Study guide
3.7 Utility Analysis & Infrastructure Capacity
Landscape Architect Registration Examination L.A.R.E.
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Project Management, Legal Framework & Contracts
1.1 Professional Practice, Ethics & the HSW Mandate 1.2 Standard of Care, Responsible Charge & Sealing Documents 1.3 Professional Services Agreements & Contract Clauses 1.4 Fee Structures, Compensation Models & Billing 1.5 Project Scheduling, CPM & Budget Management 1.6 Risk Management, Professional Liability & Insurance
2 Chapter 2: Site Inventory, Surveying & Regulatory Framework
2.1 Boundary Surveys, Legal Descriptions & Survey Datums 2.2 Topographic Surveys, Easements & Encumbrances 2.3 Desktop Inventory, GIS Data & Field Reconnaissance 2.4 Policy Documents & Prior Planning Studies 2.5 Adjacent Land Use & Contextual Data Collection 2.6 Stakeholder Engagement & Public Participation 2.7 Zoning Frameworks, Dimensional Standards & FAR 2.8 Parking Standards, Buffer Yards & Zoning Relief 2.9 Clean Water Act Permitting & NEPA Review 2.10 ESA, Floodplain, Coastal & Historic Preservation Compliance
3 Chapter 3: Physical, Contextual & Environmental Site Analysis
3.1 Scoping Site Analysis & Synthesizing Opportunities and Constraints 3.2 Geotechnical Investigation & Soil Classification Systems 3.3 Problematic Soil Conditions & Agronomic Soil Quality 3.4 Topographic Interpretation & Slope Suitability 3.5 Watershed Mechanics, Stream Order & FEMA Flood Hazard Zones 3.6 Wetland Delineation, Classification & Riparian Buffers 3.7 Utility Analysis & Infrastructure Capacity 3.8 Visual Resource & Viewshed Analysis 3.9 Contextual Analysis: Appropriate Use & Future Development Impacts 3.10 Microclimates, Solar Orientation & Vegetation Analysis
4 Chapter 4: Stewardship, Climate Resiliency & Design Principles
4.1 SITES v2 & LEED Site Credit Rating Systems 4.2 Life-Cycle Assessment, Embodied Carbon & Ecosystem Services 4.3 Climate Resiliency, Adaptation & Urban Heat Island Mitigation 4.4 Environmental Justice & Social Equity in Site Design 4.5 Cultural Landscapes, Historic Preservation & Adaptive Reuse
5 Chapter 5: Master Planning, Programming & Land Use
5.1 Project Visioning, Goal Setting & Space Programming 5.2 Carrying Capacity Analysis & NRPA Park Classification Standards 5.3 Site Suitability Synthesis & Opportunities/Constraints Mapping 5.4 Land Use Allocation & Development Scenario Evaluation 5.5 Master Plan Deliverables & Design Guidelines 5.6 Capital Improvement Programming, Phasing & Implementation
6 Chapter 6: Schematic Design & Spatial Organization
6.1 Design Intent, Conceptual Diagrams & Form Generation 6.2 Basis of Design, Alternatives Evaluation & the Preferred Scheme 6.3 Spatial Hierarchy, Outdoor Rooms & Proportion 6.4 Pedestrian Circulation Networks & Environmental Wayfinding 6.5 ADA & PROWAG Accessible Route Design 6.6 Multimodal Transportation, Vehicular Circulation & Parking Layout
7 Chapter 7: Design Development, Materials & Planting Systems
7.1 Paving Systems: Rigid, Flexible & Unit Pavers 7.2 Retaining Walls, Earth Pressure & Wall Drainage 7.3 Wall System Selection, Fences, Screens & Gates 7.4 Site Furnishings: Selection, Materiality & Anchoring 7.5 Exterior Lighting, Photometrics, Dark Sky & Electrical Safety 7.6 Public Playground Safety: CPSC & ASTM Standards 7.7 Planting Design Principles & Ecological Matching 7.8 Water Conservation, Xeriscaping & Irrigation System Principles 7.9 Opinions of Probable Cost & Value Engineering
8 Chapter 8: Construction Drawings, Layout & Detailing
8.1 Drawing Set Hierarchy, Sheet Standards & Drafting Conventions 8.2 Interdisciplinary Coordination & QA/QC Review 8.3 Demolition Plans & Tree Protection Requirements 8.4 Site Preparation: Clearing, Grubbing, Topsoil & Utility Abandonment 8.5 Layout, Dimensioning & Materials Plans 8.6 Planting Plans, Plant Schedules & Installation Details 8.7 Technical Detailing: Pavements, Curbs & Joint Assemblies 8.8 Retaining Wall, Stair & Ramp Detailing Standards
