8.3 Demolition Plans & Tree Protection Requirements
Landscape Architect Registration Examination L.A.R.E.
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Project Management, Legal Framework & Contracts
1.1 Professional Practice, Ethics & the HSW Mandate 1.2 Standard of Care, Responsible Charge & Sealing Documents 1.3 Professional Services Agreements & Contract Clauses 1.4 Fee Structures, Compensation Models & Billing 1.5 Project Scheduling, CPM & Budget Management 1.6 Risk Management, Professional Liability & Insurance
2 Chapter 2: Site Inventory, Surveying & Regulatory Framework
2.1 Boundary Surveys, Legal Descriptions & Survey Datums 2.2 Topographic Surveys, Easements & Encumbrances 2.3 Desktop Inventory, GIS Data & Field Reconnaissance 2.4 Policy Documents & Prior Planning Studies 2.5 Adjacent Land Use & Contextual Data Collection 2.6 Stakeholder Engagement & Public Participation 2.7 Zoning Frameworks, Dimensional Standards & FAR 2.8 Parking Standards, Buffer Yards & Zoning Relief 2.9 Clean Water Act Permitting & NEPA Review 2.10 ESA, Floodplain, Coastal & Historic Preservation Compliance
3 Chapter 3: Physical, Contextual & Environmental Site Analysis
3.1 Scoping Site Analysis & Synthesizing Opportunities and Constraints 3.2 Geotechnical Investigation & Soil Classification Systems 3.3 Problematic Soil Conditions & Agronomic Soil Quality 3.4 Topographic Interpretation & Slope Suitability 3.5 Watershed Mechanics, Stream Order & FEMA Flood Hazard Zones 3.6 Wetland Delineation, Classification & Riparian Buffers 3.7 Utility Analysis & Infrastructure Capacity 3.8 Visual Resource & Viewshed Analysis 3.9 Contextual Analysis: Appropriate Use & Future Development Impacts 3.10 Microclimates, Solar Orientation & Vegetation Analysis
4 Chapter 4: Stewardship, Climate Resiliency & Design Principles
4.1 SITES v2 & LEED Site Credit Rating Systems 4.2 Life-Cycle Assessment, Embodied Carbon & Ecosystem Services 4.3 Climate Resiliency, Adaptation & Urban Heat Island Mitigation 4.4 Environmental Justice & Social Equity in Site Design 4.5 Cultural Landscapes, Historic Preservation & Adaptive Reuse
5 Chapter 5: Master Planning, Programming & Land Use
5.1 Project Visioning, Goal Setting & Space Programming 5.2 Carrying Capacity Analysis & NRPA Park Classification Standards 5.3 Site Suitability Synthesis & Opportunities/Constraints Mapping 5.4 Land Use Allocation & Development Scenario Evaluation 5.5 Master Plan Deliverables & Design Guidelines 5.6 Capital Improvement Programming, Phasing & Implementation
6 Chapter 6: Schematic Design & Spatial Organization
6.1 Design Intent, Conceptual Diagrams & Form Generation 6.2 Basis of Design, Alternatives Evaluation & the Preferred Scheme 6.3 Spatial Hierarchy, Outdoor Rooms & Proportion 6.4 Pedestrian Circulation Networks & Environmental Wayfinding 6.5 ADA & PROWAG Accessible Route Design 6.6 Multimodal Transportation, Vehicular Circulation & Parking Layout
7 Chapter 7: Design Development, Materials & Planting Systems
7.1 Paving Systems: Rigid, Flexible & Unit Pavers 7.2 Retaining Walls, Earth Pressure & Wall Drainage 7.3 Wall System Selection, Fences, Screens & Gates 7.4 Site Furnishings: Selection, Materiality & Anchoring 7.5 Exterior Lighting, Photometrics, Dark Sky & Electrical Safety 7.6 Public Playground Safety: CPSC & ASTM Standards 7.7 Planting Design Principles & Ecological Matching 7.8 Water Conservation, Xeriscaping & Irrigation System Principles 7.9 Opinions of Probable Cost & Value Engineering
8 Chapter 8: Construction Drawings, Layout & Detailing
8.1 Drawing Set Hierarchy, Sheet Standards & Drafting Conventions 8.2 Interdisciplinary Coordination & QA/QC Review 8.3 Demolition Plans & Tree Protection Requirements 8.4 Site Preparation: Clearing, Grubbing, Topsoil & Utility Abandonment 8.5 Layout, Dimensioning & Materials Plans 8.6 Planting Plans, Plant Schedules & Installation Details 8.7 Technical Detailing: Pavements, Curbs & Joint Assemblies 8.8 Retaining Wall, Stair & Ramp Detailing Standards
9 Chapter 9: Construction Specifications & Bidding
