8.6 Planting Plans, Plant Schedules & Installation Details

Landscape Architect Registration Examination L.A.R.E.

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Project Management, Legal Framework & Contracts

1.1 Professional Practice, Ethics & the HSW Mandate 1.2 Standard of Care, Responsible Charge & Sealing Documents 1.3 Professional Services Agreements & Contract Clauses 1.4 Fee Structures, Compensation Models & Billing 1.5 Project Scheduling, CPM & Budget Management 1.6 Risk Management, Professional Liability & Insurance

2 Chapter 2: Site Inventory, Surveying & Regulatory Framework

2.1 Boundary Surveys, Legal Descriptions & Survey Datums 2.2 Topographic Surveys, Easements & Encumbrances 2.3 Desktop Inventory, GIS Data & Field Reconnaissance 2.4 Policy Documents & Prior Planning Studies 2.5 Adjacent Land Use & Contextual Data Collection 2.6 Stakeholder Engagement & Public Participation 2.7 Zoning Frameworks, Dimensional Standards & FAR 2.8 Parking Standards, Buffer Yards & Zoning Relief 2.9 Clean Water Act Permitting & NEPA Review 2.10 ESA, Floodplain, Coastal & Historic Preservation Compliance

3 Chapter 3: Physical, Contextual & Environmental Site Analysis

3.1 Scoping Site Analysis & Synthesizing Opportunities and Constraints 3.2 Geotechnical Investigation & Soil Classification Systems 3.3 Problematic Soil Conditions & Agronomic Soil Quality 3.4 Topographic Interpretation & Slope Suitability 3.5 Watershed Mechanics, Stream Order & FEMA Flood Hazard Zones 3.6 Wetland Delineation, Classification & Riparian Buffers 3.7 Utility Analysis & Infrastructure Capacity 3.8 Visual Resource & Viewshed Analysis 3.9 Contextual Analysis: Appropriate Use & Future Development Impacts 3.10 Microclimates, Solar Orientation & Vegetation Analysis

4 Chapter 4: Stewardship, Climate Resiliency & Design Principles

4.1 SITES v2 & LEED Site Credit Rating Systems 4.2 Life-Cycle Assessment, Embodied Carbon & Ecosystem Services 4.3 Climate Resiliency, Adaptation & Urban Heat Island Mitigation 4.4 Environmental Justice & Social Equity in Site Design 4.5 Cultural Landscapes, Historic Preservation & Adaptive Reuse

5 Chapter 5: Master Planning, Programming & Land Use

5.1 Project Visioning, Goal Setting & Space Programming 5.2 Carrying Capacity Analysis & NRPA Park Classification Standards 5.3 Site Suitability Synthesis & Opportunities/Constraints Mapping 5.4 Land Use Allocation & Development Scenario Evaluation 5.5 Master Plan Deliverables & Design Guidelines 5.6 Capital Improvement Programming, Phasing & Implementation

6 Chapter 6: Schematic Design & Spatial Organization

6.1 Design Intent, Conceptual Diagrams & Form Generation 6.2 Basis of Design, Alternatives Evaluation & the Preferred Scheme 6.3 Spatial Hierarchy, Outdoor Rooms & Proportion 6.4 Pedestrian Circulation Networks & Environmental Wayfinding 6.5 ADA & PROWAG Accessible Route Design 6.6 Multimodal Transportation, Vehicular Circulation & Parking Layout

7 Chapter 7: Design Development, Materials & Planting Systems

7.1 Paving Systems: Rigid, Flexible & Unit Pavers 7.2 Retaining Walls, Earth Pressure & Wall Drainage 7.3 Wall System Selection, Fences, Screens & Gates 7.4 Site Furnishings: Selection, Materiality & Anchoring 7.5 Exterior Lighting, Photometrics, Dark Sky & Electrical Safety 7.6 Public Playground Safety: CPSC & ASTM Standards 7.7 Planting Design Principles & Ecological Matching 7.8 Water Conservation, Xeriscaping & Irrigation System Principles 7.9 Opinions of Probable Cost & Value Engineering

