4.1 SITES v2 & LEED Site Credit Rating Systems

Landscape Architect Registration Examination L.A.R.E.

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Project Management, Legal Framework & Contracts

1.1 Professional Practice, Ethics & the HSW Mandate 1.2 Standard of Care, Responsible Charge & Sealing Documents 1.3 Professional Services Agreements & Contract Clauses 1.4 Fee Structures, Compensation Models & Billing 1.5 Project Scheduling, CPM & Budget Management 1.6 Risk Management, Professional Liability & Insurance

2 Chapter 2: Site Inventory, Surveying & Regulatory Framework

2.1 Boundary Surveys, Legal Descriptions & Survey Datums 2.2 Topographic Surveys, Easements & Encumbrances 2.3 Desktop Inventory, GIS Data & Field Reconnaissance 2.4 Policy Documents & Prior Planning Studies 2.5 Adjacent Land Use & Contextual Data Collection 2.6 Stakeholder Engagement & Public Participation 2.7 Zoning Frameworks, Dimensional Standards & FAR 2.8 Parking Standards, Buffer Yards & Zoning Relief 2.9 Clean Water Act Permitting & NEPA Review 2.10 ESA, Floodplain, Coastal & Historic Preservation Compliance

3 Chapter 3: Physical, Contextual & Environmental Site Analysis

3.1 Scoping Site Analysis & Synthesizing Opportunities and Constraints 3.2 Geotechnical Investigation & Soil Classification Systems 3.3 Problematic Soil Conditions & Agronomic Soil Quality 3.4 Topographic Interpretation & Slope Suitability 3.5 Watershed Mechanics, Stream Order & FEMA Flood Hazard Zones 3.6 Wetland Delineation, Classification & Riparian Buffers 3.7 Utility Analysis & Infrastructure Capacity 3.8 Visual Resource & Viewshed Analysis 3.9 Contextual Analysis: Appropriate Use & Future Development Impacts 3.10 Microclimates, Solar Orientation & Vegetation Analysis

4 Chapter 4: Stewardship, Climate Resiliency & Design Principles

4.1 SITES v2 & LEED Site Credit Rating Systems 4.2 Life-Cycle Assessment, Embodied Carbon & Ecosystem Services 4.3 Climate Resiliency, Adaptation & Urban Heat Island Mitigation 4.4 Environmental Justice & Social Equity in Site Design 4.5 Cultural Landscapes, Historic Preservation & Adaptive Reuse

5 Chapter 5: Master Planning, Programming & Land Use

5.1 Project Visioning, Goal Setting & Space Programming 5.2 Carrying Capacity Analysis & NRPA Park Classification Standards 5.3 Site Suitability Synthesis & Opportunities/Constraints Mapping 5.4 Land Use Allocation & Development Scenario Evaluation 5.5 Master Plan Deliverables & Design Guidelines 5.6 Capital Improvement Programming, Phasing & Implementation

6 Chapter 6: Schematic Design & Spatial Organization

6.1 Design Intent, Conceptual Diagrams & Form Generation 6.2 Basis of Design, Alternatives Evaluation & the Preferred Scheme 6.3 Spatial Hierarchy, Outdoor Rooms & Proportion 6.4 Pedestrian Circulation Networks & Environmental Wayfinding 6.5 ADA & PROWAG Accessible Route Design 6.6 Multimodal Transportation, Vehicular Circulation & Parking Layout

7 Chapter 7: Design Development, Materials & Planting Systems

7.1 Paving Systems: Rigid, Flexible & Unit Pavers 7.2 Retaining Walls, Earth Pressure & Wall Drainage 7.3 Wall System Selection, Fences, Screens & Gates 7.4 Site Furnishings: Selection, Materiality & Anchoring 7.5 Exterior Lighting, Photometrics, Dark Sky & Electrical Safety 7.6 Public Playground Safety: CPSC & ASTM Standards 7.7 Planting Design Principles & Ecological Matching 7.8 Water Conservation, Xeriscaping & Irrigation System Principles 7.9 Opinions of Probable Cost & Value Engineering

