Study guide
4.2 Service Load Calculation and Sizing
Journeyman Electrician Study Guide Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Exam Orientation and Source Control
1.1 ICC R17, T17, G17, and Jurisdiction Variance 1.2 Current Format, Cost, Time, and Passing Score 1.3 Licensing Board vs. Exam Provider 1.4 Official References, Open-Book Rules, and Calculators 1.5 Domain Weights and Study Map 1.6 Using the Practice Bank, Error Log, and NEC Index
2 Chapter 2: NEC Navigation, Definitions, and Code Strategy
2.1 NEC Book Structure and Article Map 2.2 Article 100 Definitions and Exam Language 2.3 Index, Table, and Annex Navigation 2.4 Shall, Shall Not, Permitted, and Informational Notes 2.5 Using Code References Without Overlooking Context 2.6 State Amendments and Code Edition Control 2.7 NEC Navigation Case Lab
3 Chapter 3: Electrical Theory and Calculation Foundations
3.1 Ohm's Law, Power, and Basic Units 3.2 Series, Parallel, and Circuit Behavior 3.3 Single-Phase, Three-Phase, and Voltage Systems 3.4 Continuous Loads, Demand, and 125 Percent Rules 3.5 Voltage Drop and Practical Calculation Setup 3.6 Load Calculation Workflow 3.7 Calculation Foundation Case Lab
4 Chapter 4: Services, Service Equipment, and Grounding/Bonding
4.1 Service Point, Service Conductors, and Disconnects 4.2 Service Load Calculation and Sizing 4.3 Service Equipment, Panelboards, and Switchboards 4.4 Grounding Electrode System and GEC 4.5 Bonding, Main Bonding Jumpers, and Effective Fault Path 4.6 Transformers and Separately Derived Systems 4.7 Services and Grounding Case Lab
5 Chapter 5: Feeders, Branch Circuits, and Conductor Sizing
5.1 Feeder vs. Branch Circuit Boundaries 5.2 Branch Circuit Ratings and Required Outlets 5.3 Conductor Ampacity, Temperature, and Terminal Ratings 5.4 Adjustment, Correction, and More Than Three Conductors 5.5 Overcurrent Protection and Small-Conductor Rules 5.6 GFCI, AFCI, Equipment Grounding, and Dwelling Circuits 5.7 Feeders and Branch Circuits Case Lab
6 Chapter 6: Wiring Methods, Raceways, Boxes, and Cables
6.1 Raceway Selection and Installation Logic 6.2 Underground Wiring, Wet Locations, and Protection 6.3 Boxes, Enclosures, and Conduit Bodies 6.4 Box Fill, Conductor Counting, and Device Yokes 6.5 Cabinets, Panelboards, and Switchboards 6.6 Flexible Cords, Cables, and Temporary Wiring 6.7 Wiring Methods Case Lab
7 Chapter 7: Equipment, Devices, Luminaires, and Controls
7.1 Receptacles, Switches, and Device Selection 7.2 Luminaires, Lampholders, and Lighting Outlets 7.3 Appliances and Utilization Equipment 7.4 Heating, Cooling, and HVAC Electrical Connections 7.5 Disconnects, Controllers, and Switching Devices 7.6 Equipment Grounding, Bonding, and Listing Markings 7.7 Equipment and Devices Case Lab
8 Chapter 8: Motors, Generators, Transformers, and Special Equipment
8.1 Motor Circuit Anatomy and Article 430 Navigation 8.2 Motor Conductors, Overload, and Short-Circuit Protection 8.3 Motor Controllers, Disconnects, and Nameplates 8.4 Generators, Transfer Equipment, and Optional Standby 8.5 Transformer Sizing, Protection, and Grounding 8.6 Emergency Systems, Fire Alarms, and Signaling Overview 8.7 Motors and Generators Case Lab
9 Chapter 9: Special Occupancies, Renewables, and Safety
9.1 Hazardous Classified Locations 9.2 Healthcare, Marinas, RV Parks, and Mobile Home Parks 9.3 Pools, Spas, and Similar Installations 9.4 Solar PV, Energy Storage, and Renewable Systems 9.5 Temporary Power, Emergency Systems, and Special Conditions 9.6 OSHA Subpart K and Safe Work Practice Context 9.7 Special Occupancies Case Lab
10 Chapter 10: Open-Book Exam Workflow and Mixed Code Labs
10.1 Four-Hour Pacing and Question Triage 10.2 Look-Up vs. Know-From-Memory Decisions 10.3 Mixed Calculation Lab 10.4 Mixed Code Navigation Lab 10.5 Diagnostic Report and Error Log Remediation 10.6 High-Weight Domain Remediation Plan 10.7 Full Exam Simulation Playbook
11 Chapter 11: Final Review, Test Day, and License Planning
11.1 Final Two-Week Study Plan 11.2 Reference Book, Tabs, and Allowed Materials Checklist 11.3 Pearson VUE, PRONTO, and Test-Day Rules 11.4 After the Exam: Results, Retakes, and Challenges 11.5 License Application, Work Hours, and Jurisdiction Next Steps 11.6 After Journeyman: Master, Contractor, and Continuing Education
4.2 Service Load Calculation and Sizing
Key Takeaways Explain This Topic AI
A service load calculation is a sequence: classify loads, apply demand factors, handle continuous loads, then size equipment and conductors.
General lighting, small-appliance, laundry, appliances, cooking equipment, dryers, HVAC, and electric heat each have their own exam-tested treatment.
