Study guide
2.2 Topographic Surveys, Easements & Encumbrances
Landscape Architect Registration Examination L.A.R.E.
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Project Management, Legal Framework & Contracts
1.1 Professional Practice, Ethics & the HSW Mandate 1.2 Standard of Care, Responsible Charge & Sealing Documents 1.3 Professional Services Agreements & Contract Clauses 1.4 Fee Structures, Compensation Models & Billing 1.5 Project Scheduling, CPM & Budget Management 1.6 Risk Management, Professional Liability & Insurance
2 Chapter 2: Site Inventory, Surveying & Regulatory Framework
2.1 Boundary Surveys, Legal Descriptions & Survey Datums 2.2 Topographic Surveys, Easements & Encumbrances 2.3 Desktop Inventory, GIS Data & Field Reconnaissance 2.4 Policy Documents & Prior Planning Studies 2.5 Adjacent Land Use & Contextual Data Collection 2.6 Stakeholder Engagement & Public Participation 2.7 Zoning Frameworks, Dimensional Standards & FAR 2.8 Parking Standards, Buffer Yards & Zoning Relief 2.9 Clean Water Act Permitting & NEPA Review 2.10 ESA, Floodplain, Coastal & Historic Preservation Compliance
3 Chapter 3: Physical, Contextual & Environmental Site Analysis
3.1 Scoping Site Analysis & Synthesizing Opportunities and Constraints 3.2 Geotechnical Investigation & Soil Classification Systems 3.3 Problematic Soil Conditions & Agronomic Soil Quality 3.4 Topographic Interpretation & Slope Suitability 3.5 Watershed Mechanics, Stream Order & FEMA Flood Hazard Zones 3.6 Wetland Delineation, Classification & Riparian Buffers 3.7 Utility Analysis & Infrastructure Capacity 3.8 Visual Resource & Viewshed Analysis 3.9 Contextual Analysis: Appropriate Use & Future Development Impacts 3.10 Microclimates, Solar Orientation & Vegetation Analysis
4 Chapter 4: Stewardship, Climate Resiliency & Design Principles
4.1 SITES v2 & LEED Site Credit Rating Systems 4.2 Life-Cycle Assessment, Embodied Carbon & Ecosystem Services 4.3 Climate Resiliency, Adaptation & Urban Heat Island Mitigation 4.4 Environmental Justice & Social Equity in Site Design 4.5 Cultural Landscapes, Historic Preservation & Adaptive Reuse
5 Chapter 5: Master Planning, Programming & Land Use
5.1 Project Visioning, Goal Setting & Space Programming 5.2 Carrying Capacity Analysis & NRPA Park Classification Standards 5.3 Site Suitability Synthesis & Opportunities/Constraints Mapping 5.4 Land Use Allocation & Development Scenario Evaluation 5.5 Master Plan Deliverables & Design Guidelines 5.6 Capital Improvement Programming, Phasing & Implementation
6 Chapter 6: Schematic Design & Spatial Organization
6.1 Design Intent, Conceptual Diagrams & Form Generation 6.2 Basis of Design, Alternatives Evaluation & the Preferred Scheme 6.3 Spatial Hierarchy, Outdoor Rooms & Proportion 6.4 Pedestrian Circulation Networks & Environmental Wayfinding 6.5 ADA & PROWAG Accessible Route Design 6.6 Multimodal Transportation, Vehicular Circulation & Parking Layout
7 Chapter 7: Design Development, Materials & Planting Systems
7.1 Paving Systems: Rigid, Flexible & Unit Pavers 7.2 Retaining Walls, Earth Pressure & Wall Drainage 7.3 Wall System Selection, Fences, Screens & Gates 7.4 Site Furnishings: Selection, Materiality & Anchoring 7.5 Exterior Lighting, Photometrics, Dark Sky & Electrical Safety 7.6 Public Playground Safety: CPSC & ASTM Standards 7.7 Planting Design Principles & Ecological Matching 7.8 Water Conservation, Xeriscaping & Irrigation System Principles 7.9 Opinions of Probable Cost & Value Engineering
8 Chapter 8: Construction Drawings, Layout & Detailing
8.1 Drawing Set Hierarchy, Sheet Standards & Drafting Conventions 8.2 Interdisciplinary Coordination & QA/QC Review 8.3 Demolition Plans & Tree Protection Requirements 8.4 Site Preparation: Clearing, Grubbing, Topsoil & Utility Abandonment 8.5 Layout, Dimensioning & Materials Plans 8.6 Planting Plans, Plant Schedules & Installation Details 8.7 Technical Detailing: Pavements, Curbs & Joint Assemblies 8.8 Retaining Wall, Stair & Ramp Detailing Standards
9 Chapter 9: Construction Specifications & Bidding
9.1 CSI MasterFormat Divisions & SectionFormat Structure 9.2 Specification Writing Methods & the Drawings–Specifications Relationship 9.3 Project Manual, General Conditions & Front-End Documents 9.4 Bid Requirements, Bid Forms & Addenda Management 9.5 Pre-Bid Procedures, Bid Opening & Contractor Evaluation
10 Chapter 10: Construction Administration, Submittals & Changes
