Study guide
6.2 Kill Mud Weight (KMW), Initial Circulating Pressure (ICP) & Final Circulating Pressure (FCP)
IWCF Level 4 Drilling Well Control Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Hydrostatic Pressure, Formation Pressure & Wellbore Mechanics
1.1 Hydrostatic Pressure, Mud Weight & Pressure Gradients 1.2 Formation Pore Pressure, Overburden & Fracture Gradient 1.3 U-Tube Concept, ECD & Circulating Friction Losses 1.4 Dynamic Well Pressures, Surge & Swab Effects
2 Chapter 2: Barrier Philosophy, Well Integrity & Human Factors
2.1 The Well Barrier Envelope Concept & Barrier Element Acceptance Criteria 2.2 Well Integrity Monitoring & Leak Detection Standards 2.3 Human Factors, Situational Awareness & Crew Communication in Well Control
3 Chapter 3: Causes of Kicks & Lost Circulation
3.1 Failure to Keep Hole Full, Swabbing & Abnormal Formation Pressure 3.2 Insufficient Fluid Density & Annular Gas Cut Mud Mechanisms 3.3 Lost Circulation, Underground Blowouts & Crossflow Mechanics
4 Chapter 4: Kick Detection, Warning Signs & Shut-in Protocols
4.1 Positive Kick Indicators vs Warning Signs While Drilling 4.2 Kick Detection While Tripping, Flow Checks & Trip Sheet Interpretation 4.3 Hard vs Soft Shut-in Procedures for Surface and Subsea Rigs 4.4 Diverter Operations & Shallow Gas Hazard Management
5 Chapter 5: Influx Mechanics & Gas Behavior
5.1 Influx Characteristics, Gas Solubility & Bubble Point in OBM vs WBM 5.2 Gas Migration Without Circulation & Surface Pressure Buildup 5.3 Gas Expansion, Boyle's Law & Peak Annular Surface Pressures
6 Chapter 6: Well Control Calculations & Kill Sheet
6.1 Shut-In Pressures (SIDPP, SICP) & Influx Height / Gradient 6.2 Kill Mud Weight (KMW), Initial Circulating Pressure (ICP) & Final Circulating Pressure (FCP) 6.3 Drillpipe Pressure Step-Down Schedule & Strokes to Bit / Annulus 6.4 Maximum Allowable Annular Surface Pressure (MAASP) & Casing Shoe Integrity
7 Chapter 7: Constant Bottom Hole Pressure Kill Methods
7.1 The Driller's Method: Two-Circulation Procedure & Detailed Pressure Behavior 7.2 The Wait-and-Weight Method: Single-Circulation Procedure & Comparison 7.3 Choke Manipulation, Drillpipe Gauge Lag Time & Pumping Rate Adjustments 7.4 Well Control Complications: Plugged Nozzles, Washouts & Pump Failure
8 Chapter 8: Volumetric, Stripping & Contingency Methods
8.1 Volumetric Method: Static and Dynamic Gas Migration Control 8.2 Lubricate and Bleed Operations for Surface Pressure Removal 8.3 Stripping and Snubbing Drillstring Under Pressure 8.4 Bullheading Operations & Emergency Off-Bottom Well Control
9 Chapter 9: Blowout Preventers & Associated Rig Equipment
9.1 Annular Preventers: Design, Closing Ratios, Stripping Pressure & Element Selection 9.2 Ram Preventers: Pipe Rams, Variable Bore, Blind Shear Rams & Locking Devices 9.3 Choke Manifolds, Remote Chokes, Buffer Tanks & Articulated Lines 9.4 Mud-Gas Separators, Vacuum Degassers & Drillstring Valves
10 Chapter 10: Control Systems, Testing Standards & Subsea Systems
10.1 Hydraulic Accumulator Closing Units: Sizing, Precharge & API Standard 53 10.2 Hydraulic Control Circuits, Remote Operating Panels & Secondary Controls 10.3 BOP Testing Standards: Low/High Pressure Testing, Function Tests & Drawdown Verification 10.4 Subsea Well Control Equipment: Choke Line Friction, Riser Margin & Multiplex (MUX) Systems
11 Chapter 11: Well Control Incidents, Training & Accreditation
11.1 Major Well Control Incidents & Lessons Learned 11.2 Incident Impact on Personnel, Assets, Environment & Reputation 11.3 Well Control Training, Competence Assurance & Regulatory Framework