9.1 CSI MasterFormat Divisions & SectionFormat Structure 9.2 Specification Writing Methods & the Drawings–Specifications Relationship 9.3 Project Manual, General Conditions & Front-End Documents 9.4 Bid Requirements, Bid Forms & Addenda Management 9.5 Pre-Bid Procedures, Bid Opening & Contractor Evaluation
10 Chapter 10: Construction Administration, Submittals & Changes
10.1 Pre-Construction Conference & Construction Administration Authority 10.2 Initial Decision Maker, Communication Protocols & Project Records 10.3 Submittals, Shop Drawings, Product Data & Samples 10.4 Requests for Information (RFIs) & Technical Clarifications 10.5 Change Orders, Construction Change Directives & Claims
11 Chapter 11: Field Observation, Quality Control & Close-Out
11.1 Field Observations, Site Reports & Non-Conforming Work 11.2 Quality Control, Material Testing & Inspections 11.3 Substantial Completion, Punch Lists & Retainage 11.4 Project Close-Out, Guarantees, Warranties & Final Acceptance
12 Chapter 12: Contour Interpretation, Grading & Earthwork Calculations
12.1 Contour Rules & Topographic Landform Interpretation 12.2 Spot Elevations & Contour Interpolation Calculations 12.3 Slope Formulas, Maximum Gradients & Cross Slopes 12.4 Earthwork Calculations: Average End Area & Grid Methods 12.5 Cut and Fill Balancing, Shrinkage, Swell & Mass Haul 12.6 Reviewing Grading Design: Error Detection & Constructability
13 Chapter 13: Stormwater Hydrology, Runoff & BMP Design
13.1 Hydrologic Cycle, Watershed Delineation & Time of Concentration 13.2 Peak Runoff Estimation: The Rational Method (Q = CiA) 13.3 NRCS Curve Number Method & Runoff Hydrographs 13.4 LID Principles, Water Quality Volume & Bioretention Design 13.5 Bioswales, Permeable Pavement, Green Roofs & Harvesting
14 Chapter 14: Site Drainage Systems, Hydraulics & Erosion Control
14.1 Open Channel Hydraulics, Manning’s Equation & Swale Design 14.2 Gutter Flow, Spread & Roadway Inlet Hydraulics 14.3 Subsurface Drainage, Catch Basins & Pipe Invert Calculations 14.4 Stormwater Storage: Detention, Retention & Water Quality Basins 14.5 Reviewing Drainage Plans & Evaluating Design Alternatives 14.6 Erosion Mechanics, RUSLE & the NPDES/SWPPP Framework 14.7 Erosion & Sediment Control BMPs, Basins & Site Stabilization
8.3 Demolition Plans & Tree Protection Requirements
Key Takeaways Explain This Topic AI
The Critical Root Zone is commonly calculated as a radius of 1.0 to 1.5 feet per inch of trunk diameter at breast height, and the tree protection fence is set at that radius, not at the dripline.
Tree protection fencing must be installed before any mobilization and remain until final acceptance, because the damage that kills protected trees usually occurs during clearing and staging.
Clean root pruning with a sharp cut at the protection line is far less damaging than roots torn by an excavator bucket, so root pruning must be specified where excavation approaches the CRZ.
Demolition plans must distinguish remove, remove and salvage, remove and reinstall, and protect in place, since a single 'demo' hatch invites the wrong outcome.
Existing concrete scheduled for partial demolition requires a full-depth sawcut at the limit line so the remaining slab edge is clean and the joint can be sealed.
Last updated: September 2026
Core Focus: Site demolition and vegetation preservation plans establish the baseline physical boundaries of site transformation. Errors in delineating removals, protecting existing specimens, or stripping topsoil result in severe contractor claims, legal liability, structural pavement settlement, and irreversible ecological damage. The LARE rigorously tests candidate mastery of Tree Protection Zones (TPZ), Critical Root Zone (CRZ) mathematics, clearing versus grubbing specifications, topsoil stockpile biology, and utility abandonment procedures.
1. Demolition Plans & Material Disposition
The Demolition Plan (typically L-100 series) provides the legal and physical instructions for dismantling, clearing, and reconfiguring existing site features. A complete demolition plan must unambiguously categorize every existing object into one of three distinct categories:
Items to Be Removed: Pavements, foundations, fences, light poles, utilities, or vegetation scheduled for complete extraction and off-site disposal.
