Study guide
1.2 Current Format, Cost, Time, and Passing Score
Journeyman Electrician Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Orientation and Source Control
1.1 ICC R17, T17, G17, and Jurisdiction Variance 1.2 Current Format, Cost, Time, and Passing Score 1.3 Licensing Board vs. Exam Provider 1.4 Official References, Open-Book Rules, and Calculators 1.5 Domain Weights and Study Map 1.6 Using the Practice Bank, Error Log, and NEC Index
2 Chapter 2: NEC Navigation, Definitions, and Code Strategy
2.1 NEC Book Structure and Article Map 2.2 Article 100 Definitions and Exam Language 2.3 Index, Table, and Annex Navigation 2.4 Shall, Shall Not, Permitted, and Informational Notes 2.5 Using Code References Without Overlooking Context 2.6 State Amendments and Code Edition Control 2.7 NEC Navigation Case Lab
3 Chapter 3: Electrical Theory and Calculation Foundations
3.1 Ohm's Law, Power, and Basic Units 3.2 Series, Parallel, and Circuit Behavior 3.3 Single-Phase, Three-Phase, and Voltage Systems 3.4 Continuous Loads, Demand, and 125 Percent Rules 3.5 Voltage Drop and Practical Calculation Setup 3.6 Load Calculation Workflow 3.7 Calculation Foundation Case Lab
4 Chapter 4: Services, Service Equipment, and Grounding/Bonding
4.1 Service Point, Service Conductors, and Disconnects 4.2 Service Load Calculation and Sizing 4.3 Service Equipment, Panelboards, and Switchboards 4.4 Grounding Electrode System and GEC 4.5 Bonding, Main Bonding Jumpers, and Effective Fault Path 4.6 Transformers and Separately Derived Systems 4.7 Services and Grounding Case Lab
5 Chapter 5: Feeders, Branch Circuits, and Conductor Sizing
5.1 Feeder vs. Branch Circuit Boundaries 5.2 Branch Circuit Ratings and Required Outlets 5.3 Conductor Ampacity, Temperature, and Terminal Ratings 5.4 Adjustment, Correction, and More Than Three Conductors 5.5 Overcurrent Protection and Small-Conductor Rules 5.6 GFCI, AFCI, Equipment Grounding, and Dwelling Circuits 5.7 Feeders and Branch Circuits Case Lab
6 Chapter 6: Wiring Methods, Raceways, Boxes, and Cables
6.1 Raceway Selection and Installation Logic 6.2 Underground Wiring, Wet Locations, and Protection 6.3 Boxes, Enclosures, and Conduit Bodies 6.4 Box Fill, Conductor Counting, and Device Yokes 6.5 Cabinets, Panelboards, and Switchboards 6.6 Flexible Cords, Cables, and Temporary Wiring 6.7 Wiring Methods Case Lab
7 Chapter 7: Equipment, Devices, Luminaires, and Controls
7.1 Receptacles, Switches, and Device Selection 7.2 Luminaires, Lampholders, and Lighting Outlets 7.3 Appliances and Utilization Equipment 7.4 Heating, Cooling, and HVAC Electrical Connections 7.5 Disconnects, Controllers, and Switching Devices 7.6 Equipment Grounding, Bonding, and Listing Markings 7.7 Equipment and Devices Case Lab
8 Chapter 8: Motors, Generators, Transformers, and Special Equipment
8.1 Motor Circuit Anatomy and Article 430 Navigation 8.2 Motor Conductors, Overload, and Short-Circuit Protection 8.3 Motor Controllers, Disconnects, and Nameplates 8.4 Generators, Transfer Equipment, and Optional Standby 8.5 Transformer Sizing, Protection, and Grounding 8.6 Emergency Systems, Fire Alarms, and Signaling Overview 8.7 Motors and Generators Case Lab
9 Chapter 9: Special Occupancies, Renewables, and Safety
9.1 Hazardous Classified Locations 9.2 Healthcare, Marinas, RV Parks, and Mobile Home Parks 9.3 Pools, Spas, and Similar Installations 9.4 Solar PV, Energy Storage, and Renewable Systems 9.5 Temporary Power, Emergency Systems, and Special Conditions 9.6 OSHA Subpart K and Safe Work Practice Context 9.7 Special Occupancies Case Lab
10 Chapter 10: Open-Book Exam Workflow and Mixed Code Labs
10.1 Four-Hour Pacing and Question Triage 10.2 Look-Up vs. Know-From-Memory Decisions 10.3 Mixed Calculation Lab 10.4 Mixed Code Navigation Lab 10.5 Diagnostic Report and Error Log Remediation 10.6 High-Weight Domain Remediation Plan 10.7 Full Exam Simulation Playbook
11 Chapter 11: Final Review, Test Day, and License Planning
11.1 Final Two-Week Study Plan 11.2 Reference Book, Tabs, and Allowed Materials Checklist 11.3 Pearson VUE, PRONTO, and Test-Day Rules 11.4 After the Exam: Results, Retakes, and Challenges 11.5 License Application, Work Hours, and Jurisdiction Next Steps 11.6 After Journeyman: Master, Contractor, and Continuing Education
1.2 Current Format, Cost, Time, and Passing Score
Key Takeaways Explain This Topic AI
R17-N, T17-N, and G17-N each list 80 multiple-choice questions, a 4-hour limit, open-book status, and a Pearson VUE fee of $120 in the current source brief.