8 Chapter 8: Construction Drawings, Layout & Detailing

8.1 Drawing Set Hierarchy, Sheet Standards & Drafting Conventions 8.2 Interdisciplinary Coordination & QA/QC Review 8.3 Demolition Plans & Tree Protection Requirements 8.4 Site Preparation: Clearing, Grubbing, Topsoil & Utility Abandonment 8.5 Layout, Dimensioning & Materials Plans 8.6 Planting Plans, Plant Schedules & Installation Details 8.7 Technical Detailing: Pavements, Curbs & Joint Assemblies 8.8 Retaining Wall, Stair & Ramp Detailing Standards

9 Chapter 9: Construction Specifications & Bidding

9.1 CSI MasterFormat Divisions & SectionFormat Structure 9.2 Specification Writing Methods & the Drawings–Specifications Relationship 9.3 Project Manual, General Conditions & Front-End Documents 9.4 Bid Requirements, Bid Forms & Addenda Management 9.5 Pre-Bid Procedures, Bid Opening & Contractor Evaluation

10 Chapter 10: Construction Administration, Submittals & Changes

10.1 Pre-Construction Conference & Construction Administration Authority 10.2 Initial Decision Maker, Communication Protocols & Project Records 10.3 Submittals, Shop Drawings, Product Data & Samples 10.4 Requests for Information (RFIs) & Technical Clarifications 10.5 Change Orders, Construction Change Directives & Claims

11 Chapter 11: Field Observation, Quality Control & Close-Out

11.1 Field Observations, Site Reports & Non-Conforming Work 11.2 Quality Control, Material Testing & Inspections 11.3 Substantial Completion, Punch Lists & Retainage 11.4 Project Close-Out, Guarantees, Warranties & Final Acceptance

12 Chapter 12: Contour Interpretation, Grading & Earthwork Calculations

12.1 Contour Rules & Topographic Landform Interpretation 12.2 Spot Elevations & Contour Interpolation Calculations 12.3 Slope Formulas, Maximum Gradients & Cross Slopes 12.4 Earthwork Calculations: Average End Area & Grid Methods 12.5 Cut and Fill Balancing, Shrinkage, Swell & Mass Haul 12.6 Reviewing Grading Design: Error Detection & Constructability

13 Chapter 13: Stormwater Hydrology, Runoff & BMP Design

13.1 Hydrologic Cycle, Watershed Delineation & Time of Concentration 13.2 Peak Runoff Estimation: The Rational Method (Q = CiA) 13.3 NRCS Curve Number Method & Runoff Hydrographs 13.4 LID Principles, Water Quality Volume & Bioretention Design 13.5 Bioswales, Permeable Pavement, Green Roofs & Harvesting

14 Chapter 14: Site Drainage Systems, Hydraulics & Erosion Control

14.1 Open Channel Hydraulics, Manning’s Equation & Swale Design 14.2 Gutter Flow, Spread & Roadway Inlet Hydraulics 14.3 Subsurface Drainage, Catch Basins & Pipe Invert Calculations 14.4 Stormwater Storage: Detention, Retention & Water Quality Basins 14.5 Reviewing Drainage Plans & Evaluating Design Alternatives 14.6 Erosion Mechanics, RUSLE & the NPDES/SWPPP Framework 14.7 Erosion & Sediment Control BMPs, Basins & Site Stabilization

4.1 SITES v2 & LEED Site Credit Rating Systems

Key Takeaways Explain This Topic AI

The Sustainable SITES Initiative (SITES v2) is organized around prerequisites that must all be met plus optional credits, and is the only major rating system written specifically for the site rather than the building.

LEED v4.1 BD+C Heat Island Reduction can be satisfied through high-SR paving, shading by tree canopy within ten years of growth, open-grid paving, or shaded/covered parking, allowing a planting-based compliance path.

