10.3 Submittals, Shop Drawings, Product Data & Samples

Landscape Architect Registration Examination L.A.R.E.

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Project Management, Legal Framework & Contracts

1.1 Professional Practice, Ethics & the HSW Mandate 1.2 Standard of Care, Responsible Charge & Sealing Documents 1.3 Professional Services Agreements & Contract Clauses 1.4 Fee Structures, Compensation Models & Billing 1.5 Project Scheduling, CPM & Budget Management 1.6 Risk Management, Professional Liability & Insurance

2 Chapter 2: Site Inventory, Surveying & Regulatory Framework

2.1 Boundary Surveys, Legal Descriptions & Survey Datums 2.2 Topographic Surveys, Easements & Encumbrances 2.3 Desktop Inventory, GIS Data & Field Reconnaissance 2.4 Policy Documents & Prior Planning Studies 2.5 Adjacent Land Use & Contextual Data Collection 2.6 Stakeholder Engagement & Public Participation 2.7 Zoning Frameworks, Dimensional Standards & FAR 2.8 Parking Standards, Buffer Yards & Zoning Relief 2.9 Clean Water Act Permitting & NEPA Review 2.10 ESA, Floodplain, Coastal & Historic Preservation Compliance

3 Chapter 3: Physical, Contextual & Environmental Site Analysis

3.1 Scoping Site Analysis & Synthesizing Opportunities and Constraints 3.2 Geotechnical Investigation & Soil Classification Systems 3.3 Problematic Soil Conditions & Agronomic Soil Quality 3.4 Topographic Interpretation & Slope Suitability 3.5 Watershed Mechanics, Stream Order & FEMA Flood Hazard Zones 3.6 Wetland Delineation, Classification & Riparian Buffers 3.7 Utility Analysis & Infrastructure Capacity 3.8 Visual Resource & Viewshed Analysis 3.9 Contextual Analysis: Appropriate Use & Future Development Impacts 3.10 Microclimates, Solar Orientation & Vegetation Analysis

4 Chapter 4: Stewardship, Climate Resiliency & Design Principles

4.1 SITES v2 & LEED Site Credit Rating Systems 4.2 Life-Cycle Assessment, Embodied Carbon & Ecosystem Services 4.3 Climate Resiliency, Adaptation & Urban Heat Island Mitigation 4.4 Environmental Justice & Social Equity in Site Design 4.5 Cultural Landscapes, Historic Preservation & Adaptive Reuse

5 Chapter 5: Master Planning, Programming & Land Use

5.1 Project Visioning, Goal Setting & Space Programming 5.2 Carrying Capacity Analysis & NRPA Park Classification Standards 5.3 Site Suitability Synthesis & Opportunities/Constraints Mapping 5.4 Land Use Allocation & Development Scenario Evaluation 5.5 Master Plan Deliverables & Design Guidelines 5.6 Capital Improvement Programming, Phasing & Implementation

6 Chapter 6: Schematic Design & Spatial Organization

6.1 Design Intent, Conceptual Diagrams & Form Generation 6.2 Basis of Design, Alternatives Evaluation & the Preferred Scheme 6.3 Spatial Hierarchy, Outdoor Rooms & Proportion 6.4 Pedestrian Circulation Networks & Environmental Wayfinding 6.5 ADA & PROWAG Accessible Route Design 6.6 Multimodal Transportation, Vehicular Circulation & Parking Layout

7 Chapter 7: Design Development, Materials & Planting Systems

7.1 Paving Systems: Rigid, Flexible & Unit Pavers 7.2 Retaining Walls, Earth Pressure & Wall Drainage 7.3 Wall System Selection, Fences, Screens & Gates 7.4 Site Furnishings: Selection, Materiality & Anchoring 7.5 Exterior Lighting, Photometrics, Dark Sky & Electrical Safety 7.6 Public Playground Safety: CPSC & ASTM Standards 7.7 Planting Design Principles & Ecological Matching 7.8 Water Conservation, Xeriscaping & Irrigation System Principles 7.9 Opinions of Probable Cost & Value Engineering