12 Chapter 12: Well Control During Casing & Liner Operations
12.1 Surge and Swab Pressure Dynamics During Casing Running 12.2 Casing Fill-Up, Auto-Fill Equipment & Float Valve Integrity 12.3 Casing Float Failure Calculations & Wellbore Fluid Level Loss
13 Chapter 13: Cementing Operations & Pressure Profile Management
13.1 Hydrostatic Pressure Profiles During Cement Pumping & Free-Fall (U-Tubing) 13.2 Gas Migration Mechanisms During Cement Hydration & Gel Strength Development 13.3 Shoe Track Integrity, Backpressure Verification & Cement Barrier Evaluation
14 Chapter 14: Casing Shut-in Procedures & Wireline Pressure Control
14.1 Shut-In Procedures While Running Casing or Liners 14.2 Wireline Well Control: Pressure Effects, Lubricators & Stuffing Boxes 14.3 Wireline BOPs, Chemical Injection & Emergency Wireline Shut-In
15 Chapter 15: Well Control Drills, Response Protocols & Crew Management
15.1 Pit Drills, Trip Drills & Rig Floor Response Timing 15.2 Choke Drills & Pressure Gauge Monitoring Drills 15.3 Supervisor Evaluation, Drill Debriefing & Competency Tracking
16 Chapter 16: Contingency Planning, Equipment Complications & Gauge Diagnostics
16.1 Malfunctioning Pressure Gauge Diagnostics & Trapped Pressure Recognition 16.2 Plugged Drillpipe Nozzles, Float Failures & Drillstring Washouts 16.3 Choke Plugging, Choke Washouts & Choke Manifold Switching 16.4 Hydrate Formation in Subsea Choke Lines & Remediation Strategies
17 Chapter 17: BOP Stack Outlets, Connections & Manifold Hardware
17.1 BOP Side Outlet Valves: Placement, Drilling Spools & HCR Operation 17.2 End Connections, Ring Gaskets (RX/BX) & Flange Make-up Torque 17.3 Choke and Kill Line Routing, Articulated Joints & Flexible Lines
18 Chapter 18: Advanced Well Control: Horizontal & Extended Reach Wells
18.1 Influx Behavior and Hydrostatic Balance in Horizontal Lateral Sections 18.2 Shut-In Pressure Interpretation in Horizontal Wells 18.3 Constant BHP Circulating Kill Procedures for Horizontal Wells
6.2 Kill Mud Weight (KMW), Initial Circulating Pressure (ICP) & Final Circulating Pressure (FCP)
Key Takeaways Explain This Topic AI
Kill Mud Weight (KMW) is the fluid density required to balance formation pore pressure with zero surface pressure: KMW = OMW + [SIDPP / (0.052 × TVD)] in oilfield units, or KMW (kg/m³) = OMW (kg/m³) + [(SIDPP_kPa × 1000) / (9.81 × TVD_m)] in SI units, and must always be rounded up to the nearest 0.1 ppg (or 0.01 SG / 10 kg/m³).
Slow Circulating Rate (SCR) pressure (P_scr) must be measured on each shift, for each active pump, and after every mud property or BHA change to establish the baseline circulating friction for well control.
Initial Circulating Pressure (ICP = SIDPP + P_scr) is the standpipe pressure required at the start of circulation at the kill rate with original mud weight, maintaining bottomhole pressure equal to formation pressure.
Final Circulating Pressure (FCP = P_scr × KMW / OMW) is the standpipe pressure required once kill mud reaches the bit, reflecting the higher hydraulic friction of the denser kill fluid circulating through the drillstring and nozzles.
Last updated: November 2026
Once stabilized shut-in pressures are verified and recorded, the drilling supervisor must calculate the three primary circulating control parameters: Kill Mud Weight (KMW) , Initial Circulating Pressure (ICP) , and Final Circulating Pressure (FCP) . These values form the mathematical backbone of all Constant Bottom Hole Pressure (CBHP) kill operations.