The largest motor and continuous-load adjustments can change the service size even when the arithmetic total looks simple.
Use the NEC edition named by the exam and do not assume optional methods are available unless the question facts fit them.
Last updated: May 2026
Service calculations are classification problems
Most service sizing questions are not hard because the math is advanced. They are hard because the loads are mixed. A range, a dryer, a heat pump, a water heater, a sign circuit, a continuous lighting load, and a largest motor adjustment do not all enter the calculation the same way. The exam expects you to know where to look and how to organize the work before pressing the calculator keys.
Use the NEC edition assigned to your exam. R17 uses the 2023 NEC, T17 uses the 2020 NEC, and G17 uses the 2017 NEC. The broad workflow is stable, but table numbers, optional methods, and wording can move. The source brief also warns against assuming a universal state license rule. Always pair the national exam preparation with the jurisdiction that will issue the license.
Code-navigation table
Question fact Start here Study move
Dwelling general lighting load Article 220 dwelling provisions Multiply floor area by the unit load, then apply permitted demand factors.
Two or more small-appliance circuits Article 220 dwelling small-appliance rules Add required small-appliance loads before dwelling demand treatment.
Laundry circuit in dwelling Article 220 dwelling laundry rule Keep it separate from general lighting until the Code tells you how to combine.
Household range or wall ovens Cooking equipment demand table Match number and rating of appliances to the table notes.
Electric dryer Dryer demand rule and table Use nameplate or minimum value as required, then apply demand.
Heating and air conditioning Noncoincident load rule Usually include the larger of heating or cooling, not both, when they cannot operate together.
Continuous commercial load Article 215/230 overcurrent and conductor sizing Apply 125 percent where required unless equipment is listed for 100 percent operation.
Calculation setup template
Use a written setup like this on scratch material or in the margin of your code book if the testing rules allow permanent notes before the exam:
- Load category Given facts NEC treatment VA or amps after demand
- General lighting Area x unit load Article 220 demand ___ VA
- Small appliance/laundry Required circuits Add required VA ___ VA
- Fastened appliances Nameplates Appliance demand if allowed ___ VA
- Cooking Range/cooktop/oven ratings Cooking demand table ___ VA
- Dryer Nameplate/minimum Dryer rule/table ___ VA
- HVAC/electric heat Heating and cooling facts Larger noncoincident load ___ VA
- Motors Largest motor included? Add required percentage ___ VA
- Continuous loads Duration and equipment rating 125 percent where required ___ VA
Then convert single-phase volt-ampere load to amperes with:
Amperes = volt-amperes / system voltage
For a 120/240 volt single-phase dwelling service, divide the final VA by 240 volts. For a three-phase service, use the appropriate three-phase formula when the load is given in kVA and line voltage:
- Amperes = VA / (1.732 x line-to-line volts)
- Standard versus optional dwelling methods
The exam may offer both standard and optional dwelling answers. Do not choose an optional calculation just because it produces a smaller service. Optional methods are allowed only when the installation facts meet the rule. Read the question stem for dwelling type, number of units, service rating, load types, and whether the optional method is requested. If the question asks for the standard calculation, do the standard calculation even if you know an optional method exists.
A good habit is to circle the word dwelling, multifamily, existing dwelling, commercial, or farm when it appears. Article 220 is organized around occupancy and load category. A demand factor from one occupancy is not a general discount coupon for another.
Continuous loads and service equipment
A continuous load is expected to run for 3 hours or more. On service and feeder sizing, continuous-load rules can affect conductor ampacity and overcurrent device rating. The exam may hide this in plain sight: a store lighting load, a sign load, or process equipment is described as operating continuously, while a larger intermittent load is not. If all you do is total nameplates, you will miss the 125 percent adjustment where required.
Also separate calculated load from equipment label. A 200 amp service disconnect does not prove the calculated service load is 200 amps. A calculated load of 176 amps may require a conductor and overcurrent choice that fits standard ampere ratings and terminal temperature rules. Conductor material, insulation, raceway fill, ambient correction, and terminal ratings can still matter after the Article 220 work is done.
Field case
A detached one-family dwelling has electric cooking, an electric dryer, a heat pump with auxiliary heat, general lighting, small-appliance circuits, a laundry circuit, and a 240 volt well pump. The wrong way is to add every nameplate and divide by 240. The better way is to group the loads. General lighting, small-appliance, and laundry loads follow dwelling demand rules. The range and dryer follow their own demand rules. Heating and cooling are checked for noncoincident operation, usually taking the larger load rather than both. The well pump may trigger a largest motor adjustment.
In the field, the service size affects meter equipment, service conductors, grounding electrode conductor, service disconnect, available fault current marking, panel capacity, and sometimes utility approval. On the exam, it affects a multiple-choice answer. In both settings, the calculation must be traceable.
Exam traps
Watch for units. kW and kVA are often treated similarly for resistive loads, but horsepower motors require tables and motor rules. Do not use breaker size as motor full-load current when the Code sends you to motor tables. Watch for line-to-neutral versus line-to-line voltage. A 120/240 volt service calculation generally divides total balanced VA by 240 volts for service amperes, not 120 volts.
Finally, check whether the answer asks for load, conductor ampacity, overcurrent rating, or minimum service rating. Those are related but distinct outputs. A clean calculation can still end with the wrong answer if you solve for amps when the question asks for VA, or choose conductor size when it asks for service disconnect rating.