8 Chapter 8: Construction Drawings, Layout & Detailing

8.1 Drawing Set Hierarchy, Sheet Standards & Drafting Conventions 8.2 Interdisciplinary Coordination & QA/QC Review 8.3 Demolition Plans & Tree Protection Requirements 8.4 Site Preparation: Clearing, Grubbing, Topsoil & Utility Abandonment 8.5 Layout, Dimensioning & Materials Plans 8.6 Planting Plans, Plant Schedules & Installation Details 8.7 Technical Detailing: Pavements, Curbs & Joint Assemblies 8.8 Retaining Wall, Stair & Ramp Detailing Standards

9 Chapter 9: Construction Specifications & Bidding

9.1 CSI MasterFormat Divisions & SectionFormat Structure 9.2 Specification Writing Methods & the Drawings–Specifications Relationship 9.3 Project Manual, General Conditions & Front-End Documents 9.4 Bid Requirements, Bid Forms & Addenda Management 9.5 Pre-Bid Procedures, Bid Opening & Contractor Evaluation

10 Chapter 10: Construction Administration, Submittals & Changes

10.1 Pre-Construction Conference & Construction Administration Authority 10.2 Initial Decision Maker, Communication Protocols & Project Records 10.3 Submittals, Shop Drawings, Product Data & Samples 10.4 Requests for Information (RFIs) & Technical Clarifications 10.5 Change Orders, Construction Change Directives & Claims

11 Chapter 11: Field Observation, Quality Control & Close-Out

11.1 Field Observations, Site Reports & Non-Conforming Work 11.2 Quality Control, Material Testing & Inspections 11.3 Substantial Completion, Punch Lists & Retainage 11.4 Project Close-Out, Guarantees, Warranties & Final Acceptance

12 Chapter 12: Contour Interpretation, Grading & Earthwork Calculations

12.1 Contour Rules & Topographic Landform Interpretation 12.2 Spot Elevations & Contour Interpolation Calculations 12.3 Slope Formulas, Maximum Gradients & Cross Slopes 12.4 Earthwork Calculations: Average End Area & Grid Methods 12.5 Cut and Fill Balancing, Shrinkage, Swell & Mass Haul 12.6 Reviewing Grading Design: Error Detection & Constructability

13 Chapter 13: Stormwater Hydrology, Runoff & BMP Design

13.1 Hydrologic Cycle, Watershed Delineation & Time of Concentration 13.2 Peak Runoff Estimation: The Rational Method (Q = CiA) 13.3 NRCS Curve Number Method & Runoff Hydrographs 13.4 LID Principles, Water Quality Volume & Bioretention Design 13.5 Bioswales, Permeable Pavement, Green Roofs & Harvesting

14 Chapter 14: Site Drainage Systems, Hydraulics & Erosion Control

14.1 Open Channel Hydraulics, Manning’s Equation & Swale Design 14.2 Gutter Flow, Spread & Roadway Inlet Hydraulics 14.3 Subsurface Drainage, Catch Basins & Pipe Invert Calculations 14.4 Stormwater Storage: Detention, Retention & Water Quality Basins 14.5 Reviewing Drainage Plans & Evaluating Design Alternatives 14.6 Erosion Mechanics, RUSLE & the NPDES/SWPPP Framework 14.7 Erosion & Sediment Control BMPs, Basins & Site Stabilization

10.3 Submittals, Shop Drawings, Product Data & Samples

Key Takeaways Explain This Topic AI

Submittals are not Contract Documents; they are administrative mechanisms prepared by the contractor, fabricators, and manufacturers to demonstrate how they intend to execute the design intent.

Under AIA Document A201 Section 3.12.5, the General Contractor is contractually mandated to review, verify field dimensions, coordinate trade requirements, and stamp all submittals prior to forwarding them to the Landscape Architect.

The Landscape Architect's review of submittals is strictly limited to checking for conformance with the design concept and general compliance with Contract Documents, never verifying dimensions, quantities, or fabrication methods.

Standard review action stamps include Approved / No Exceptions Taken, Approved as Noted / Make Corrections Noted, Revise and Resubmit, Rejected, and Returned Without Action.

Informational submittals (concrete break test reports, soil compaction tests, nursery health inspection certificates) are submitted for record documentation and do not receive formal design approval action stamps.