Principles and Derivation of Kill Mud Weight (KMW)
Kill Mud Weight is defined as the exact fluid density required to exert a static hydrostatic pressure equal to formation pore pressure ( P form P_{\text{form}} P form ) throughout the vertical depth of the wellbore, thereby reducing surface shut-in drillpipe pressure to zero ( 0 psi 0\text{ psi} 0 psi ):
P form = 0.052 × KMW × TVD P_{\text{form}} = 0.052 \times \text{KMW} \times \text{TVD} P form = 0.052 × KMW × TVD
Recalling that formation pore pressure was established from the drillstring manometer:
P form = ( 0.052 × OMW × TVD ) + SIDPP P_{\text{form}} = (0.052 \times \text{OMW} \times \text{TVD}) + \text{SIDPP} P form = ( 0.052 × OMW × TVD ) + SIDPP
Equating the two expressions:
0.052 × KMW × TVD = ( 0.052 × OMW × TVD ) + SIDPP 0.052 \times \text{KMW} \times \text{TVD} = (0.052 \times \text{OMW} \times \text{TVD}) + \text{SIDPP} 0.052 × KMW × TVD = ( 0.052 × OMW × TVD ) + SIDPP
Dividing both sides by ( 0.052 × TVD ) (0.052 \times \text{TVD}) ( 0.052 × TVD ) yields the standard oilfield Kill Mud Weight formula:
KMW (ppg) = OMW (ppg) + SIDPP (psi) 0.052 × TVD (ft) \text{KMW (ppg)} = \text{OMW (ppg)} + \frac{\text{SIDPP (psi)}}{0.052 \times \text{TVD (ft)}} KMW (ppg) = OMW (ppg) + 0.052 × TVD (ft) SIDPP (psi)
Metric and SI Unit Systems Derivation
In Metric unit systems (where density is in Specific Gravity SG \text{SG} SG or kg/L \text{kg/L} kg/L , pressure in bar \text{bar} bar , and depth in meters \text{meters} meters ):
KMW (SG) = OMW (SG) + SIDPP (bar) × 10.2 TVD (m) \text{KMW (SG)} = \text{OMW (SG)} + \frac{\text{SIDPP (bar)} \times 10.2}{\text{TVD (m)}} KMW (SG) = OMW (SG) + TVD (m) SIDPP (bar) × 10.2
(Derived from Δ P = ρ ⋅ g ⋅ h / 100 \Delta P = \rho \cdot g \cdot h / 100 Δ P = ρ ⋅ g ⋅ h /100 , where 1 / 0.0981 ≈ 10.194 ≈ 10.2 1 / 0.0981 \approx 10.194 \approx 10.2 1/0.0981 ≈ 10.194 ≈ 10.2 .)
In SI unit systems (where density is in kg/m 3 \text{kg/m}^3 kg/m 3 , pressure in kPa \text{kPa} kPa , and depth in meters \text{meters} meters ):
Since 1 kPa = 1000 Pa 1\text{ kPa} = 1000\text{ Pa} 1 kPa = 1000 Pa and Δ P = ρ ⋅ g ⋅ h \Delta P = \rho \cdot g \cdot h Δ P = ρ ⋅ g ⋅ h , converting SIDPP \text{SIDPP} SIDPP from kPa \text{kPa} kPa to Pascals ( Pa \text{Pa} Pa ) requires multiplying by 1000 1000 1000 :
KMW (kg/m 3 ) = OMW (kg/m 3 ) + SIDPP (kPa) × 1000 9.81 × TVD (m) \text{KMW (kg/m}^3\text{)} = \text{OMW (kg/m}^3\text{)} + \frac{\text{SIDPP (kPa)} \times 1000}{9.81 \times \text{TVD (m)}} KMW (kg/m 3 ) = OMW (kg/m 3 ) + 9.81 × TVD (m) SIDPP (kPa) × 1000
If shut-in drillpipe pressure is recorded in bar \text{bar} bar ( 1 bar = 100 , 000 Pa = 100 kPa 1\text{ bar} = 100,000\text{ Pa} = 100\text{ kPa} 1 bar = 100 , 000 Pa = 100 kPa ):
KMW (kg/m 3 ) = OMW (kg/m 3 ) + SIDPP (bar) × 100 , 000 9.81 × TVD (m) \text{KMW (kg/m}^3\text{)} = \text{OMW (kg/m}^3\text{)} + \frac{\text{SIDPP (bar)} \times 100,000}{9.81 \times \text{TVD (m)}} KMW (kg/m 3 ) = OMW (kg/m 3 ) + 9.81 × TVD (m) SIDPP (bar) × 100 , 000
Warning
A common industry calculation error is using a factor of 100 100 100 instead of 1000 1000 1000 when calculating kill density with SIDPP \text{SIDPP} SIDPP in kPa \text{kPa} kPa . Because 1 kPa = 1000 Pa 1\text{ kPa} = 1000\text{ Pa} 1 kPa = 1000 Pa , using 100 100 100 underestimates the required density increase tenfold, resulting in dangerous downhole underbalance.