Items to Remain and Be Protected: Existing trees, historic structures, utility mains, boundary monuments, or adjacent pavements that must be safeguarded throughout construction.
Items to Be Salvaged or Relocated: High-value or historic components to be carefully disassembled, cleaned, indexed, and stored for reinstallation (e.g., historic granite curbing, cobblestones, decorative iron gates, architectural light fixtures, or existing mature specimen palms). +-----------------------------------------------------------------------------+
- | DEMOLITION PLAN DRAFTING SYMBOLOGY |
- | |
- | FEATURE EXISTING TO REMAIN SCHEDULED REMOVAL |
- | ------- ------------------ ----------------- |
- | Asphalt Pavement Light Gray Screen / Solid Heavy Strikethrough|
- | Concrete Walk Dashed Line (Hidden) Cross-Hatched X's |
- | Deciduous Tree Existing Canopy Outline Canopy with 'X' |
- | Underground Pipe Dashed Layer (Screened) Dashed with 'R' |
- | Pavement Boundary Cut N/A Full-Depth Sawcut |
- +-----------------------------------------------------------------------------+
- Full-Depth Sawcutting Requirements
Where existing concrete or asphalt pavement is to be partially removed while an adjacent section remains, the drawing must explicitly specify a clean, full-depth vertical sawcut along the exact removal boundary line:
The Failure Risk: Using a hydraulic jackhammer, excavator bucket, or hoe-ram without a preliminary sawcut creates micro-fractures, ragged edges, subbase disturbance, and spalling along the retained slab. This creates an unmaintainable, raveling joint that fails rapidly under freeze-thaw cycles and vehicular loads.
Detailing Standard: The demolition plan must call out: "Provide clean, full-depth sawcut prior to pavement demolition. Match joint alignment cleanly and seal exposed edges per Detail X/L-701."
Salvage and Sustainability Tracking
Under sustainable rating systems (SITES and LEED), demolition plans must incorporate a Materials Salvage and Diversion Schedule :
Existing concrete slabs crushed on-site for use as recycled aggregate base course (typically saving significant trucking costs and embodied carbon).
Existing asphalt milled for reclaimed asphalt pavement (RAP).
Salvageable topsoil stripped and amended rather than imported from virgin quarries.
2. Tree and Vegetation Protection Plans: CRZ and TPZ
Preserving mature trees requires understanding the physiological reality of root systems. Contrary to the common myth of a deep "taproot mirroring the canopy," over 80% to 90% of a tree's absorbing root system lies within the top 12 to 18 inches of soil , extending horizontally two to three times beyond the visual canopy dripline. TREE CANOPY
- (Visible Dripline)
- | |
- V V
- +------------------+
- | TREE TRUNK |
- | (DBH at 4.5') |
- +--------+---------+
- |
- =======================================|=======================================
- ROOT SYSTEM (Top 12" to 18" of Soil)
- <- - - - - - - - - - - - - - - - - - - | - - - - - - - - - - - - - - - - - - ->
DRIPLINE: Inadequate Boundary | CRZ / TPZ RADIUS:
- | 1.0' to 1.5' per 1" DBH
- | (Extends beyond dripline!)
- Calculating the Critical Root Zone (CRZ) and Tree Protection Zone (TPZ)
On the LARE, candidates must calculate the minimum required radial boundary for root preservation:
Diameter at Breast Height (DBH): The trunk diameter measured at 4.5 feet (1.37 meters) above the natural ground elevation.
The DBH-to-Radius Rule of Thumb: For mature, sensitive, or high-value specimen trees, the radial distance from the trunk to the perimeter of the Tree Protection Zone (TPZ) is calculated at 1.0 to 1.5 feet of radius for every 1 inch of DBH : TPZ Radius (feet) = DBH (inches) × ( 1.0 to 1.5 ) \text{TPZ Radius (feet)} = \text{DBH (inches)} \times (1.0\text{ to }1.5) TPZ Radius (feet) = DBH (inches) × ( 1.0 to 1.5 ) TPZ Total Diameter (feet) = 2 × TPZ Radius \text{TPZ Total Diameter (feet)} = 2 \times \text{TPZ Radius} TPZ Total Diameter (feet) = 2 × TPZ Radius
Mathematical Calculation Example
Scenario: A historic white oak ( Quercus alba ) measures 28 inches DBH.