Last updated: September 2026

Core Focus: Submittals represent one of the highest areas of administrative liability for landscape architects during construction. The LARE Section 3 exam heavily tests the submittal workflow, the mandatory contractor review stamp, the distinction between Action and Informational submittals, review stamp legal definitions, and the critical legal boundary separating design intent review from contractor dimensional verification.

1. The Submittal Workflow & Legal Status

A fundamental legal concept in construction administration is that Submittals are NOT Contract Documents (AIA Document A201 Section 3.12.4). Contract Documents consist of the Agreement, Conditions of the Contract (General, Supplementary), Drawings, Specifications, Addenda, and executed Modifications. Submittals (shop drawings, product data, samples, mockups) are administrative instruments prepared by the Contractor, subcontractors, and suppliers to illustrate how the contractor proposes to implement the design concept. +--------------------------------------------------------------------------+

  • | SUBMITTAL REVIEW LIFECYCLE |
  • +--------------------------------------------------------------------------+
  • | Trade Subcontractor / Fabricator / Supplier prepares submittal |
  • | │ |
  • | ▼ |
  • | General Contractor (GC) Pre-Review: |
  • | ├─ Verifies field measurements and site dimensions |
  • | ├─ Coordinates inter-trade clearances (e.g., plumbing vs. footings) |
  • | ├─ Checks compliance with technical specifications |
  • | └─ APPLIES SIGNED/DATED GC REVIEW STAMP |
  • | │ |
  • | ├────────────────────────────────────────┐ |
  • | ▼ (Stamped) ▼ (Unstamped) |
  • | Landscape Architect Receives Submittal RETURNED WITHOUT ACTION |
  • | │ (Immediately rejected back |
  • | ▼ to GC without review) |
  • | Landscape Architect Reviews for Design Concept Conformance |
  • | └─ Coordinates with Subconsultants (Civil, Structural, Irrigation) |
  • | │ |
  • | ▼ |
  • | Action Stamp Applied (Approved, Approved as Noted, Revise/Resubmit) |
  • | │ |
  • | ▼ |
  • | Returned to GC ──► Distributed to Subcontractor ──► Fabrication Proceeds |
  • +--------------------------------------------------------------------------+
  • The Mandatory Contractor Pre-Review Stamp

Under AIA Document A201 Section 3.12.5: "The Contractor shall review for compliance with the Contract Documents, approve, and submit to the Architect, Shop Drawings, Product Data, Samples, and similar submittals required by the Contract Documents... By submitting Shop Drawings, Product Data, Samples, and similar submittals, the Contractor represents to the Owner and Architect that the Contractor has (1) reviewed and approved them, (2) determined and verified materials, field measurements, and field construction criteria, and (3) checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents."

Important

The Unstamped Submittal Rule: If a landscape architect receives a submittal directly from a subcontractor, or receives a submittal from the General Contractor that lacks the General Contractor's signed and dated review stamp, the landscape architect must return it immediately without action . Reviewing an unstamped submittal bypasses the contractor's legal responsibility for field dimensions and coordination, effectively assuming that liability onto the design professional.

2. Categorization of Submittal Types

Submittals in landscape architecture fall into two broad contractual classes: Action Submittals (requiring formal design professional review and responsive stamping) and Informational Submittals (submitted for documentation and compliance verification, without design approval stamps). SUBMITTAL CLASSIFICATIONS

  • │
  • +----------------------------------+----------------------------------+
  • │ │
  • ACTION SUBMITTALS INFORMATIONAL SUBMITTALS
  • (Require Design Review & Stamp) (For Record & Compliance Only)
  • ├─ Shop Drawings (Fabrication, structural) ├─ Compaction Test Reports (ASTM D1557)
  • ├─ Product Data (Cut sheets, pumps, lights) ├─ Concrete Cylinder Breaks (ASTM C39)
  • ├─ Material Samples (Stone, pavers, mulch) ├─ Topsoil Chemistry / Agronomic Tests
  • └─ Physical Mockups (Stone walls, unit pavers) └─ Nursery Phytosanitary Certificates
  • 1. Shop Drawings (Action Submittal)

Shop drawings are drawings, diagrams, schedules, and other data specially prepared for the work by the contractor, subcontractor, manufacturer, supplier, or distributor to illustrate some portion of the work.