SITES v2 and LEED v4.1 overlap on site credits but differ in scope: SITES certifies landscapes with or without a building, while LEED site credits exist inside a whole-building certification.

Both SITES v2 and LEED v4.1 use the IES TM-15 BUG (Backlight-Uplight-Glare) rating method to limit light trespass and uplight rather than regulating total installed wattage.

Soil and vegetation protection prerequisites must be documented before construction begins, so a SITES project that disturbs healthy reference soils during mobilization can lose certification eligibility regardless of later credits.

Last updated: September 2026

Core Focus: Sustainable site design integrates natural ecological processes with built infrastructure to restore degraded ecosystems, conserve finite resources, and enhance community health. Candidates preparing for LARE Section 2 must master the Sustainable SITES Initiative (SITES v2) rating framework, contrast LEED v4.1 site credits (such as Rainwater Management, Heat Island Reduction, and BUG lighting metrics), analyze Life-Cycle Assessments (LCA) and embodied carbon in landscape materials, and apply ecosystem service valuation to site planning.

1. The Sustainable SITES Initiative (SITES v2) Rating System

The Sustainable SITES Initiative (SITES v2) is the premier comprehensive rating system for creating and certifying sustainable land design, development, and management. Developed through a collaborative partnership between the Lady Bird Johnson Wildflower Center at The University of Texas at Austin , the American Society of Landscape Architects (ASLA) , and the United States Botanic Garden , SITES is administered by Green Business Certification Inc. (GBCI) .

Unlike building-centric rating systems, SITES applies to landscapes with or without buildings . Eligible project types include urban civic parks, public plazas, corporate campuses, streetscapes, botanical gardens, commercial developments, residential communities, and ecological restoration sites. SITES v2 Rating System Architecture (200 Total Base Points)

  • ┌────────────────────────────────────────────────────────────────────────┐
  • │ Section 1: Context (P1.1, C1.2–C1.4) │
  • │ Section 2: Pre-Design Assessment + Planning (P2.1–P2.3, C2.4–C2.6) │
  • │ Section 3: Water (P3.1–P3.2, C3.3–C3.6) │
  • │ Section 4: Soil + Vegetation (P4.1–P4.3, C4.4–C4.11) │
  • │ Section 5: Materials (P5.1, C5.2–C5.10) │
  • │ Section 6: Human Health + Well-Being (P6.1, C6.2–C6.11) │
  • │ Section 7: Construction (P7.1–P7.3, C7.4) │
  • │ Section 8: Operations + Maintenance (P8.1, C8.2–C8.5) │
  • │ Section 9: Education + Performance Monitoring (C9.1–C9.2) │
  • │ Section 10: Innovation or Exemplary Performance (C10.1) │
  • └────────────────────────────────────────────────────────────────────────┘
  • The 10 Credit Sections & Mandatory Prerequisites

SITES v2 is structured across 10 sections containing 18 mandatory prerequisites and a cumulative 200 possible base points . Prerequisites carry zero point value but must be satisfied 100% for a project to be eligible for certification:

Section 1: Site Context

Prerequisite 1.1: Protect floodplain functions — Requires avoiding development within the 100-year floodplain (1% annual exceedance probability) or restoring degraded floodplain functions.

Credits 1.2–1.4: Brownfield redevelopment, connecting to multi-modal transit networks, and preserving prime farmland and critical wetlands.

Section 2: Pre-Design Assessment + Planning

Prerequisite 2.1: Use an integrative design process — Mandates assembling a multidisciplinary team (landscape architects, civil engineers, hydrologists, ecologists, soil scientists, community stakeholders) at project kickoff.

Prerequisite 2.2: Conduct a pre-design site assessment — Requires documenting baseline hydrology, soils, vegetation, climate, and cultural resources.

Prerequisite 2.3: Designate vegetation and soil protection zones (VSPZ) — Demarcates protected natural areas prior to any construction staging or grading.