8 Chapter 8: Construction Drawings, Layout & Detailing

8.1 Drawing Set Hierarchy, Sheet Standards & Drafting Conventions 8.2 Interdisciplinary Coordination & QA/QC Review 8.3 Demolition Plans & Tree Protection Requirements 8.4 Site Preparation: Clearing, Grubbing, Topsoil & Utility Abandonment 8.5 Layout, Dimensioning & Materials Plans 8.6 Planting Plans, Plant Schedules & Installation Details 8.7 Technical Detailing: Pavements, Curbs & Joint Assemblies 8.8 Retaining Wall, Stair & Ramp Detailing Standards

9 Chapter 9: Construction Specifications & Bidding

9.1 CSI MasterFormat Divisions & SectionFormat Structure 9.2 Specification Writing Methods & the Drawings–Specifications Relationship 9.3 Project Manual, General Conditions & Front-End Documents 9.4 Bid Requirements, Bid Forms & Addenda Management 9.5 Pre-Bid Procedures, Bid Opening & Contractor Evaluation

10 Chapter 10: Construction Administration, Submittals & Changes

10.1 Pre-Construction Conference & Construction Administration Authority 10.2 Initial Decision Maker, Communication Protocols & Project Records 10.3 Submittals, Shop Drawings, Product Data & Samples 10.4 Requests for Information (RFIs) & Technical Clarifications 10.5 Change Orders, Construction Change Directives & Claims

11 Chapter 11: Field Observation, Quality Control & Close-Out

11.1 Field Observations, Site Reports & Non-Conforming Work 11.2 Quality Control, Material Testing & Inspections 11.3 Substantial Completion, Punch Lists & Retainage 11.4 Project Close-Out, Guarantees, Warranties & Final Acceptance

12 Chapter 12: Contour Interpretation, Grading & Earthwork Calculations

12.1 Contour Rules & Topographic Landform Interpretation 12.2 Spot Elevations & Contour Interpolation Calculations 12.3 Slope Formulas, Maximum Gradients & Cross Slopes 12.4 Earthwork Calculations: Average End Area & Grid Methods 12.5 Cut and Fill Balancing, Shrinkage, Swell & Mass Haul 12.6 Reviewing Grading Design: Error Detection & Constructability

13 Chapter 13: Stormwater Hydrology, Runoff & BMP Design

13.1 Hydrologic Cycle, Watershed Delineation & Time of Concentration 13.2 Peak Runoff Estimation: The Rational Method (Q = CiA) 13.3 NRCS Curve Number Method & Runoff Hydrographs 13.4 LID Principles, Water Quality Volume & Bioretention Design 13.5 Bioswales, Permeable Pavement, Green Roofs & Harvesting

14 Chapter 14: Site Drainage Systems, Hydraulics & Erosion Control

14.1 Open Channel Hydraulics, Manning’s Equation & Swale Design 14.2 Gutter Flow, Spread & Roadway Inlet Hydraulics 14.3 Subsurface Drainage, Catch Basins & Pipe Invert Calculations 14.4 Stormwater Storage: Detention, Retention & Water Quality Basins 14.5 Reviewing Drainage Plans & Evaluating Design Alternatives 14.6 Erosion Mechanics, RUSLE & the NPDES/SWPPP Framework 14.7 Erosion & Sediment Control BMPs, Basins & Site Stabilization

8.6 Planting Plans, Plant Schedules & Installation Details

Key Takeaways Explain This Topic AI

A plant schedule must state botanical name, common name, quantity, size (caliper, height, or container), root condition (B&B, container, or bare root), and spacing, since any omitted column becomes a contractor judgment call.

ANSI Z60.1 American Standard for Nursery Stock defines the relationship between caliper and minimum root ball diameter, and is the standard a specification cites to reject undersized root balls.

The root flare must be visible and set flush with or 1 to 2 inches above finished grade; planting too deep is the leading cause of premature urban tree mortality through stem-girdling roots.

Planting pits should be dug two to three times the root ball width with sloped sides but no deeper than the root ball height, so the ball rests on undisturbed soil and cannot settle.

Quantities shown on the plan govern over the schedule when the two conflict, so the schedule must be reconciled against a plan count before issuing for bid.

Last updated: September 2026

  • 1. Planting Documentation: Schedules, Standards & Calculations
  • Botanical Nomenclature Standards

Landscape construction documents must adhere to the International Code of Nomenclature for algae, fungi, and plants (ICN):

Format: Genus (capitalized, italicized) + specific epithet (lowercase, italicized) + 'Cultivar' (capitalized, roman type, enclosed in single quotation marks).