10.1 Pre-Construction Conference & Construction Administration Authority 10.2 Initial Decision Maker, Communication Protocols & Project Records 10.3 Submittals, Shop Drawings, Product Data & Samples 10.4 Requests for Information (RFIs) & Technical Clarifications 10.5 Change Orders, Construction Change Directives & Claims
11 Chapter 11: Field Observation, Quality Control & Close-Out
11.1 Field Observations, Site Reports & Non-Conforming Work 11.2 Quality Control, Material Testing & Inspections 11.3 Substantial Completion, Punch Lists & Retainage 11.4 Project Close-Out, Guarantees, Warranties & Final Acceptance
12 Chapter 12: Contour Interpretation, Grading & Earthwork Calculations
12.1 Contour Rules & Topographic Landform Interpretation 12.2 Spot Elevations & Contour Interpolation Calculations 12.3 Slope Formulas, Maximum Gradients & Cross Slopes 12.4 Earthwork Calculations: Average End Area & Grid Methods 12.5 Cut and Fill Balancing, Shrinkage, Swell & Mass Haul 12.6 Reviewing Grading Design: Error Detection & Constructability
13 Chapter 13: Stormwater Hydrology, Runoff & BMP Design
13.1 Hydrologic Cycle, Watershed Delineation & Time of Concentration 13.2 Peak Runoff Estimation: The Rational Method (Q = CiA) 13.3 NRCS Curve Number Method & Runoff Hydrographs 13.4 LID Principles, Water Quality Volume & Bioretention Design 13.5 Bioswales, Permeable Pavement, Green Roofs & Harvesting
14 Chapter 14: Site Drainage Systems, Hydraulics & Erosion Control
14.1 Open Channel Hydraulics, Manning’s Equation & Swale Design 14.2 Gutter Flow, Spread & Roadway Inlet Hydraulics 14.3 Subsurface Drainage, Catch Basins & Pipe Invert Calculations 14.4 Stormwater Storage: Detention, Retention & Water Quality Basins 14.5 Reviewing Drainage Plans & Evaluating Design Alternatives 14.6 Erosion Mechanics, RUSLE & the NPDES/SWPPP Framework 14.7 Erosion & Sediment Control BMPs, Basins & Site Stabilization
2.2 Topographic Surveys, Easements & Encumbrances
Key Takeaways Explain This Topic AI
Easements convey non-possessory property interests categorized as appurtenant (running with the land to benefit a dominant parcel) or in gross (benefiting an entity such as a utility provider), distinct from dedicated public rights-of-way.
An ALTA/NSPS Land Title Survey combines boundary, improvement, and title-exception mapping, making it the standard deliverable for commercial acquisition and the document that discloses encroachments.
An encroachment is physical intrusion of an improvement across a boundary; unlike an easement it conveys no recorded right and may ripen into adverse possession if left unchallenged for the statutory period.
Topographic surveys must state contour interval, datum, and field-locating method, because LiDAR and UAS photogrammetry return surface models that require ground control and bare-earth filtering before grading design.
Building, grading, and planting are generally prohibited inside a recorded utility easement, so the easement footprint must be plotted on the base map before any layout is developed.
Last updated: September 2026
Topographic Surveys & Modern Survey Technology
A topographic survey maps the 3D relief, physical features, and spot elevations of natural and constructed landforms. Key components include contour lines (lines connecting points of equal elevation), breaklines (linear discontinuities in slope, such as curbs, retaining walls, swale inverts, and ditch ridges), and spot elevations at grade transitions.
Contour Intervals and Precision
The contour interval is the constant vertical distance between adjacent contour lines. Selection of the contour interval is governed by terrain slope, map scale, and project phase:
1-foot or 2-foot intervals: Standard for landscape architectural site grading, construction documentation, and architectural layout.
5-foot intervals: Standard for large-scale campus master plans, park feasibility studies, or steep mountainous topography.
10-foot or 20-foot intervals: Standard for regional watershed planning, GIS environmental suitability models, and USGS 7.5-minute quadrangles.
Surveying Instrumentation
Landscape architects collaborate with land surveyors who utilize specialized electronic and optical instrumentation:
Total Station: Integrates an electronic theodolite (for measuring horizontal and vertical angles) with an Electronic Distance Meter (EDM). Robotic total stations enable a single surveyor to capture millimetric 3D coordinates using an optical retroreflector prism pole.