The Operational Rounding Doctrine
Calculated KMW values rarely result in whole numbers. In well control engineering, supervisors must always round KMW UP to the nearest 0.1 ppg 0.1\text{ ppg} 0.1 ppg (or 0.01 SG 0.01\text{ SG} 0.01 SG / 10 kg/m 3 10\text{ kg/m}^3 10 kg/m 3 ) :
Example (Field Units): A calculated KMW of 12.31 ppg 12.31\text{ ppg} 12.31 ppg must be rounded to 12.4 ppg 12.4\text{ ppg} 12.4 ppg .
Example (SI Units): A calculated KMW of 1 , 501.9 kg/m 3 1,501.9\text{ kg/m}^3 1 , 501.9 kg/m 3 must be rounded to 1 , 510 kg/m 3 1,510\text{ kg/m}^3 1 , 510 kg/m 3 ( 1.51 SG 1.51\text{ SG} 1.51 SG ).
Rationale: Rounding down (e.g., to 12.3 ppg 12.3\text{ ppg} 12.3 ppg or 1 , 500 kg/m 3 1,500\text{ kg/m}^3 1 , 500 kg/m 3 ) leaves the well statically underbalanced by 0.01 ppg 0.01\text{ ppg} 0.01 ppg , which equates to a hydrostatic deficit of 5.2 psi 5.2\text{ psi} 5.2 psi per 10 , 000 ft TVD 10,000\text{ ft TVD} 10 , 000 ft TVD , allowing continued reservoir inflow upon shut-in.
Important
Always calculate Kill Mud Weight using True Vertical Depth (TVD). Using Measured Depth (MD) in a deviated well inflates the denominator, resulting in an erroneously low KMW that fails to balance formation pore pressure.
Slow Circulating Rate (SCR) and Reduced Circulating Pressure ( P scr P_{\text{scr}} P scr )
Kill operations are never conducted at normal drilling pump rates ( 80 − 140 spm 80 - 140\text{ spm} 80 − 140 spm ). Instead, the well is circulated out at a Slow Circulating Rate (SCR) , also termed the Kill Rate , typically between 20 and 40 spm 20\text{ and }40\text{ spm} 20 and 40 spm ( 1.5 to 3.5 bbl/min 1.5\text{ to }3.5\text{ bbl/min} 1.5 to 3.5 bbl/min ).
Operational Rationale for Slow Circulating Rates
Minimizing Annular Pressure Losses (APL): High circulating rates generate large frictional pressure losses in the annulus. This dynamic backpressure acts directly against the weak casing shoe, drastically increasing the risk of formation fracture and lost circulation.
Choke Operator Response Time: Gas expands rapidly as it nears surface. At low pump rates, the choke operator has ample reaction time to throttle the hydraulic choke smoothly without causing severe pressure surges.
Mud-Gas Separator Capacity: The installed MGS has a qualified gas/liquid throughput and vent-backpressure envelope. Use that equipment’s actual limits when selecting a kill rate. Excess flow or vent restriction can cause liquid carryover or gas blow-through; a generic gas-flow or liquid-flow range is not a capacity certificate.
