Study guide
9.1 Edge Metal & Drip Edge: Code Rules (IBC 1507.2.8.3 / IRC R905.2.8.5), FORTIFIED Upgrades & ES-1 Edge Securement
Louisiana Residential Roofing Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Louisiana Licensing Law & Act 422 Regulatory Framework
1.1 Act 422 (2025): The Residential Roofing Classification, the $7,500 Threshold & Licensing Requirements 1.2 Act 239 (2025) Roof Permits & Inspections, Permit-Related Violations & Louisiana's Construction Code 1.3 LSLBC Enforcement: Violations, Cease-and-Desist Orders, Civil Fines & Criminal Penalties
2 Chapter 2: Louisiana Business Law, Contracts & Liens
2.1 Louisiana Private Works Act (La. R.S. 9:4801 et seq.): Privileges, Notices of Contract & Termination, and Lien Deadlines 2.2 Residential Roofing Contracts: Required Contents (R.S. 37:2159) & Property-Insurance Claim Rules (R.S. 37:2159.1) 2.3 Contractor Insurance (Liability & Workers' Compensation), the Statutory Employer Rule & Business Records
3 Chapter 3: Roofing Estimating, Plan Reading & Mathematics
3.1 Architectural Roof Plans, Symbols, Dimensions & Structural Pitch Calculations 3.2 Surface Area Calculations, Roofing Squares, Pitch Multipliers & Slope Formulas 3.3 Material Takeoff, Wastage Factors (Hips, Valleys, Rakes), and Jobsite Cost Estimating
4 Chapter 4: Roof Deck Preparation, Substrates & Re-Roofing Codes
4.1 Roof Deck Substrates (Plywood, OSB, Wood Board) & Structural Inspection Criteria 4.2 Reroofing Rules (IBC 1512 / IRC R908): Roof Replacement vs. Roof Recover, the Two-Layer Limit & Tear-Off Triggers 4.3 Deck Fastening, Nail Patterns, Damaged Sheathing Replacement & Clean Substrate Preparation
5 Chapter 5: Hurricane-Resistant Roofing, Wind Codes & FORTIFIED Standards
5.1 Louisiana Wind Speeds, Exposure, Wind-Borne Debris Regions & Roof Uplift Zones (IBC Chapter 16 / ASCE 7) 5.2 High-Wind Underlayment Rules (IBC Table 1507.1.1) & Sealed Roof Deck Options (Taped Seams, Two Layers, Full Self-Adhered) 5.3 IBHS FORTIFIED Roof (2025 Standard), the Louisiana Fortify Homes Program & Louisiana FORTIFIED Incentives 5.4 High-Wind Fastening Protocols: 6-Nail Shingle Patterns, Ring-Shank Nails & ASTM D3161/D7158 Wind Ratings
6 Chapter 6: Asphalt Shingles & Steep-Slope Assemblies
6.1 Asphalt Shingle Types (3-Tab vs. Laminated Architectural), ASTM Classifications & Thermal Behavior 6.2 Underlayment Specifications: Felt vs. Synthetic Underlayments & Self-Adhering High-Temperature Membranes 6.3 Shingle Application Mechanics: Starter Courses, Offsets, Fastener Placement & Wind Sealant Activation 6.4 Valley Construction Assemblies (Open Metal, Woven, Closed-Cut) & Ridge / Hip Cap Installations
7 Chapter 7: Metal, Tile, Slate & Wood Steep-Slope Systems
7.1 Metal Roof Panels & Metal Roof Shingles: Standing Seam, Exposed Fasteners, Minimum Slopes & Thermal Movement 7.2 Concrete & Clay Tile Roof Systems: Battens, Direct-to-Deck, Wind Uplift Resistance & Foam/Mortar Adhesion 7.3 Natural Slate & Synthetic Tile Roofing: Installation Fundamentals, Headlap & Fastening 7.4 Wood Shingles & Wood Shakes (IBC 1507.8–1507.9): Grades, Slopes, Sheathing, Exposure, Spacing & Fasteners
8 Chapter 8: Low-Slope Membranes & Built-Up Roofing (BUR)
8.1 Built-Up Roofing (BUR) Systems: Asphalt vs. Coal Tar Pitch, Organic/Glass Felts & Surfacings 8.2 Polymer-Modified Bitumen Systems: SBS vs. APP, Torched, Hot-Mopped, Cold-Adhesive & Self-Adhered Sheets 8.3 Single-Ply Roofing Membranes: TPO, PVC, and EPDM (Attachment Methods, Seam Welding & Ballast) 8.4 Low-Slope Rigid Insulation, Cover Boards, Vapor Retarders & Thermal Barriers