Landscape Architecture Applications:

Structural fabrication drawings for custom steel shade structures, pergolas, and decorative gates showing member sizes, weld symbols, and bolt patterns.

Reinforcing steel (rebar) placement diagrams for cast-in-place concrete retaining walls, showing lap splices, bends, and bar clearances.

Stone fabrication cutting tickets and shop setting drawings for radial granite steps, curved pool coping, and dimensioned architectural masonry.

Fountain and water feature mechanical room piping layouts, manifold details, and electrical pump panel diagrams.

Precast concrete paver and architectural wall panel shop drawings showing anchor clips, joints, and embedded lifting inserts.

2. Product Data Sheets / Cut Sheets (Action Submittal)

Standard manufacturer product data sheets, catalog illustrations, performance curves, installation instructions, operating charts, and brochures.

Landscape Architecture Applications:

Irrigation central satellite controllers, commercial rotor heads, drip emitters, master valves, and backflow preventers.

Site lighting fixtures, LED bollards, pathway luminaires, and step lights.

Site furnishings: benches, bicycle racks, trash receptacles, tree grates, and bollards.

Drainage geocomposites, root barriers, filter fabrics, and permeable paver polymeric joint sand.

Organic soil amendments, biostimulants, mycorrhizal inoculants, and organic tackifiers.

3. Material Samples (Action Submittal)

Physical samples of specified materials demonstrating full visual range of color, texture, surface finish, grain, and general workmanship.

Landscape Architecture Applications:

Range Samples: Sets of at least 3 to 5 physical stone units showing the full allowable chromatic variation, veining, and texture of natural quarry stone.

Concrete paver sample boards showing color blends and aggregate exposures.

Architectural concrete integral pigment color chips and chemical retarder surface exposure samples.

Factory-applied powder-coat and fluoropolymer paint color swatches on actual aluminum or steel substrates.

Wood samples of specified exterior lumber (e.g., ipê, black locust, western red cedar) showing grain, finish, and protective sealers.

4. Physical On-Site Mockups (Action Submittal)

Full-scale physical assemblies constructed on the project site using actual job materials, equipment, and specified trade labor to establish the visual and technical benchmark of quality.

Landscape Architecture Applications:

Unit Paving Mockup: A minimum 10 ft by 10 ft on-site panel of permeable concrete pavers, demonstrating sub-base compaction, bedding layer, joint sand sweeping, plate compaction, pattern transitions, edge restraints, and cutting alignment.

Stone Masonry Wall Mockup: A 6 ft wide by 4 ft high sample of a stone veneer wall showing mortar joint width, mortar color, joint tooling (raked, flush, concave), corner bonding, and capping.

Cast-in-Place Architectural Concrete Mockup: Demonstrating formliner texture, form-tie hole patching, chamfered edges, and color consistency.

Contractual Rules for Mockups: The mockup must be formally approved in writing by the Landscape Architect prior to beginning full-scale production. The approved mockup is protected and remains on site throughout construction as the standard of quality against which all subsequent work is judged. If permitted by specifications, an approved mockup may be incorporated into the finished work; if rejected, it must be demolished and rebuilt until approved.

5. Informational Submittals & Quality Certifications

Submittals provided to verify that materials and operations meet contract quality requirements. These are reviewed to ensure compliance, documented in the project log, and filed for the record, but do not receive design approval action stamps .

Landscape Architecture Applications:

Geotechnical field density test reports (soil compaction percentages per ASTM D1557 / ASTM D698).

Concrete compressive strength laboratory test reports (7-day and 28-day cylinder breaks per ASTM C39).

Agronomic topsoil laboratory testing reports (pH, organic matter content, soil texture/particle size analysis, cation exchange capacity [CEC], nutrient levels, and heavy metal screening).

State Department of Agriculture nursery phytosanitary inspection certificates certifying plant stock is free of quarantine pests and invasive pathogens.

Mill certificates and non-destructive testing (NDT) reports for structural steel welds.

