Study guide
11.2 Reference Book, Tabs, and Allowed Materials Checklist
Journeyman Electrician Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Orientation and Source Control
1.1 ICC R17, T17, G17, and Jurisdiction Variance 1.2 Current Format, Cost, Time, and Passing Score 1.3 Licensing Board vs. Exam Provider 1.4 Official References, Open-Book Rules, and Calculators 1.5 Domain Weights and Study Map 1.6 Using the Practice Bank, Error Log, and NEC Index
2 Chapter 2: NEC Navigation, Definitions, and Code Strategy
2.1 NEC Book Structure and Article Map 2.2 Article 100 Definitions and Exam Language 2.3 Index, Table, and Annex Navigation 2.4 Shall, Shall Not, Permitted, and Informational Notes 2.5 Using Code References Without Overlooking Context 2.6 State Amendments and Code Edition Control 2.7 NEC Navigation Case Lab
3 Chapter 3: Electrical Theory and Calculation Foundations
3.1 Ohm's Law, Power, and Basic Units 3.2 Series, Parallel, and Circuit Behavior 3.3 Single-Phase, Three-Phase, and Voltage Systems 3.4 Continuous Loads, Demand, and 125 Percent Rules 3.5 Voltage Drop and Practical Calculation Setup 3.6 Load Calculation Workflow 3.7 Calculation Foundation Case Lab
4 Chapter 4: Services, Service Equipment, and Grounding/Bonding
4.1 Service Point, Service Conductors, and Disconnects 4.2 Service Load Calculation and Sizing 4.3 Service Equipment, Panelboards, and Switchboards 4.4 Grounding Electrode System and GEC 4.5 Bonding, Main Bonding Jumpers, and Effective Fault Path 4.6 Transformers and Separately Derived Systems 4.7 Services and Grounding Case Lab
5 Chapter 5: Feeders, Branch Circuits, and Conductor Sizing
5.1 Feeder vs. Branch Circuit Boundaries 5.2 Branch Circuit Ratings and Required Outlets 5.3 Conductor Ampacity, Temperature, and Terminal Ratings 5.4 Adjustment, Correction, and More Than Three Conductors 5.5 Overcurrent Protection and Small-Conductor Rules 5.6 GFCI, AFCI, Equipment Grounding, and Dwelling Circuits 5.7 Feeders and Branch Circuits Case Lab
6 Chapter 6: Wiring Methods, Raceways, Boxes, and Cables
6.1 Raceway Selection and Installation Logic 6.2 Underground Wiring, Wet Locations, and Protection 6.3 Boxes, Enclosures, and Conduit Bodies 6.4 Box Fill, Conductor Counting, and Device Yokes 6.5 Cabinets, Panelboards, and Switchboards 6.6 Flexible Cords, Cables, and Temporary Wiring 6.7 Wiring Methods Case Lab
7 Chapter 7: Equipment, Devices, Luminaires, and Controls
7.1 Receptacles, Switches, and Device Selection 7.2 Luminaires, Lampholders, and Lighting Outlets 7.3 Appliances and Utilization Equipment 7.4 Heating, Cooling, and HVAC Electrical Connections 7.5 Disconnects, Controllers, and Switching Devices 7.6 Equipment Grounding, Bonding, and Listing Markings 7.7 Equipment and Devices Case Lab
8 Chapter 8: Motors, Generators, Transformers, and Special Equipment
8.1 Motor Circuit Anatomy and Article 430 Navigation 8.2 Motor Conductors, Overload, and Short-Circuit Protection 8.3 Motor Controllers, Disconnects, and Nameplates 8.4 Generators, Transfer Equipment, and Optional Standby 8.5 Transformer Sizing, Protection, and Grounding 8.6 Emergency Systems, Fire Alarms, and Signaling Overview 8.7 Motors and Generators Case Lab
9 Chapter 9: Special Occupancies, Renewables, and Safety
9.1 Hazardous Classified Locations 9.2 Healthcare, Marinas, RV Parks, and Mobile Home Parks 9.3 Pools, Spas, and Similar Installations 9.4 Solar PV, Energy Storage, and Renewable Systems 9.5 Temporary Power, Emergency Systems, and Special Conditions 9.6 OSHA Subpart K and Safe Work Practice Context 9.7 Special Occupancies Case Lab
10 Chapter 10: Open-Book Exam Workflow and Mixed Code Labs
10.1 Four-Hour Pacing and Question Triage 10.2 Look-Up vs. Know-From-Memory Decisions 10.3 Mixed Calculation Lab 10.4 Mixed Code Navigation Lab 10.5 Diagnostic Report and Error Log Remediation 10.6 High-Weight Domain Remediation Plan 10.7 Full Exam Simulation Playbook
11 Chapter 11: Final Review, Test Day, and License Planning
11.1 Final Two-Week Study Plan 11.2 Reference Book, Tabs, and Allowed Materials Checklist 11.3 Pearson VUE, PRONTO, and Test-Day Rules 11.4 After the Exam: Results, Retakes, and Challenges 11.5 License Application, Work Hours, and Jurisdiction Next Steps 11.6 After Journeyman: Master, Contractor, and Continuing Education
11.2 Reference Book, Tabs, and Allowed Materials Checklist
Key Takeaways Explain This Topic AI
Use only the references approved for your exact exam code and current catalog, because appeals and grading are tied to listed references.