9 Chapter 9: Flashing, Penetrations & Roof Ventilation
9.1 Edge Metal & Drip Edge: Code Rules (IBC 1507.2.8.3 / IRC R905.2.8.5), FORTIFIED Upgrades & ES-1 Edge Securement 9.2 Step Flashing, Counterflashing, Chimney Crickets & Reglet Details 9.3 Plumbing Vents, Mechanical Exhausts, Skylight Curbs & Roof Penetration Seals 9.4 Attic Ventilation: Net Free Ventilating Area (1/150 vs. 1/300 Rule, IBC 1202.2 / IRC R806), Balanced Airflow & Unvented Attics
10 Chapter 10: Roof Drainage, Maintenance & Emergency Repairs
10.1 Roof Drainage Design: Primary Drains, Secondary Overflow Scuppers & Sizing Calculations 10.2 Gutters, Downspouts, Splash Blocks & Stormwater Runoff Management 10.3 Post-Storm Emergency Tarping, Temporary Shoring, Moisture Assessment & Insurance Scope Documentation
11 Chapter 11: OSHA Safety, Fall Protection & Jobsite Environmental Controls
11.1 OSHA 29 CFR 1926 Subpart M: Fall Protection Systems (Guardrails, Safety Nets, PFAS, Warning Lines & Monitors) 11.2 Ladder & Scaffolding Safety (29 CFR 1926 Subpart L & X, 4:1 Extension Rule, Tie-Off & Pitch) 11.3 PPE, Tool Safety, Hot Kettle/Torch Safety & Hazardous Material Communication (Lead, Asbestos, Silica) 11.4 Heat Illness Prevention & Louisiana High-Humidity Environmental Field Controls
9.1 Edge Metal & Drip Edge: Code Rules (IBC 1507.2.8.3 / IRC R905.2.8.5), FORTIFIED Upgrades & ES-1 Edge Securement
Key Takeaways Explain This Topic AI
IBC 1507.2.8.3 and IRC R905.2.8.5 require drip edge at the eaves and rake edges of asphalt shingle roofs.
Code drip edge laps at least 2 inches, extends at least 1/4 inch below the sheathing and 2 inches onto the deck, and is fastened at 12 inches on center or less.
Underlayment goes over the drip edge at eaves and under the drip edge at rakes; FORTIFIED instead puts the drip edge over the underlayment at eaves and seals it.
FORTIFIED drip edge is at least 26-gauge steel, laps at least 3 inches, and is nailed at 4 inches on center, staggered, with 12-gauge ASTM F1667 roofing nails.
Metal edge systems on low-slope (below 2:12) membrane roofs must be tested to ANSI/SPRI ES-1 methods RE-1, RE-2, and RE-3 (IBC 1504.6).
Last updated: September 2026
Edge Metal Flashing: Drip Edge, Gutter Aprons & Edge Securement
Roof edges are the most vulnerable part of a steep-slope roof. Wind pressures are highest at eaves, rakes, and corners. Once wind gets under the edge, it can drive rain under the shingles, peel back the underlayment, and start a progressive peel of the roof covering. Drip edge sheds water off the deck edge and away from the fascia, and it stiffens and protects the edge of the roof covering. Under the IBC and IRC as adopted in the Louisiana State Uniform Construction Code (LSUCC), drip edge is required on asphalt shingle roofs.
1. The Code Rule: IBC 1507.2.8.3 and IRC R905.2.8.5
The PSI Louisiana Residential Roofing exam references the 2021 IBC , which states the rule in Section 1507.2.8.3:
IBC 1507.2.8.3 Drip Edge: "A drip edge shall be provided at eaves and rake edges of shingle roofs. Adjacent segments of the drip edge shall be lapped not less than 2 inches (51 mm). The vertical leg of drip edges shall be not less than 1 1/2 inches (38 mm) in width and shall extend not less than 1/4 inch (6.4 mm) below sheathing. The drip edge shall extend back on the roof not less than 2 inches (51 mm). Underlayment shall be installed over drip edges along eaves. Drip edges shall be installed over underlayment along rake edges. Drip edges shall be mechanically fastened at intervals not greater than 12 inches (305 mm) on center."