9 Chapter 9: Construction Specifications & Bidding
9.1 CSI MasterFormat Divisions & SectionFormat Structure 9.2 Specification Writing Methods & the Drawings–Specifications Relationship 9.3 Project Manual, General Conditions & Front-End Documents 9.4 Bid Requirements, Bid Forms & Addenda Management 9.5 Pre-Bid Procedures, Bid Opening & Contractor Evaluation
10 Chapter 10: Construction Administration, Submittals & Changes
10.1 Pre-Construction Conference & Construction Administration Authority 10.2 Initial Decision Maker, Communication Protocols & Project Records 10.3 Submittals, Shop Drawings, Product Data & Samples 10.4 Requests for Information (RFIs) & Technical Clarifications 10.5 Change Orders, Construction Change Directives & Claims
11 Chapter 11: Field Observation, Quality Control & Close-Out
11.1 Field Observations, Site Reports & Non-Conforming Work 11.2 Quality Control, Material Testing & Inspections 11.3 Substantial Completion, Punch Lists & Retainage 11.4 Project Close-Out, Guarantees, Warranties & Final Acceptance
12 Chapter 12: Contour Interpretation, Grading & Earthwork Calculations
12.1 Contour Rules & Topographic Landform Interpretation 12.2 Spot Elevations & Contour Interpolation Calculations 12.3 Slope Formulas, Maximum Gradients & Cross Slopes 12.4 Earthwork Calculations: Average End Area & Grid Methods 12.5 Cut and Fill Balancing, Shrinkage, Swell & Mass Haul 12.6 Reviewing Grading Design: Error Detection & Constructability
13 Chapter 13: Stormwater Hydrology, Runoff & BMP Design
13.1 Hydrologic Cycle, Watershed Delineation & Time of Concentration 13.2 Peak Runoff Estimation: The Rational Method (Q = CiA) 13.3 NRCS Curve Number Method & Runoff Hydrographs 13.4 LID Principles, Water Quality Volume & Bioretention Design 13.5 Bioswales, Permeable Pavement, Green Roofs & Harvesting
14 Chapter 14: Site Drainage Systems, Hydraulics & Erosion Control
14.1 Open Channel Hydraulics, Manning’s Equation & Swale Design 14.2 Gutter Flow, Spread & Roadway Inlet Hydraulics 14.3 Subsurface Drainage, Catch Basins & Pipe Invert Calculations 14.4 Stormwater Storage: Detention, Retention & Water Quality Basins 14.5 Reviewing Drainage Plans & Evaluating Design Alternatives 14.6 Erosion Mechanics, RUSLE & the NPDES/SWPPP Framework 14.7 Erosion & Sediment Control BMPs, Basins & Site Stabilization
3.7 Utility Analysis & Infrastructure Capacity
Key Takeaways Explain This Topic AI
Utility analysis answers four separate questions — availability, capacity, location, and depth — and a utility that exists at the frontage may still be unable to serve the project.
Utility locate marking follows the APWA uniform color code: red for electric, yellow for gas and petroleum, orange for communications, blue for potable water, green for sewer and drain, purple for reclaimed water, and white for proposed excavation.
A one-call locate marks only the approximate horizontal position of a utility and never its depth, so vertical conflicts require potholing or subsurface utility engineering.
Gravity sewer and storm systems cannot be rerouted around a conflict without changing invert elevations, so they control the layout while pressure utilities bend around them.
Tree planting within a utility easement is generally prohibited or limited to a restricted species list, because maintenance excavation by the utility owner is an unrestricted right.
Last updated: September 2026
1. Four Questions, Not One
Perform Utility Analysis appears in the Physical Analysis content area with the parenthetical "capacity, availability, proximity, suitability." The exam treats these as four distinct questions, and confusing them is the most common error.