Barite Mixing Capabilities: Weighting active mud up to KMW requires blending hundreds of sacks of barite per hour. Slow rates ensure the mud mixing hoppers can keep pace with mud volume requirements without density dips.
Regulatory and Company Mandates for Logging SCR
Slow circulating pump pressures ( P scr P_{\text{scr}} P scr ) must be taken and recorded on the active kill sheet:
- At the start of each drilling tour (shift);
- Whenever drilling fluid density, viscosity, or rheology is altered;
- After every bit change or BHA configuration modification;
- For each mud pump independently (Pump 1, Pump 2, and Pump 3);
Across at least two distinct kill speeds (e.g., 30 spm 30\text{ spm} 30 spm and 40 spm 40\text{ spm} 40 spm ).
Initial Circulating Pressure (ICP)
Initial Circulating Pressure is the total pump standpipe pressure required to circulate drilling fluid down the drillstring and up the annulus at the chosen kill rate while holding bottomhole pressure exactly equal to formation pore pressure:
- ICP = SIDPP + P scr \text{ICP} = \text{SIDPP} + P_{\text{scr}} ICP = SIDPP + P scr
- Physical Components of ICP
Static Component ( SIDPP \text{SIDPP} SIDPP ): The surface pressure required to compensate for the hydrostatic underbalance of the original mud weight relative to formation pressure.
Dynamic Component ( P scr P_{\text{scr}} P scr ): The dynamic friction loss generated by moving original mud through surface piping, drillpipe, drill collars, bit nozzles, and the annulus at the kill speed.
Coordinating Pump Startup with the Hydraulic Choke
The Driller and Choke Operator coordinate startup to preserve bottomhole pressure:
Confirm the selected flow rate, original SCR and pressure references before starting.
On a surface stack, holding initial SICP is the standard startup approximation when annular pressure losses are negligible. Account for significant return-path losses.
With subsea choke-line returns, lower the surface choke-pressure reference as CLF develops: initial dynamic casing pressure at kill rate = SICP - CLF. On slowdown, restore pressure as CLF disappears. Check the available pressure window before pumping.
Once rate and pressure stabilize, compare standpipe pressure with ICP and investigate discrepancies before following the method's circulating-pressure schedule. A static kill-line monitor avoids flowing-line friction, but its fluid head and gauge datum must be included.
Final Circulating Pressure (FCP)
When kill mud has completely displaced the original mud inside the drillstring from surface to bit, the drillpipe interior is filled with fluid of density KMW \text{KMW} KMW . Because the hydrostatic head of the kill mud balances formation pore pressure ( P hyd, kmw = P form P_{\text{hyd, kmw}} = P_{\text{form}} P hyd, kmw = P form ), the static surface overbalance requirement drops to zero ( 0 psi 0\text{ psi} 0 psi ).
The only pressure remaining on the standpipe gauge is the dynamic circulating friction of the heavier kill mud circulating through the drillstring and nozzles at the kill rate. This value is the Final Circulating Pressure (FCP) :
FCP = P scr × KMW OMW \text{FCP} = P_{\text{scr}} \times \frac{\text{KMW}}{\text{OMW}} FCP = P scr × OMW KMW
Fluid Dynamics Basis of the FCP Formula
The standard kill-sheet estimate scales the original SCR pressure by KMW/OMW at the same flow rate. It approximates the change in hydraulic losses as heavier mud replaces original mud; it is not an exact law for every rheology or flow regime. Changed fluid properties or equipment require the circulating-pressure reference to be checked and the approved schedule updated.
Note
Because kill mud is heavier than original mud, FCP \text{FCP} FCP is always slightly higher than the original slow circulating pressure ( P scr P_{\text{scr}} P scr ). If P scr = 650 psi P_{\text{scr}} = 650\text{ psi} P scr = 650 psi , OMW = 10.0 ppg \text{OMW} = 10.0\text{ ppg} OMW = 10.0 ppg , and KMW = 12.0 ppg \text{KMW} = 12.0\text{ ppg} KMW = 12.0 ppg , then FCP = 650 × ( 12.0 / 10.0 ) = 780 psi \text{FCP} = 650 \times (12.0 / 10.0) = 780\text{ psi} FCP = 650 × ( 12.0/10.0 ) = 780 psi .