The 2021 IRC R905.2.8.5 , used for one- and two-family dwellings, has the same laps, 1/4-inch projection, 2-inch flange, eave and rake sequence, and 12-inch maximum fastener spacing, using the shingle fasteners of R905.2.5.
The Numbers to Memorize
- Requirement Code Minimum (IBC 1507.2.8.3 / IRC R905.2.8.5)
- Where Eaves and rake edges of shingle roofs
- End laps between pieces At least 2 inches
- Vertical leg (IBC) At least 1-1/2 inches
- Projection below sheathing At least 1/4 inch
- Flange back onto the deck At least 2 inches
- Eave sequence Underlayment over the drip edge
- Rake sequence Drip edge over the underlayment
- Fastening Mechanically fastened at 12 inches on center or less
- How It Is Enforced
Missing drip edge at an eave or rake, the wrong lap order, or fasteners spaced wider than 12 inches are code deficiencies an inspector can cite (permits and inspections are covered in Chapter 1). Programs such as FORTIFIED set stricter rules (Part 5 below and Section 5.3).
2. Sheet Metal Material Specifications and Gauges
Edge metal must survive decades of sun, humidity, and salt air.
Code Minimums for Flashing Metal
IBC 1503.2.1 and IRC R903.2.1: where flashing is metal, it must be corrosion resistant and at least 0.019 inch thick (No. 26 galvanized sheet) .
IBC 1507.2.8.1: base and cap flashing for asphalt shingles must be corrosion-resistant metal of nominal 0.019-inch thickness. Base flashing may instead be mineral-surfaced roll roofing weighing at least 77 pounds per 100 square feet .
Common Edge Metal Materials
Galvanized Sheet Steel: ASTM A653 with a G90 zinc coating is the usual specification, in 26 gauge or heavier. Lighter 28- or 30-gauge products bend during installation and fall below the 0.019-inch flashing minimum.
Aluminum: ASTM B209 sheet, commonly about 0.019 to 0.032 inch for drip edge. Open valley linings of aluminum must be at least 0.024 inch (IBC Table 1507.2.8.2).
Copper: cold-rolled copper, ASTM B370, 16 ounces per square foot (about 0.0216 inch). Use copper or compatible fasteners.
Stainless Steel: used on severe salt-exposure sites near the Gulf.
Coastal fasteners: FORTIFIED requires hot-dip galvanized or stainless steel fasteners and connectors within 3,000 feet of saltwater (Section 5.3).
Galvanic Corrosion Mitigation
Roofing contractors must prevent galvanic corrosion caused by coupling electrochemically dissimilar metals. Direct contact between aluminum drip edge and copper gutters, or between galvanized steel flashing and copper nails, speeds corrosion in Louisiana's humid, salty air. Fasteners must match or be galvanically compatible with the flashing:
Galvanized steel edge metal -> Hot-dipped galvanized steel roofing nails.
Aluminum edge metal -> Aluminum or stainless steel nails, or hot-dipped galvanized nails where the manufacturer allows.
Copper edge metal -> Copper or compatible (bronze or stainless) nails.
Treated lumber contact: copper-based preservatives such as ACQ and copper azole corrode aluminum and plain steel. Wood-treatment and flashing manufacturers call for a separation layer, such as self-adhered membrane or felt, or a compatible metal.
3. Profile Anatomy: Drip Edge vs. Gutter Apron
Sheet metal flashings for roof perimeters are bent into specialized geometric profiles designed to optimize water discharge, break surface tension, and prevent wind-driven blow-in. STANDARD DRIP EDGE (T-STYLE / L-STYLE) GUTTER APRON PROFILE
- <──────── 2" to 3" Flange ────────> <───── 2" to 3" Flange ─────>
- =================================== ============================
- ║ ║
- Roof Deck Substrate ║ ║
- ║ ║
- Vertical ║ Vertical ║
- Face Leg ║ Face Leg ║ 2-1/2" to 3"
- (1-1/2") ║ (Angled) ║ (Drops into
- ║ ║ Gutter)
- Kicked-Out Hem ║<── 1/4" Gap ║
- ───────╝ from Fascia ║
- / ║
- / 30°-45° Kick ║
- o Hemmed Drip Edge o Hemmed Apron
- Anatomy of Drip Edge Flashings
Horizontal Roof Flange: Rests flat on the roof deck and extends back at least 2 inches (code). Wider flanges make room for staggered nailing.
Vertical Drop Face: Runs down the fascia or rake trim. The IBC requires it to be at least 1-1/2 inches and to extend at least 1/4 inch below the sheathing .