Installer qualification statements verifying mandatory years of certified commercial experience.

3. Review Action Stamps & Legal Liability Allocation

The wording of the Landscape Architect's review stamp is crafted by professional liability insurers to precisely limit legal exposure.

The Legal Scope of Design Review

Under AIA Document A201 Section 4.2.7: "The Architect will review and approve, or take other appropriate action upon, the Contractor's submittals such as Shop Drawings, Product Data, and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Documents."

Caution

What the Review Stamp DOES NOT Mean:

The Landscape Architect does NOT verify site dimensions, quantities, or field measurements.

The Landscape Architect does NOT approve construction means, methods, techniques, sequences, or procedures.

The Landscape Architect does NOT validate job site safety programs.

The Landscape Architect's approval does NOT relieve the Contractor of responsibility for errors or omissions in shop drawings, or for deviations from the Contract Documents.

Standard Review Action Stamp Terminology +--------------------------------------------------------------------------+

  • | LANDSCAPE ARCHITECT SUBMITTAL ACTION STAMP |
  • +--------------------------------------------------------------------------+
  • | [ ] NO EXCEPTIONS TAKEN (APPROVED) |
  • | Fabrication and procurement may proceed. |
  • | |
  • | [ ] MAKE CORRECTIONS NOTED (APPROVED AS NOTED) |
  • | Fabrication may proceed subject to marked corrections. No resubmittal|
  • | required unless specifically directed. |
  • | |
  • | [ ] REVISE AND RESUBMIT |
  • | Major discrepancies or missing data. Fabrication NOT authorized. |
  • | Contractor must revise and resubmit. |
  • | |
  • | [ ] REJECTED |
  • | Submittal deviates fundamentally from contract documents. |
  • | Complete resubmission of compliant product required. |
  • | |
  • | [ ] RETURNED WITHOUT ACTION |
  • | Submittal lacked GC stamp, was not required, or was uncoordinated. |
  • +--------------------------------------------------------------------------+
  • | Review is only for general conformance with the design concept of the |
  • | Contract Documents. Contractor remains responsible for all dimensions, |
  • | quantities, field coordination, and means and methods of construction. |
  • +--------------------------------------------------------------------------+
  • The Hidden Deviation Rule (AIA A201 Section 3.12.8)

A critical exam scenario involves contractor deviations from the contract documents hidden within shop drawings:

If a contractor submits a shop drawing that changes a specified material (e.g., changes stainless steel fasteners to zinc-plated steel), and the landscape architect stamps the drawing "Approved" without noticing the change, the contractor is STILL contractually liable for the non-conforming substitution .

Under Section 3.12.8, the contractor is not relieved of responsibility for deviations unless:

The contractor specifically calls attention to the deviation in a separate written cover letter at the time of submission; AND

The landscape architect gives specific written approval to the designated deviation as a minor change, or a formal Change Order / CCD is executed.

4. Submittal Log Tracking & Turnaround Timeframes

Efficient submittal processing prevents contractor delay claims. Construction contracts typically stipulate a 14-calendar-day turnaround window (or 10 to 14 business days) for the design professional's review.

The Submittal Schedule (AIA A201 Section 3.10.2)

Promptly after contract award, the General Contractor must prepare and submit a comprehensive Submittal Schedule for the Landscape Architect's approval. The schedule must be coordinated with the construction progress schedule, allowing reasonable time for design review, consultant coordination, and material fabrication lead times.

Essential Fields in a CA Submittal Log

Column Header Description & Purpose

Submittal Number Alphanumeric tracking code (e.g., 32 14 00-01.0 indicating spec section, sequence, revision).

Spec Section & Title CSI MasterFormat classification (e.g., 32 14 00 Unit Paving ).

Description of Item Clear narrative (e.g., "80mm Interlocking Concrete Pavers - Color Range Sample").

Subcontractor / Supplier Originating fabricator, quarry, or nursery.

Date Received from GC Starting timestamp for the contractual review window.

Sent to Subconsultant Date forwarded to civil, structural, or irrigation consultant.

Returned from Consultant Date consultant comments were received by prime Landscape Architect.