GPS / GNSS (Global Navigation Satellite Systems): Employs multi-constellation satellite receivers (GPS, GLONASS, Galileo). While standalone recreational GPS yields 3- to 5-meter positional errors, Real-Time Kinematic (RTK) GNSS uses an on-site base station or cellular Virtual Reference Station (VRS) network to achieve sub-centimeter to 2-centimeter horizontal and vertical precision.
LiDAR (Light Detection and Ranging): An active remote sensing technique that fires hundreds of thousands of laser light pulses per second to measure surface elevations. Airborne LiDAR penetrates dense deciduous forest canopies through laser returns that filter out vegetation leaves (canopy model) to generate a high-precision Bare Earth Digital Elevation Model (DEM) . Terrestrial Laser Scanning (TLS) captures millimetric 3D point clouds of historic masonry, bridges, and complex rock faces.
Drone Photogrammetry (UAS): Unmanned Aerial Systems capture overlapping high-resolution aerial photographs. Software uses Structure from Motion (SfM) algorithms to construct 3D point clouds and orthoimagery. Survey-grade drone mapping requires surveyed Ground Control Points (GCPs) visible on the ground to anchor the model to state plane coordinates.
Easements, Rights-of-Way, Encroachments & Encumbrances
Title encumbrances dictate the legally buildable envelope and circulation corridors of any property parcel.
Encumbrance Type Definition & Legal Character Design Impact for Landscape Architects
Easement Appurtenant An easement that attaches to and benefits a specific parcel of land ( dominant tenement ) while burdening an adjoining parcel ( servient tenement ). Runs with the land automatically upon sale. Common for shared vehicular access drives, fire lanes, or shared stormwater detention outfalls. Cannot be revoked unilaterally.
Easement in Gross An easement that benefits a specific individual or legal entity (such as a utility company or municipality) rather than an adjoining parcel of land. Standard for public water mains, sanitary sewer trunks, electric transmission lines, and gas pipelines. Restricts planting of deep-rooted canopy trees or erection of permanent structures.
Conservation Easement A voluntary, legally binding deed restriction conveyed to a land trust or public agency to permanently preserve natural, ecological, scenic, or agricultural resources. Prohibits future subdivision, commercial development, mass grading, or clearing of native vegetation in perpetuity. Grants tax benefits to the donor.
Right-of-Way (ROW) A strip of land legally dedicated to a municipal, county, or state government for public transportation and utility infrastructure. Extends beyond the paved street curb to encompass sidewalks, planting verges, street trees, and underground utilities. The property boundary starts at the ROW line, not the curb.
Encroachment An unauthorized physical intrusion of a building, fence, retaining wall, paving, or roof overhang from one parcel onto an adjoining property or easement. A major legal defect. Unresolved encroachments can ripen into prescriptive easements or claims of adverse possession under state statutory limitation periods (typically 7 to 21 years). Public Street Cross-Section & Right-of-Way (ROW) Limits
- |<------------------------------ Public Right-of-Way (ROW) ------------------------------>|
- | |<--------------- Paved Roadway --------------->| |
- | Sidewalk / | Curb Curb | Sidewalk / |
- | Tree Verge | Line Line | Tree Verge |
- |================|-----------------------------------------------|================|
- ^ Property Line ^ Property Line
- (Client Land) (Adjoining Land)
Real-World Application: When designing streetscapes or commercial plaza frontage, landscape architects must never dimension setbacks from the street curb. The street curb is merely an engineered asphalt or concrete edge that can be relocated during road widening. Setbacks must always be measured from the legal Right-of-Way (ROW) line established on the boundary survey.
Comparison of Survey Methodologies
Survey Type Primary Purpose Standard Deliverable Typical Horizontal/Vertical Precision
Cadastral / Boundary Establish legal parcel corners, property lines, and area Stamped plat with metes and bounds, monument descriptions 1:10,000 to 1:50,000 relative closure precision
ALTA/NSPS Land Title Satisfy lender and title insurer requirements for commercial acquisition Multi-layer plat showing boundaries, easements, improvements, Table A data Meets strict ALTA/NSPS Relative Positional Precision (≤ 2 cm + 50 ppm)
Topographic Survey Map 3D relief, physical features, contours, and spot elevations CAD drawing with contours (1-2 ft), spot elevations, breaklines, trees Total Station: ±0.01 ft; RTK GNSS: ±0.03 to 0.06 ft
Airborne LiDAR Large-scale regional surface modeling through dense vegetation Bare Earth DEM, classified 3D LAS point clouds ±0.15 to 0.50 ft vertical accuracy (USGS QL1/QL2)
Drone Photogrammetry Rapid site orthomosaic imagery and 3D surface modeling High-resolution aerial GeoTIFF, DSM, textured 3D mesh ±0.05 to 0.15 ft horizontally and vertically with surveyed GCPs