Kicked-Out Drip Hem: The bottom edge of the vertical face is angled outward and usually finished with a folded hem. The hem adds structural rigidity to the metal strip and forces descending water droplets to break surface tension and drop cleanly away from the building rather than clinging to the fascia wood.
Gutter Apron Flashing Mechanics
A gutter apron is an alternative edge metal profile installed specifically along eave edges equipped with exterior gutters:
Extended Vertical Drop: Unlike standard drip edge that has a sharp 90-degree corner and short drip kick, a gutter apron features a deeper vertical drop (2-1/2 to 3-1/2 inches) angled slightly outward to match the slope of the fascia board.
Direct Gutter Discharge: The extended drop leg hangs inside the back of the gutter, so water that runs down the metal lands in the trough instead of behind the gutter.
4. The Critical Installation Sequence: Eaves vs. Gable Rakes
The single most critical exam concept and field installation rule governing edge metal is the relationship between the drip edge and the roof underlayment . The sequence differs completely between eaves (horizontal drainage edges) and rakes (sloping gable edges). EAVE INSTALLATION SEQUENCE RAKE INSTALLATION SEQUENCE
(Water-Shedding Hierarchy) (Wind-Uplift & Blow-In Defense)
- [ Course 1: Asphalt Shingles ] [ Course 1: Asphalt Shingles ]
- │ │
- ▼ ▼
- [ Course 0: Starter Shingle Strip ] [ Course 0: Starter Shingle Strip ]
- │ │
- ▼ ▼
- [ Underlayment / Ice & Water ] [ EDGE METAL DRIP EDGE ] <── Over Underlayment
- │ (Laps OVER Metal) │
- ▼ ▼
- [ EDGE METAL DRIP EDGE ] [ Underlayment / Ice & Water ]
- │ (Installed First) │ (Lapped to Edge First)
- ▼ ▼
- [ Bare Structural Wood Deck ] [ Bare Structural Wood Deck ]
- A. Eaves Installation Protocol (Underlayment OVER Drip Edge)
Along the horizontal eaves of the roof, the primary hazard is water draining downward across the roof plane under gravity:
Step 1: The bare wood roof deck is cleaned, inspected, and verified flush.
Step 2: The drip edge metal is applied directly to the bare wood deck sheathing along the entire eave length before any underlayment is unrolled.
Step 3: The roof underlayment (synthetic underlayment, #30 felt, or ASTM D1970 self-adhering membrane) is installed OVER the horizontal metal flange of the drip edge .
Hydraulic Principle: If water bypasses the shingles at the eave, it flows down across the waterproof underlayment, transitions seamlessly onto the metal flange of the drip edge, and discharges safely into the gutter. If the drip edge were placed over the underlayment at the eave, runoff would hit the top edge of the metal flange and seep directly beneath the underlayment onto the wood deck.
B. Gable Rake Installation Protocol (Drip Edge OVER Underlayment)
Along the sloping rake edges (gables), the hydraulic dynamics are reversed. Gravity water flows parallel to the rake, while the primary threat is lateral wind-driven rain driving inward from the gable end:
Step 1: The roof underlayment is rolled completely to the gable rake edge, trimmed flush with the outer edge of the roof deck sheathing, and fastened.
Step 2: The drip edge metal is installed OVER the underlayment along the rake slope.
Step 3: The starter shingle strip and shingles are applied over the rake drip edge flange.
Wind and Water Principle: Placing the rake drip edge over the underlayment clamps the outer edge of the underlayment to the deck. If lateral wind drives rain under the rake shingles, the water hits the upper face of the underlayment and drains down slope. If underlayment were placed over the metal at the rake, crosswinds could catch the underlayment edge, peel it open, and channel water straight to the bare sheathing.
FORTIFIED exception at eaves: A FORTIFIED roof has a sealed deck under the underlayment, so FORTIFIED puts the drip edge over the underlayment at eaves too and seals the eave with flashing cement or a self-adhered starter (Part 5). Know both answers: the code answer at eaves is underlayment over drip edge.