ICC contractor/trades questions are four-option multiple-choice with one correct answer and no guessing penalty.
ICC guidance says contractor/trades exams generally require 70% correct, while some other ICC exams use different scoring.
Passing candidates are told PASS and generally do not receive a numerical score.
Last updated: May 2026
The practical shape of the test
The ICC R17-N, T17-N, and G17-N Journeyman Electrician exams share the same core logistics in the current national bulletin facts: 80 multiple-choice questions, 4 hours, open book, and a Pearson VUE fee of $120. R17-N is based on the 2023 NEC and 2021 International Codes, T17-N is based on the 2020 NEC and 2018 International Codes, and G17-N is based on the 2017 NEC.
Four hours can sound generous until you convert it to working pace. You have 240 minutes for 80 questions. That is an average of 3 minutes per question, including reading, identifying the topic, finding the rule or table, doing any arithmetic, checking units, and marking an answer.
- Item Current ICC journeyman facts
- Questions 80 multiple-choice
- Options Four options, one correct answer
- Time limit 4 hours, or 240 minutes
- Average pace 3 minutes per question
- Book status Open book
- Pearson VUE fee $120
- General passing guidance Contractor/trades exams generally require 70% correct
- Results Electronic results are generally available immediately
- What 70% means in an 80-question exam
A 70% passing target on 80 questions equals 56 correct answers. That arithmetic is easy, but the study implication is more important. You do not need perfection, yet you cannot afford to give away large clusters in high-weight domains such as wiring methods, branch circuits, services, or equipment.
Formula:
80 questions x 0.70 = 56 correct answers
A useful practice target is higher than the minimum. If you are scoring 56 out of 80 on friendly practice questions, you have no buffer for unfamiliar wording, slow lookup, test-day fatigue, or a weak reference setup. For exam readiness, track both score and time. A 72% untimed result is not the same as a 72% result completed in 4 hours with disciplined lookup.
No guessing penalty changes your strategy
ICC contractor/trades questions use four options with one correct answer. The source brief states that there is no guessing penalty, so every question should receive an answer. Blank items are avoidable losses.
Use a three-pass method:
First pass: answer known or quick lookup questions.
Second pass: work calculation and table questions that need setup.
Final pass: eliminate wrong options and guess on anything still unresolved.
This is not a license to rush. It is a way to prevent one difficult motor, service, or special occupancy question from consuming time that belongs to five easier questions. Mark and move when the route is not obvious after a reasonable search.
Open book does not mean open time
The bulletin warns that candidates will not have time to look up every answer. That warning is the center of journeyman exam preparation. The exam rewards the person who knows where a topic lives and can distinguish a definition, a general rule, a table condition, and an exception.
A strong open-book workflow looks like this:
- Question clue First move Second move
- Defined term Article 100 Then relevant article if the definition points there
- Branch-circuit rating Article 210 Check conductor, receptacle, load, and protection context
- Service equipment Article 230 Verify disconnect, conductor, grounding, and rating issue
- Raceway fill Chapter 9 Confirm raceway type and conductor count
- Motor load Article 430 Identify full-load current table and protection rule
- Hazardous location Chapter 5 Confirm class, division or zone, and equipment method
- Score reports and retakes
Electronic results are generally available immediately. Passing candidates are told PASS and do not receive a numerical score under ICC passing score guidance. Failed exam retakes generally have a 10-day wait unless the licensing board says otherwise.
That last phrase is important. A board can impose a different retake rule or require new authorization. Treat the ICC bulletin as the exam provider source and the licensing board as the licensing source.
Time budget by question type
Not every question deserves 3 minutes. Some code-location questions should take under a minute if your tabs, index habits, and article map are strong. Some calculations deserve 5 minutes because the setup has multiple steps.
Question type Target time Reasonable action
Memorized logistics or definition 30 to 60 seconds Answer, flag only if uncertain.
Direct code lookup 1 to 2 minutes Use index or article map, verify exact condition.
Table lookup with units 2 to 4 minutes Write variables, table, column, and adjustment.
Multi-step calculation 4 to 6 minutes Work only after identifying the correct article route.
Stalled item Stop at 3 minutes on first pass Flag, choose provisional answer, return later.
Exam trap: applying master electrician scoring
ICC passing score guidance distinguishes contractor/trades exams from national certification exams and notes that the Master Electrician contractor/trades exam requires 75%. Do not transfer that 75% master exam number to journeyman unless your specific exam source says so. For journeyman contractor/trades planning, the cited general guidance is 70% correct.
You should also avoid claiming a universal first-time pass rate. The opened sources do not provide an ICC first-time pass rate for this exam. Study planning should be based on the outline, practice performance, and your own lookup speed, not on unsupported pass-rate claims.