Date Returned to GC Concluding timestamp verifying compliance with turnaround timeframe.

Action Taken Official review status code (NET, MCN, R&R, REJ, RWA).

Days in Review Elapsed calendar days (flags potential delay exposure if > 14 days).

5. Submittal Types & Roles Comparison Table

Submittal Type Classification Originator Purpose & Review Scope Approval Stamp Required?

Shop Drawings Action Submittal Contractor / Fabricator Verifies how custom assemblies will be fabricated and erected to achieve design intent. Yes (NET, MCN, R&R, REJ)

Product Data Sheets Action Submittal Manufacturer / Supplier Verifies catalog specifications, physical properties, electrical/hydraulic ratings, and finishes. Yes (NET, MCN, R&R, REJ)

Material Samples Action Submittal Fabricator / Quarry Verifies color range, surface texture, veining, finish, and aesthetic properties. Yes (NET, MCN, R&R, REJ)

Field Mockups Action Submittal General Contractor Establishes full-scale physical standard of quality, jointing, and workmanship on site. Yes (NET, MCN, R&R, REJ)

Soil Compaction Tests Informational Submittal Independent Testing Agency Documents field density compliance with ASTM compaction requirements; filed for record. No (Reviewed & Filed)

Concrete Cylinder Breaks Informational Submittal Independent Testing Agency Documents 7-day and 28-day compressive strength compliance with ASTM C39; filed for record. No (Reviewed & Filed)

Nursery Health Certs Informational Submittal State Dept of Agriculture Documents plant stock is free from agricultural pests and pathogens; filed for record. No (Reviewed & Filed)

6. Real-World Case Scenario: The Custom Corten Arbor Dimensions

Scenario: A landscape architect designs a custom weathering steel (Corten) pergola for a university courtyard. The contract drawings show general layout, footing locations 24 feet on-center, and structural member profiles. The steel fabrication subcontractor prepares detailed shop drawings. On the shop drawings, the drafter incorrectly dimensions the clear span between column base plates as 22'-6" instead of 24'-0". The General Contractor applies its review stamp without verifying the dimension against the foundation plan. The landscape architect reviews the shop drawing, notes that the steel member thickness and weld callouts conform to structural criteria, and stamps the drawing "No Exceptions Taken." The fabricator builds the arbor and delivers it to the site, where it is discovered that the columns do not align with the cast-in-place concrete piers. The General Contractor submits a change order for $18,500 to demolish and relocate the concrete footings, arguing that the landscape architect approved the 22'-6" dimension on the shop drawings.

Contractual Analysis & Resolution:

Liability for Dimensions: Under AIA Document A201 Section 3.12.5 and Section 3.12.8, the General Contractor is contractually obligated to determine and verify all field measurements, construction criteria, and dimensions.

Scope of Design Review: Under Section 4.2.7, the Landscape Architect's review stamp is strictly for checking conformance with the design concept. The review stamp does not constitute verification or approval of dimensions.

Resolution: The Change Order claim is denied. The General Contractor bears sole legal and financial responsibility for the dimensional discrepancy and must modify the steel arbor or bear the cost of adjusting the foundations at no cost to the Owner.

7. Exam Traps & Pitfalls

The "Approved Stamp Validates Dimensions" Trap: A common exam question tests whether an "Approved" stamp makes the designer liable for incorrect dimensions or quantities. It does not. Dimensional verification is the contractor's exclusive contractual responsibility.

The Unstamped Submittal Trap: If presented with an exam scenario where a subcontractor sends shop drawings directly to the landscape architect, or the GC sends drawings without a review stamp, the only correct answer is to return them immediately unreviewed without action .

The Informational Submittal Approval Trap: Exam questions may ask what action stamp the landscape architect should place on concrete cylinder break reports or soil compaction tests. The answer is that informational submittals do not receive approval action stamps ; they are reviewed for compliance and filed for the project record.

The Hidden Deviation Trap: Candidates frequently assume that if a designer approves a shop drawing containing a deviation, the owner is bound to accept it. Unless the contractor explicitly flagged the deviation in a separate written notice and the landscape architect gave written approval to that specific change, the contractor remains contractually obligated to provide what the Contract Documents originally specified.