Conservative / High Sensitivity TPZ Radius: 28 inches × 1.5 ft/inch = 42 feet radial distance 28\text{ inches} \times 1.5\text{ ft/inch} = 42\text{ feet radial distance} 28 inches × 1.5 ft/inch = 42 feet radial distance from the trunk center.
Total Protection Diameter: 42 ft × 2 = 84 feet clear circular diameter 42\text{ ft} \times 2 = 84\text{ feet clear circular diameter} 42 ft × 2 = 84 feet clear circular diameter .
The Dripline Fallacy: If the tree's physical foliage dripline extends only 25 feet from the trunk, placing fencing at the dripline would destroy over 40% of the tree's vital absorbing root network , likely leading to crown decline, vascular wilt, or death within 2 to 5 years.
- 3. Root Pruning, Trunk Protection & Soil Compaction Mitigation
- Tree Protection Fencing Specifications
The physical barrier delineating the TPZ is the single most critical line on the demolition plan. Fencing specifications must withstand aggressive construction environments:
Mandatory Heavy-Duty Standard: 4- to 6-foot-high galvanized steel chain-link fabric , mounted rigidly on 2-inch diameter steel posts driven a minimum of 24 inches directly into the ground at 8- to 10-foot intervals. Post-driven chain link cannot be easily moved by construction laborers or pushed back by bulldozer blades.
The Orange Snow Fence Failure: Flexible orange polyethylene snow fencing mounted on lightweight steel T-posts is universally recognized as inadequate for high-risk urban or institutional sites. Subcontractors routinely unclip, crush, or shift snow fences to park pickup trucks, stage gravel, or dump concrete wash water.
Signage: Durable weatherproof aluminum signs must be mounted every 50 feet along the fence reading: "TREE PROTECTION ZONE – DO NOT ENTER – NO STORAGE, PARKING, EXCAVATION, OR CLEANING OF EQUIPMENT. VIOLATORS SUBJECT TO LIQUIDATED DAMAGES." RIGID CHAIN-LINK FENCE TEMPORARY CRANE MATTING
- +---+---+---+---+---+---+---+ ==============================
- | | | | | | | | 6' Height [Heavy Timber / Composite Mat]
- | | [TPZ WARNING] | | | ------------------------------
- | | | | | | | | [6" to 12" Wood Chip Mulch ]
- +---+---+---+---+---+---+---+ ==============================
- | | | | Undisturbed Native Soil
- === === === === (Grade) (Compaction prevented below)
- | | | | 24" Driven Depth
- Root Pruning Standards (ANSI A300 Part 8)
When trenching or excavation is unavoidable near the perimeter of the CRZ:
No Excavator Tearing: Excavator teeth, backhoe buckets, and bulldozers must never be permitted to rip through root systems. Ripping shatters roots lengthwise, tearing the vascular cambium back toward the trunk and introducing fungal root rot pathogens.
Mechanical Trenching / Rock Saw: Trenching along the outer limit of disturbance must be pre-cut using a specialized vibrating rock saw, mechanical trenching blade, or supersonic air-spade (pneumatic soil excavation).
Manual Clean Cuts: Roots larger than 1.5 to 2 inches in diameter must be cleanly severed at right angles using sharp bypass loppers, a hand pruning saw, or a clean diamond-bladed saw, leaving a smooth, unfrayed cut edge that forms wound periderm rapidly.
Moisture Maintenance: Exposed severed root faces must be covered immediately with damp burlap, unamended native topsoil, or geotextile and kept continuously moist until backfilling occurs.
Mitigating Soil Compaction from Temporary Vehicular Traffic
Where construction equipment must cross the root zone of a preserved tree:
Mulch Cushion: Lay a minimum of 6 to 12 inches of coarse, uncompacted organic wood chip mulch directly over the root zone surface.
Load Distribution Mats: Place heavy timber crane mats, interlocking structural composite mats, or 3/4-inch exterior-grade plywood sheets directly over the mulch layer.
Mechanics: The rigid mats distribute the concentrated dynamic wheel loads of heavy machinery across a broad surface area, while the thick mulch layer absorbs shear deformation, preventing the compression of macro-pore soil spaces and preserving root oxygenation.
Trunk Armor (Boxing)
Where equipment must operate in close proximity to mature tree trunks:
Wrap the trunk in a protective layer of heavy closed-cell foam or layered burlap.
Strapping vertical 2" x 4" or 2" x 6" dimensional lumber around the circumference of the trunk using adjustable steel strapping bands (never driving nails, screws, or staples into the tree bark).