- Question What it asks How it is answered
- Availability Does the service physically exist within reach? Utility atlas maps, will-serve inquiry
Capacity Can the existing system accept this project's demand? Written will-serve letter or capacity study from the utility owner
Proximity / location Exactly where is it horizontally and vertically? Record drawings, one-call locates, potholing, subsurface utility engineering
Suitability Is it appropriate for the intended use? Pressure, flow, voltage, pipe material and age, treatment quality
A 12-inch water main at the frontage satisfies availability. It does not establish that the system can deliver the required fire flow at the required residual pressure , which is a capacity question answered only by the water purveyor. A project can be denied a certificate of occupancy for failing fire flow on a street with an apparently adequate main.
2. The Utility Families and What Each Constrains
Gravity systems (sanitary sewer, storm sewer). These are the controlling utilities. Their inverts are fixed by downstream elevations, so they cannot be raised, lowered, or rerouted without re-engineering the entire run. A gravity main sets the minimum achievable finished floor elevation for anything that must drain to it. Where a gravity connection is impossible, a pump station or grinder pump is required, which adds permanent operating cost and a failure mode.
Pressure systems (water, gas, force main). These can bend horizontally and vertically around obstacles, so in a conflict the pressure line moves and the gravity line stays.
Dry utilities (electric, communications, cable). Delivered overhead or in a duct bank. Duct banks are shallow, wide, and unforgiving of tree roots. Overhead lines impose canopy clearance limits that dictate species selection along the entire frontage.
Reclaimed and non-potable water. Marked purple, physically separated from potable systems, and subject to backflow prevention and signage requirements.
3. Locating: Color Code, Limits, and Potholing
The APWA uniform color code for temporary marking of underground facilities is directly testable:
- Color Facility
- Red Electric power lines, cables, conduit, lighting cables
- Yellow Gas, oil, steam, petroleum, gaseous materials
- Orange Communications, alarm and signal lines, cable, conduit
- Blue Potable water
- Purple Reclaimed water, irrigation, slurry lines
- Green Sewers and drain lines
- Pink Temporary survey markings
- White Proposed excavation
Critical limitation: a one-call ticket produces marks showing the approximate horizontal location of a facility — typically within a tolerance zone of 18 inches on each side of the marked centerline. It does not indicate depth. Any design that depends on vertical clearance requires potholing (vacuum excavation test holes) or a Subsurface Utility Engineering investigation delivered at an ASCE 38 quality level.
4. Separation, Cover, and Conflict Resolution
Standard requirements that recur on the exam:
Water and sanitary sewer horizontal separation: commonly 10 feet edge to edge, with water above sewer at crossings and a minimum 18 inches of vertical separation.
Minimum cover: water mains are typically buried below the local frost depth; storm and sanitary depth is set by the required slope and downstream invert, not by a fixed cover.
Utility easement width: typically 10 to 20 feet for a single line, wider for a duct bank or multiple lines.
Resolution hierarchy in a conflict:
Move the proposed element (tree, wall, structure) if it is not fixed by program.
Move the pressure utility , which can deviate.
Move the gravity utility , which requires re-establishing inverts and slope.
Relocate the existing utility , which requires a relocation agreement, the utility owner's design, and usually the project's money.
Relocations are schedule risk, not just cost risk: utility owners work on their own design and construction calendars, and a relocation requested late can delay a project by a full season.
5. Utilities and Trees: The Recurring Conflict
Planting within a recorded utility easement is generally prohibited or restricted, because the easement holder has an unrestricted right to excavate for maintenance at any time. A tree planted over a duct bank is not protected; the utility may remove it without compensation and without notice.
Design responses:
Horizontal offset. Shift the tree row outside the easement, even at the cost of a less regular streetscape rhythm.
Species substitution. Where planting inside an easement is permitted, the utility's approved list typically limits mature height under overhead lines (commonly 25 feet or less) and root aggressiveness over buried lines.
Structural soil or suspended pavement. Provides rootable volume outside the utility corridor.
Root barriers. Used at the interface, though they redirect rather than eliminate root growth.
Overhead distribution lines impose a canopy clearance envelope along the entire corridor. Specifying a large-maturing shade tree beneath a distribution line guarantees a lifetime of topping, which destroys the tree's form and the streetscape's purpose.
6. Exam Traps & Pitfalls
Treating availability as capacity. Only a will-serve letter or capacity study from the owner answers capacity.
Relying on a one-call locate for depth. Locates are horizontal only; pothole for vertical conflicts.
Moving the gravity line to solve a conflict. Move the proposed element or the pressure line first.
Planting shade trees under overhead distribution. Use the utility's approved low-maturing species list.
Assuming an easement permits planting. The easement holder's excavation right supersedes the planting.