Safety Margins, Overbalance & Trip Margins
In routine drilling, an overbalance of 100 to 200 psi 100\text{ to }200\text{ psi} 100 to 200 psi (or 0.2 to 0.5 ppg 0.2\text{ to }0.5\text{ ppg} 0.2 to 0.5 ppg trip margin) is maintained above pore pressure to prevent swabbing during pipe trips.
The Danger of Arbitrary Safety Margins During a Well Kill
During active well kill circulation, drilling supervisors must never add an uncalculated safety margin directly to KMW :
Adding + 0.5 ppg +0.5\text{ ppg} + 0.5 ppg increases kill-fluid hydrostatic head and the estimated FCP. It does not change the original ICP = SIDPP + original SCR. Recalculate the displacement schedule and formation-pressure margins before selecting a higher density.
In a narrow pressure window, extra density can exceed the weak formation's limit. Check the actual fluid profile and circulating losses rather than adding an arbitrary margin.
Once circulation is successfully completed, the well is checked for static flow ( 0 flow 0\text{ flow} 0 flow with choke open). If verified dead, a designated trip margin can be mixed and circulated under controlled conditions prior to tripping pipe.
- Worked Field Problems: Kill Sheet Circulating Parameters
- Problem 1: Oilfield Field Units (ppg, psi, ft)
- True Vertical Depth (TVD): 12 , 400 ft 12,400\text{ ft} 12 , 400 ft
- Measured Depth (MD): 14 , 100 ft 14,100\text{ ft} 14 , 100 ft
- Original Mud Weight (OMW): 11.5 ppg 11.5\text{ ppg} 11.5 ppg
- Stabilized SIDPP \text{SIDPP} SIDPP : 580 psi 580\text{ psi} 580 psi
- Stabilized SICP \text{SICP} SICP : 840 psi 840\text{ psi} 840 psi
- SCR at 30 spm 30\text{ spm} 30 spm ( P scr P_{\text{scr}} P scr ): 720 psi 720\text{ psi} 720 psi
- Step 1: Calculate Kill Mud Weight
KMW = 11.5 + 580 0.052 × 12 , 400 = 11.5 + 580 644.8 = 11.5 + 0.8995 = 12.3995 ppg \text{KMW} = 11.5 + \frac{580}{0.052 \times 12,400} = 11.5 + \frac{580}{644.8} = 11.5 + 0.8995 = 12.3995\text{ ppg} KMW = 11.5 + 0.052 × 12 , 400 580 = 11.5 + 644.8 580 = 11.5 + 0.8995 = 12.3995 ppg Rounding up to next 0.1 ppg 0.1\text{ ppg} 0.1 ppg : KMW = 12.4 ppg \text{KMW} = 12.4\text{ ppg} KMW = 12.4 ppg
Step 2: Calculate Initial Circulating Pressure
ICP = SIDPP + P scr = 580 + 720 = 1 , 300 psi \text{ICP} = \text{SIDPP} + P_{\text{scr}} = 580 + 720 = \mathbf{1,300\text{ psi}} ICP = SIDPP + P scr = 580 + 720 = 1 , 300 psi
Step 3: Calculate Final Circulating Pressure
FCP = 720 × 12.4 11.5 = 720 × 1.07826 = 776.35 psi ≈ 776 psi \text{FCP} = 720 \times \frac{12.4}{11.5} = 720 \times 1.07826 = 776.35\text{ psi} \approx \mathbf{776\text{ psi}} FCP = 720 × 11.5 12.4 = 720 × 1.07826 = 776.35 psi ≈ 776 psi