Detailed Edge Metal Comparison Matrix: Eaves vs. Rakes
Design & Field Parameter Horizontal Eave Application Sloping Gable Rake Application
Primary Threat Gravity water drainage, gutter overflow, fascia wicking High aerodynamic wind uplift, corner vortices, lateral driven rain
- Installation Substrate Bare structural wood sheathing On top of installed roof underlayment
- Underlayment Position Underlayment OVER Drip Edge Flange Drip Edge OVER Underlayment
Corner Intersections Eave metal installed first; ends trimmed flush or folded Rake metal overlaps eave corner, folded to create closed cap
Joint Overlap Standard Code: at least 2 inches (FORTIFIED: at least 3 inches) Code: at least 2 inches (FORTIFIED: at least 3 inches)
Fastening Code: 12 inches on center or less (FORTIFIED: 4 inches, staggered) Code: 12 inches on center or less (FORTIFIED: 4 inches, staggered)
Code Reference IBC 1507.2.8.3 / IRC R905.2.8.5 IBC 1507.2.8.3 / IRC R905.2.8.5
5. High-Wind Edge Details: FORTIFIED Drip Edge & Low-Slope Edge Securement (ANSI/SPRI ES-1)
In hurricanes, roof coverings often fail by peeling from the edge. Wind that hits a wall is deflected up over the eave and rake, creating strong suction on the edge metal and the first courses of the roof, and outward pressure on the face of the metal. WIND VORTEX FORCES ON EDGE METAL
- Intense Negative Pressure (Uplift Suction)
- ▲ ▲ ▲ ▲
- ┌───────────────────────┐ <── Shingle Starter Course
- Accelerated │ ===================== │ <── Edge Metal Deck Flange
- Wind Stream └───────────┬───────────┘ <── Fasteners (code: 12" o.c. max)
- ▲ │
- │ Horizontal Deck │
- │ ▼
- ─────┴─────┐ ┌────────────────────────┐
- │ │ Fascia Board │
- │ │ │
- │ <──── Prying Force Pushes Inward │
- │ and Outward on Vertical Face │
- │ │
- Code Minimum vs. FORTIFIED Roof (Detail F-DE-1)
- Item IBC 1507.2.8.3 / IRC R905.2.8.5 FORTIFIED Roof
- Eave sequence Underlayment over drip edge Drip edge over underlayment, sealed at the eave
- Rake sequence Drip edge over underlayment Drip edge over underlayment
- Laps between pieces At least 2 inches At least 3 inches
- Projection below sheathing At least 1/4 inch 1/2 inch
- Flange onto deck At least 2 inches At least 2 inches
- Fastener spacing 12 inches on center or less 4 inches on center or less, staggered
- Fasteners Shingle fasteners (IRC R905.2.5) 12-gauge (0.105-inch) roofing nails with 3/8-inch heads, ASTM F1667
- Metal Corrosion-resistant; flashing metal at least 0.019 inch At least 26 gauge for steel
Eave seal None required 8-inch band of flashing cement (1/8 inch thick maximum) or a self-adhered starter strip over the primed flange
The Louisiana amendments approved in 2026 for the 2024 IRC (effective January 1, 2027) add an exception to R905.2.8.5: on a roof built to IBHS FORTIFIED standards, the FORTIFIED drip-edge requirements govern.
Good Practice at Corners and Laps
Laps: On rakes, lap the upper piece over the lower piece so water runs over the joint, not into it. Nail through both layers near each lap.
Corners: At eave-to-rake corners, install the eave piece first, running it slightly past the corner. Notch and fold it around the gable end. Then lap the rake piece over it so water running down the rake lands on top of the eave metal.
Nails: Ring-shank nails hold better than smooth shanks. Use a metal compatible with the drip edge.
Low-Slope Roofs: ANSI/SPRI ES-1 (IBC 1504.6)
ANSI/SPRI/FM 4435/ES-1 is the test standard for edge systems on low-slope roofs (2:12 or less). IBC 1504.6 requires metal edge systems (except gutters and counterflashing) on built-up, modified bitumen, and single-ply roofs with slopes below 2:12 to be designed for Chapter 16 wind loads and tested with ES-1 methods:
RE-1: tests the roof-edge termination of ballasted or mechanically attached membranes , where the membrane is not adhered or fastened within 12 inches of the edge.
RE-2: a pull-off test for edge flashings (fascia-type metal whose exposed horizontal part is 4 inches or less), pulling outward on the vertical face.
RE-3: a pull-off test for copings (exposed horizontal part more than 4 inches), pulling up and out at the same time.
Gutters used to secure a low-slope membrane edge must instead be tested to SPRI GT-1 (IBC 1504.6.1). ES-1 does not govern ordinary drip edge on steep-slope shingle roofs, which follows IBC 1507.2.8.3 or IRC R905.2.8.5.