  • Correct: Quercus rubra 'Splendens'
  • Incorrect: Quercus Rubra "Splendens"

Common names must never stand alone on a planting schedule because a single common name may refer to half a dozen distinct botanical species with radically different soil and moisture requirements.

Nursery Stock Conditions (ANSI Z60.1)

Governed by the American Standard for Nursery Stock (ANSI Z60.1):

Condition Definition & Production Method Critical Advantages Primary Vulnerabilities & Failure Risks

Bare Root (BR) Dormant field-grown plants dug without soil around roots; washed and packed in moist sawdust/peat. Lowest cost; extremely light to transport; entire root system is visible for inspection. Must be planted strictly during dormant early spring; roots desiccate and die within minutes if exposed to wind/sun.

Balled & Burlapped (B&B) Field-grown plants dug with a firm cohesive soil ball, wrapped in burlap, and laced in a wire basket. Heavy root mass; stabilizes tall trees against wind throw; wide seasonal planting window. Destroys up to 85%–90% of fine absorbing root system during field digging; heavy root balls require cranes.

Container-Grown Plants grown entirely in plastic pots, fabric bags, or air-root pruning containers in soilless mix. Available for installation year-round; root system remains 100% intact; easy handling. High risk of circling, pot-bound roots that develop into fatal stem-girdling roots; light potting soil dries rapidly in ground.

Trunk Caliper vs. DBH vs. Height

Caliper: The standard measurement for nursery-grown landscape trees under ANSI Z60.1. Measured at 6 inches above ground for trees up to and including 4-inch caliper; measured at 12 inches above ground for trees larger than 4-inch caliper.

Diameter at Breast Height (DBH): Used strictly by arborists and foresters to measure existing mature trees in the field , taken at 4.5 feet (54 inches) above ground .

Height & Spread: Used for multi-stem small trees, columnar evergreens, and shrubs (e.g., 6–8 ft ht B&B conifer).

Plant Spacing Formulas: Square vs. Triangular Spacing

When planting ground covers or massed shrub beds, plants can be laid out in an orthogonal square grid or an offset equilateral triangular grid: SQUARE SPACING GRID TRIANGULAR (OFFSET) SPACING GRID

  • S S
  • *-----------* *-----------*
  • | | \ / \ /
  • | A = S² | \ / \ /
  • | | \/ h \/
  • *-----------* *------* h = S x 0.866
  • A = S² x 0.866

Square Spacing Formula: Area per plant = S 2 \text{Area per plant} = S^2 Area per plant = S 2 Number of Plants = Total Bed Area S 2 \text{Number of Plants} = \frac{\text{Total Bed Area}}{S^2} Number of Plants = S 2 Total Bed Area ​

Triangular Spacing Formula: Area per plant = S 2 × 0.866 \text{Area per plant} = S^2 \times 0.866 Area per plant = S 2 × 0.866 Number of Plants = Total Bed Area S 2 × 0.866 \text{Number of Plants} = \frac{\text{Total Bed Area}}{S^2 \times 0.866} Number of Plants = S 2 × 0.866 Total Bed Area ​

The Spacing Constant: An equilateral triangular grid covers ground more evenly and requires 15.5% more plants (1 / 0.866 = 1.155) than a square grid at the identical spacing ( S S S ).

2. Technical Tree & Shrub Planting Details

Field research by modern arboricultural researchers (e.g., Dr. Gary Watson, Dr. Kim Coder) has radically updated technical planting details. Deviating from these modern standards causes premature tree mortality: MODERN TREE PLANTING DETAIL

  • No mulch against trunk! 2" - 3" Shredded Bark Mulch
  • (Keep 3"-4" clear) (Over entire excavation)
  • \ /
  • v v

| | | . . . . . .

  • =======/ \=============================*-----------*===== Finished Grade
  • / Root \ <-- Root Flare FLUSH or | Backfill | ^
  • / Flare \ 1"-2" ABOVE grade! | Native | | Root Ball
  • [===========] | Soil | | Height
  • | Root | <--- Top 1/3 Burlap & | (No | |
  • | Ball | Wire Cut & Removed! |Amendments)| v
  • +-----------+--------------------------*-----------*-----
  • | Undisturbed Native Subgrade Soil (Prevents Settling) |
  • <---------------- 2x to 3x Root Ball Width ------------->
  • Key Construction Specifications

Excavation Geometry: The planting hole must be dug 2 to 3 times the diameter of the root ball , with sloped sides. The wider the hole, the faster horizontal lateral roots establish into the surrounding site soil.

