Connections and Flow Routes

Surface BOP Stack Arrangements, API Specifications, and Outlets Ram Locking Mechanisms and Wellhead Connectors Choke and Kill Lines, Valves, and Pressure Ratings Choke Manifolds, Remote Chokes, and Manual Adjustable Chokes

21 Diverters and Auxiliary Equipment

Shallow Gas and Diverter Response Mud/Gas Separators (Poor Boy Degassers): Liquid Seal & Blow-Through Vacuum Degassers, Desanders, Desilters, and Rig Gas Detectors Drill String Safety Valves, Gray Valves, and Float Valves

22 Hydraulic Control Systems

Accumulator Unit Components: Reservoir, Fluid, and Pumps Accumulator Bottles, Nitrogen Precharge, and Operating Pressures Regulators, Pilot Circuits, and Manifold/Annular Pressure Control Stored Capacity, Accumulator Drawdown Tests and Remote Panels

23 Testing and Subsea Systems

Low-Pressure and High-Pressure BOP Testing Criteria Function Testing, Test Frequencies, and Test Tools Subsea BOP Architecture, LMRP, MUX Control, and Choke Line Friction Subsea Riser Margin, Gas in Riser, and Emergency Disconnect

Annular and Ram-to-Ram Stripping

Key Takeaways Explain This Topic AI

Stripping transfers pipe through qualified barriers while preserving pressure control.

Account for pipe displacement separately from migration-related bleeding.

Annular closing pressure and ram transfer sequences are equipment-specific.

Stop and secure on unexpected pressure, volume, load or leakage.

Last updated: October 2026

Purpose and prerequisites

Stripping moves pipe through closed well control equipment while retaining pressure containment. It can be used to return a string toward bottom after an influx is detected off bottom, so that the influx can be circulated out through the approved route. It is a supervised pressure-and-volume operation, not ordinary tripping with a BOP accidentally left closed. The string must be suitable for movement through the selected elements and the pressure, force, displacement and gas-migration limits must be known.

Before stripping, secure the well, record pressures and influx information, establish the required internal string barrier and prepare the trip tank, choke and approved monitoring route. Confirm annular or ram stripping capability, closing-pressure instructions, tool-joint positions, pressure ratings and the pipe's tendency to move upward or downward under pressure. A lightweight string under high pressure can experience an upward force requiring qualified handling equipment. Do not assume pipe weight alone will control movement.

Volume balance preserves bottomhole pressure

Pipe entering the closed well displaces fluid. If that displaced volume has no controlled outlet, pressure can rise and load the weak formation. If too much is released, bottomhole pressure can fall and admit more influx. Gas migration can change the required pressure independently of pipe movement. Keep records of pipe displacement and migration-related bleed volumes separately, with the approved reference pressure and margins.

For a training case with closed-end displacement of 0.0240 bbl/ft, stripping 90 ft into the well displaces 2.16 bbl. That is the pipe-entry volume to account for under the stated geometry. If 3.00 bbl is actually collected, the unexplained 0.84 bbl requires investigation; it cannot automatically be labelled gas migration. The correct displacement may change at a BHA or when an internal valve configuration changes. Use the agreed displacement factor for each item and the actual tank readings.

Annular stripping

A qualified annular element may permit tool joints to pass while maintaining a seal. The closing pressure should be selected from the manufacturer's data for the well pressure, tubular size and stripping duty. Excessive closing pressure accelerates element wear and can damage the tubular; insufficient pressure permits leakage. Adjust at the specified times and monitor seal performance. The presence of an annular BOP alone does not prove every tool joint, cable or BHA can pass under pressure.

Move at the instructed slow rate and coordinate with the choke operator to account for displacement while preserving the required bottomhole pressure. Watch the pressure trend, tank volume, pipe load and leakage. Pause at planned positions for checks. A controlled leak past an element is acceptable only if explicitly part of the approved stripping arrangement and safely routed; unplanned gas at the drill floor is a failure requiring the contingency response. Never treat packing wear as a reason to continue at higher speed.

Ram-to-ram stripping

Ram-to-ram stripping uses appropriately spaced, qualified ram sets to move a tool joint through the stack while retaining at least the required containment. The sequence depends on the actual stack drawing and pipe spacing. Tool joints must clear the ram that is about to close, and the chamber between rams must have a controlled equalising and bleed route. Before opening a barrier exposed to differential pressure, equalise as instructed; before transferring containment, verify the receiving ram is closed and sealing.

In a conceptual cycle, one suitable ram contains the well while the other is open to allow the joint to move into the chamber. Stop at the documented space-out point, close and verify the receiving ram, then equalise the isolated chamber for the next transfer before opening the first ram. Continue the prescribed cycle as the joint passes. This explanation shows the barrier-transfer principle; the exact valve positions and order come from the installed system's procedure. Opening both rams together would defeat that principle.

Limits and complications

Stripping can be limited by annular wear, non-sealable diameters, inadequate ram spacing, tool joints, insufficient closing pressure, pressure-induced pipe force, internal influx, hydrates, restrictions and weak-point pressure. A non-shearable BHA may remove an emergency closure option while crossing the stack. Identify it before movement and use the approved risk controls. Pipe loads and hang-off ratings must be qualified for the actual ram and joint.

Gas in a horizontal section may migrate little until swept into a vertical interval. Moving the string and displacing fluid can change its location and pressure effect. Do not assume the original shut-in pressure remains an adequate reference throughout an uncontrolled sequence. The supervisor directs the combined stripping and volumetric plan and the eventual circulation method.

First actions when the plan departs

If pressure, leakage, displacement or load deviates from the plan, stop pipe movement and communicate. Secure the well with the available approved barrier and retain the record of cumulative movement and collected fluid. Do not reset tank totals to conceal a mismatch. A safe stopping point is part of the plan, as is the alternative if an annular or ram fails. Reaching bottom is useful only if the operation preserves containment and the formation pressure window on the way there.

Stripping controls

  • Item Interpretation
  • Annular Qualified element, closing pressure and joint passage
  • Ram-to-ram Verified receiving barrier and chamber equalisation
  • Both Measured displacement, controlled pressure and stop conditions