Section 3: Site Design — Water

Prerequisite 3.1: Preserve water resources & design water features to conserve water — Bans the use of potable water in decorative water features after initial filling.

Prerequisite 3.2: Manage stormwater on site — Mandates retaining the 60th percentile precipitation event using Low Impact Development (LID) green infrastructure.

Credits 3.3–3.6: Managing 80th to 95th percentile events, designing restorative stormwater conveyance, using non-potable water for 100% of landscape irrigation.

Section 4: Site Design — Soil + Vegetation

Prerequisite 4.1: Create and communicate a soil management plan — Documents topsoil salvaging, compaction avoidance, and post-construction organic amendments.

Prerequisite 4.2: Control and manage invasive plants — Mandates identifying and eradicating state- and federally listed invasive species across the site.

Prerequisite 4.3: Use appropriate, non-invasive plants — Prohibits introducing invasive plants; requires plants adapted to site microclimates.

Credits 4.4–4.11: Preserving native plant communities, conserving water through drought-tolerant palettes, supporting pollinator habitat, enhancing biomass density index.

Section 5: Site Design — Materials Selection

Prerequisite 5.1: Eliminate use of wood from threatened species — Prohibits CITES-listed endangered timber species unless salvaged or FSC-certified.

Credits 5.2–5.10: Specifying Environmental Product Declarations (EPDs), utilizing salvaged materials, sourcing local/regional materials within 500 miles (800 km), reducing embodied carbon in concrete and masonry.

Section 6: Site Design — Human Health + Well-Being

Prerequisite 6.1: Protect and maintain cultural and historical places — Identifies and preserves cultural resources per national/state historic preservation registers.

Credits 6.2–6.11: Providing outdoor physical activity amenities, mental restoration spaces, community food production (urban agriculture), universal accessibility exceeding ADA minimums, visual access to nature.

Section 7: Construction

Prerequisite 7.1: Control and retain construction pollutants — Implementing Stormwater Pollution Prevention Plans (SWPPP) and sediment erosion barriers.

Prerequisite 7.2: Restore soils disturbed during construction — Decompacting subgrades to a minimum depth of 12 inches and incorporating organic compost.

Prerequisite 7.3: Protect air quality during construction — Fugitive dust suppression and limiting equipment engine idling.

Section 8: Operations + Maintenance

Prerequisite 8.1: Plan for sustainable site maintenance — Developing an operations manual detailing organic turf care, non-chemical weed control, and pruning regimes.

Credits 8.2–8.5: Diverting 100% of organic landscape waste from landfills through on-site composting, eliminating toxic chemical pesticides, using zero-emission maintenance equipment.

Section 9: Education + Performance Monitoring

Credits 9.1–9.2: Installing educational interpretive signage and conducting post-occupancy environmental performance monitoring (soil respiration, infiltration rates, pollinator counts).

Section 10: Innovation or Exemplary Performance

Credit 10.1: Exceptional performance exceeding standard credit thresholds or piloting innovative ecological technologies.

SITES v2 Certification Tiers

  • Certification Level Minimum Points Required Percentage of Base Points (200 pts)
  • SITES Certified 70 – 84 points 35% – 42%
  • SITES Silver 85 – 99 points 42.5% – 49.5%
  • SITES Gold 100 – 134 points 50% – 67%
  • SITES Platinum 135 – 200 points 67.5% – 100%
  • 2. LEED v4.1 BD+C & Neighborhood Development (ND) Site Credits

While SITES addresses the entire horizontal landscape, the LEED (Leadership in Energy and Environmental Design) v4.1 rating system integrates building envelopes with immediate site surroundings. In LEED BD+C (Building Design and Construction) and LEED ND (Neighborhood Development) , the Sustainable Sites (SS) category contains several credits directly authored and coordinated by landscape architects.

Rainwater Management (SS Credit)

The primary objective is reducing runoff volume and replicating natural site hydrologic balance using Low Impact Development (LID) and green infrastructure (bioretention, permeable pavers, bioswales, green roofs, rainwater cisterns):

Path 1: Percentile Rainfall Events (1–3 points): Retain on site (through infiltration, evapotranspiration, or rainwater harvesting) the runoff volume generated by the 80th, 85th, or 90th percentile 24-hour regional rainfall event.