- Problem 2: International System of Units (SI: kg/m³, kPa, m)
- True Vertical Depth (TVD): 3 , 500 m 3,500\text{ m} 3 , 500 m
- Measured Depth (MD): 4 , 100 m 4,100\text{ m} 4 , 100 m
Original Mud Weight (OMW): 1 , 400 kg/m 3 1,400\text{ kg/m}^3 1 , 400 kg/m 3 ( 1.40 SG 1.40\text{ SG} 1.40 SG )
- Stabilized SIDPP \text{SIDPP} SIDPP : 3 , 500 kPa 3,500\text{ kPa} 3 , 500 kPa ( 35 bar 35\text{ bar} 35 bar )
- Stabilized SICP \text{SICP} SICP : 5 , 200 kPa 5,200\text{ kPa} 5 , 200 kPa ( 52 bar 52\text{ bar} 52 bar )
SCR at 30 spm 30\text{ spm} 30 spm ( P scr P_{\text{scr}} P scr ): 5 , 000 kPa 5,000\text{ kPa} 5 , 000 kPa ( 50 bar 50\text{ bar} 50 bar )
Step 1: Calculate Kill Mud Weight (SI)
Δ ρ = SIDPP (kPa) × 1000 9.81 × TVD (m) = 3 , 500 × 1000 9.81 × 3 , 500 = 3 , 500 , 000 34 , 335 = 101.94 kg/m 3 \Delta\rho = \frac{\text{SIDPP (kPa)} \times 1000}{9.81 \times \text{TVD (m)}} = \frac{3,500 \times 1000}{9.81 \times 3,500} = \frac{3,500,000}{34,335} = 101.94\text{ kg/m}^3 Δ ρ = 9.81 × TVD (m) SIDPP (kPa) × 1000 = 9.81 × 3 , 500 3 , 500 × 1000 = 34 , 335 3 , 500 , 000 = 101.94 kg/m 3 KMW = 1 , 400 + 101.94 = 1 , 501.94 kg/m 3 \text{KMW} = 1,400 + 101.94 = 1,501.94\text{ kg/m}^3 KMW = 1 , 400 + 101.94 = 1 , 501.94 kg/m 3 Rounding up to next 10 kg/m 3 10\text{ kg/m}^3 10 kg/m 3 (or 0.01 SG 0.01\text{ SG} 0.01 SG ) : KMW = 1 , 510 kg/m 3 \text{KMW} = 1,510\text{ kg/m}^3 KMW = 1 , 510 kg/m 3 ( 1.51 SG 1.51\text{ SG} 1.51 SG )
(Cross-check with Metric bar formula: KMW = 1.40 + 35 × 10.2 3 , 500 = 1.40 + 0.102 = 1.502 SG → 1.51 SG \text{KMW} = 1.40 + \frac{35 \times 10.2}{3,500} = 1.40 + 0.102 = 1.502\text{ SG} \rightarrow 1.51\text{ SG} KMW = 1.40 + 3 , 500 35 × 10.2 = 1.40 + 0.102 = 1.502 SG → 1.51 SG .)
Step 2: Calculate Initial Circulating Pressure
ICP = SIDPP + P scr = 3 , 500 kPa + 5 , 000 kPa = 8 , 500 kPa ( 85 bar ) \text{ICP} = \text{SIDPP} + P_{\text{scr}} = 3,500\text{ kPa} + 5,000\text{ kPa} = \mathbf{8,500\text{ kPa}} \quad (85\text{ bar}) ICP = SIDPP + P scr = 3 , 500 kPa + 5 , 000 kPa = 8 , 500 kPa ( 85 bar )
Step 3: Calculate Final Circulating Pressure
FCP = P scr × KMW OMW = 5 , 000 kPa × 1 , 510 1 , 400 = 5 , 000 × 1.07857 = 5 , 392.86 kPa ≈ 5 , 393 kPa ( 53.9 bar ) \text{FCP} = P_{\text{scr}} \times \frac{\text{KMW}}{\text{OMW}} = 5,000\text{ kPa} \times \frac{1,510}{1,400} = 5,000 \times 1.07857 = 5,392.86\text{ kPa} \approx \mathbf{5,393\text{ kPa}} \quad (53.9\text{ bar}) FCP = P scr × OMW KMW = 5 , 000 kPa × 1 , 400 1 , 510 = 5 , 000 × 1.07857 = 5 , 392.86 kPa ≈ 5 , 393 kPa ( 53.9 bar )