Depth & Undisturbed Base: The depth of the planting pit must be slightly less than the height of the root ball . The bottom of the root ball must rest directly on firm, undisturbed native subgrade . If loose soil is placed beneath the root ball, the heavy ball will settle over time, sinking the trunk below grade.

Root Flare (Trunk Flare) Positioning: The root flare—the noticeable swelling where top lateral roots branch out from the trunk base—must be completely visible and positioned FLUSH with or 1 to 2 inches ABOVE finished grade . Planting too deep is the number one cause of premature urban tree mortality ; burying the root flare suffocates roots of oxygen and induces adventitious roots that encircle the trunk, becoming lethal stem-girdling roots that strangle vascular cambium.

Wire Basket and Burlap Removal: Once the root ball is positioned and secured in the pit, the contractor must cut and completely remove the top 1/3 to 1/2 of the wire basket, all twine, and all burlap . Synthetic burlap, treated burlap, and nylon twine will never rot and must be removed entirely to prevent root constriction.

Backfill Soil Physics (No Soil Amendments): Backfill with 100% native excavated site soil . Research conclusively proves that amending the planting hole with rich organic matter (peat moss, compost) creates a sharp textural boundary. Water is held tightly in the fine amended pocket (the "bathtub effect" drowning roots), and developing roots refuse to cross the soil interface into the surrounding unamended native soil, creating a self-rootbound tree.

Mulching Standards: Apply 2 to 3 inches of shredded hardwood bark mulch across the entire excavated zone to conserve moisture and suppress weeds. Keep mulch 3 to 4 inches away from the trunk flare . Piling mulch up against the trunk ("mulch volcanoes") keeps bark continuously wet, causing bark rot, fungal infections, and rodent girdling.

Staking & Guying Rules: Trees should be staked only when strictly necessary (sites with extreme winds, high vandalism, steep slopes, or loose sandy soils). When staking is required, use broad, flexible webbing straps (never bare wire run through a garden hose) attached loosely to allow the trunk to sway slightly in the wind. Trunk sway stimulates the production of reaction wood (caliper taper) and encourages deep root anchoring. All stakes and guy wires must be removed within one growing season (maximum 1 year) to prevent trunk strangulation.

3. Real-World Case Scenario: The Corporate Headquarters Arboretum

Scenario: A landscape architect is detailing a planting plan for a new corporate campus situated on a heavily disturbed former agricultural site in Ohio (USDA Zone 6a). Soil tests indicate heavily compacted clay subsoils with an alkaline pH of 7.8 and severe drainage impedance. The client requests a grand allée of 3-inch caliper shade trees along the entrance drive and a 2-acre naturalized pollinator meadow.

Design Development Solution:

Tree Selection for Edaphic Matching: The designer completely avoids Pin Oak ( Quercus palustris ) due to the 7.8 pH, which would cause severe iron chlorosis. Instead, the designer selects Bur Oak ( Quercus macrocarpa ) and Chinkapin Oak ( Quercus muehlenbergii ), both native calciphiles that thrive in alkaline clay soils.

Planting Detail Adjustments: To counteract poorly drained clay, the trees are specified with root flares set 2 to 3 inches above finished grade on low, broad earth mounds. The planting holes are specified 3 times the root ball diameter , backfilled entirely with native site soil (no peat moss amendments). The contractor is specified to cut away the top half of all wire baskets and burlap.

Meadow Succession & Spacing: The 2-acre meadow is seeded with a mix of native warm-season grasses ( Schizachyrium scoparium ) and prairie forbs ( Echinacea , Asclepias ), combined with an oats ( Avena sativa ) annual cover crop to stabilize the soil during the first year. Ground cover plugs along the building entry are detailed in an equilateral triangular grid at 12 inches on center , utilizing the S 2 × 0.866 S^2 \times 0.866 S 2 × 0.866 formula to ensure rapid visual closure.