Path 2: Natural Land Cover Conditions (3 points): Manage the difference between pre-development natural land cover runoff volume and post-development runoff volume for the 95th percentile event .

Heat Island Reduction (SS Credit)

Urban heat islands elevate ambient temperatures, degrading air quality and increasing building cooling loads. LEED v4.1 mandates treating non-roof hardscapes and building roofs:

Non-Roof Hardscape Mitigation: At least 50% of the non-roof site hardscape (walkways, plazas, surface parking lots, driveways) must satisfy one or a combination of the following:

Reflective Pavements: Materials achieving an initial Solar Reflectance Index (SRI) ≥ 33 (or 3-year aged SRI ≥ 28).

Canopy Shading: Shading provided by existing or newly planted trees projected within 10 years of planting .

Architectural Shading: Shading structures covered by solar photovoltaic panels or high-reflectance materials (initial SRI ≥ 39).

Permeable Pavements: Open-grid permeable pavements (at least 50% pervious area).

Roof Hardscape Mitigation:

Low-Sloped Roofs (≤ 2:12 pitch): Initial SRI ≥ 82 (or 3-year aged SRI ≥ 64).

Steep-Sloped Roofs (> 2:12 pitch): Initial SRI ≥ 39 (or 3-year aged SRI ≥ 32).

Vegetated Roofs: Extensive or intensive green roofs covering at least 50% of the roof surface.

Light Pollution Reduction & The BUG Rating System (SS Credit)

LEED v4.1 and SITES mandate eliminating light trespass, nocturnal sky glow, and high-angle glare to protect migratory birds, nocturnal pollinators, and dark skies. The outdated luminaire classification system (cutoff, semi-cutoff, non-cutoff) has been fully replaced by the IES TM-15-11 BUG Rating System : IES TM-15-11 BUG Rating Geometric Distribution

  • 90° - 180° = UPLIGHT (U)
  • ▲
  • ┌─────┴─────┐
  • 60° - 90° │ Luminaire │ 60° - 90°
  • FORWARD GLARE │ Housing │ BACKLIGHT (B)
  • (G) └─────┬─────┘ Light Trespass
  • ▼
  • 0° - 60° = Downward Useful Task Light

B (Backlight): Light emitted behind the luminaire toward the property boundary, causing light trespass onto adjacent properties.

U (Uplight): Light emitted upward above 90° horizontal into the night sky, causing atmospheric sky glow. Luminaires in pristine dark-sky zones must have a U0 rating (zero uplight).

G (Glare): High-angle light emitted between 60° and 90° in forward zones that causes visual impairment, disability glare, or blinding contrast for motorists and pedestrians.

Compliance is evaluated against established Exterior Lighting Zones (LZ0 to LZ4) established by the Illuminating Engineering Society (IES) and International Dark-Sky Association (IDA):

LZ0 (Pristine): Wilderness areas, national parks, wildlife preserves. Uplight must be strictly U0.

LZ1 (Low): Rural residential areas, nature reserves.

LZ2 (Moderate): Suburban commercial and light industrial zones.

LZ3 (Moderately High): Urban commercial and high-density residential districts.

LZ4 (High): Major metropolitan entertainment districts, transit hubs (e.g., Times Square).

Protect or Restore Habitat & Open Space (SS Credits)

Protect Habitat: Preserve at least 40% of greenfield site area from all construction activity and vehicle traffic.

Restore Habitat: On previously developed (brownfield or grayfield) sites, restore at least 30% of the total site area (excluding building footprint) using native or adapted vegetation providing layered ecological canopy, understory, and herbaceous stratigraphy.

Open Space: Provide outdoor open space equal to or greater than 30% of total site area (including building footprint), with at least 25% of that open space vegetated .