ICC computer-based contractor/trades exams generally allow copyrighted bound materials with ink notes, highlighting, and permanently attached tabs, while loose papers are prohibited.
Calculator rules require a battery-operated, nonprogrammable calculator that cannot store exam information; PRONTO allows a basic four-function nonprogrammable calculator.
A good tab system is organized by exam routes, not by decoration or every possible article.
Last updated: May 2026
Open book still has rules
The ICC journeyman electrician exams listed in the current brief are open book, but open book does not mean bring anything you want. The exam catalog identifies approved references, and the ICC contractor/trades guidance says exam questions come from the listed references. Appeals are also based on listed references. Your first checklist item is therefore simple: match your books to the exact exam code and current catalog.
For R17-N, the source brief identifies the 2023 NEC and 2021 International Codes as the basis. T17-N uses the 2020 NEC and 2018 International Codes. G17-N uses the 2017 NEC. If your jurisdiction authorizes a different exam or adds local references, follow that jurisdiction and current exam catalog.
Reference control checklist
Use this checklist a week before the exam, not the morning of the exam.
Confirm the exam code: R17-N, T17-N, G17-N, or a jurisdiction-specific exam.
Download or save the current exam catalog and bulletin page for that exam.
Confirm each approved reference title, edition, and year.
Confirm whether your specific delivery method is Pearson VUE test center or PRONTO remote proctoring, if available for your exam.
Remove loose paper, loose photocopies, sticky notes, worksheets, and any unapproved inserts.
Check that tabs are permanently attached.
Check that notes are in ink if notes are allowed under the current rule.
Verify calculator rules and bring a backup only if the rules allow it.
Verify identification, appointment time, location, and arrival instructions.
Notes and tabs
The source brief states that computer-based exams generally allow copyrighted bound material with ink notes, highlighting, and permanently attached tabs. Loose papers are prohibited. That means the condition of your book matters. Notes written on loose sheets and tucked into the NEC are not the same as ink notes in the bound reference.
Do not build a tab system that tries to mark every page. Too many tabs slow you down. A useful tab is an address for a repeated exam route.
Tab label Why it helps
Art 100 Defined terms often decide the question before a calculation begins.
110 Working space, listing, labeling, installation, and general requirements.
210 Branch circuits, required receptacles, GFCI/AFCI, outlet rules.
220 Load calculations and demand factors.
230 Services and service equipment.
250 Grounding and bonding.
300 General wiring methods.
310 Conductors and ampacity.
314 Outlet, device, pull, and junction boxes.
352/358/376 or local common raceways Raceways you repeatedly confuse.
400 Flexible cords and cables.
430 Motors.
500s Special occupancies and hazardous locations.
680 Pools and similar installations.
Chapter 9 Raceway fill tables and notes.
Annex C Conduit and tubing fill examples, if allowed by the edition and catalog.
What to write in the book
Good notes are short route markers. They should help you remember where to go next, not reproduce pages of material. Examples include box fill: count conductors, devices, fittings, EGC allowance , motor: use table FLC, not nameplate, unless rule says otherwise , or check notes under table before answer .
Avoid notes that become a private textbook. Test center staff may inspect materials, and rules can change. Keep your notes within the published candidate policy for your exam administration. If you are uncertain whether a note style is acceptable, ask ICC or Pearson VUE before test day.
Calculator rules
Calculator rules are practical and easy to overlook. The source brief states that the calculator must be battery-operated, nonprogrammable, not capable of storing examination information, and without ribbon or paper printing. PRONTO allows a basic four-function nonprogrammable calculator.
Practice with the same type of calculator. A scientific calculator is not useful if the rules for your delivery method allow only a basic model. Also practice writing formulas on the permitted scratch material or test interface. If no loose paper is allowed in PRONTO, do not build a practice method that depends on your own notebook.
PRONTO material limits
PRONTO remote proctoring has tighter environment rules. The brief states that PRONTO prohibits loose papers, writing utensils, smart watches, external monitors, and any second monitor or screen. If you choose or are assigned PRONTO, rehearse your physical setup: clean desk, approved references only, one screen, compliant calculator, no smartwatch, and no unapproved writing tools.
Fast book check drill
Before the exam, run a 20-minute book check. Pick ten routes from your error log and find each without solving a full problem. Examples: Article 100 definition, service disconnect rule, raceway fill table, box fill rule, motor full-load current table, special occupancy article, GFCI location rule, conductor ampacity table, working clearance, and flexible cord use.
If any route takes more than 90 seconds just to locate, adjust your tab or index habit. Open book is useful only when the book opens to the right place quickly.