13.5 Bioswales, Permeable Pavement, Green Roofs & Harvesting

Landscape Architect Registration Examination L.A.R.E.

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Project Management, Legal Framework & Contracts

1.1 Professional Practice, Ethics & the HSW Mandate 1.2 Standard of Care, Responsible Charge & Sealing Documents 1.3 Professional Services Agreements & Contract Clauses 1.4 Fee Structures, Compensation Models & Billing 1.5 Project Scheduling, CPM & Budget Management 1.6 Risk Management, Professional Liability & Insurance

2 Chapter 2: Site Inventory, Surveying & Regulatory Framework

2.1 Boundary Surveys, Legal Descriptions & Survey Datums 2.2 Topographic Surveys, Easements & Encumbrances 2.3 Desktop Inventory, GIS Data & Field Reconnaissance 2.4 Policy Documents & Prior Planning Studies 2.5 Adjacent Land Use & Contextual Data Collection 2.6 Stakeholder Engagement & Public Participation 2.7 Zoning Frameworks, Dimensional Standards & FAR 2.8 Parking Standards, Buffer Yards & Zoning Relief 2.9 Clean Water Act Permitting & NEPA Review 2.10 ESA, Floodplain, Coastal & Historic Preservation Compliance

3 Chapter 3: Physical, Contextual & Environmental Site Analysis

3.1 Scoping Site Analysis & Synthesizing Opportunities and Constraints 3.2 Geotechnical Investigation & Soil Classification Systems 3.3 Problematic Soil Conditions & Agronomic Soil Quality 3.4 Topographic Interpretation & Slope Suitability 3.5 Watershed Mechanics, Stream Order & FEMA Flood Hazard Zones 3.6 Wetland Delineation, Classification & Riparian Buffers 3.7 Utility Analysis & Infrastructure Capacity 3.8 Visual Resource & Viewshed Analysis 3.9 Contextual Analysis: Appropriate Use & Future Development Impacts 3.10 Microclimates, Solar Orientation & Vegetation Analysis

4 Chapter 4: Stewardship, Climate Resiliency & Design Principles

4.1 SITES v2 & LEED Site Credit Rating Systems 4.2 Life-Cycle Assessment, Embodied Carbon & Ecosystem Services 4.3 Climate Resiliency, Adaptation & Urban Heat Island Mitigation 4.4 Environmental Justice & Social Equity in Site Design 4.5 Cultural Landscapes, Historic Preservation & Adaptive Reuse

5 Chapter 5: Master Planning, Programming & Land Use

5.1 Project Visioning, Goal Setting & Space Programming 5.2 Carrying Capacity Analysis & NRPA Park Classification Standards 5.3 Site Suitability Synthesis & Opportunities/Constraints Mapping 5.4 Land Use Allocation & Development Scenario Evaluation 5.5 Master Plan Deliverables & Design Guidelines 5.6 Capital Improvement Programming, Phasing & Implementation

6 Chapter 6: Schematic Design & Spatial Organization

6.1 Design Intent, Conceptual Diagrams & Form Generation 6.2 Basis of Design, Alternatives Evaluation & the Preferred Scheme 6.3 Spatial Hierarchy, Outdoor Rooms & Proportion 6.4 Pedestrian Circulation Networks & Environmental Wayfinding 6.5 ADA & PROWAG Accessible Route Design 6.6 Multimodal Transportation, Vehicular Circulation & Parking Layout

7 Chapter 7: Design Development, Materials & Planting Systems

7.1 Paving Systems: Rigid, Flexible & Unit Pavers 7.2 Retaining Walls, Earth Pressure & Wall Drainage 7.3 Wall System Selection, Fences, Screens & Gates 7.4 Site Furnishings: Selection, Materiality & Anchoring 7.5 Exterior Lighting, Photometrics, Dark Sky & Electrical Safety 7.6 Public Playground Safety: CPSC & ASTM Standards 7.7 Planting Design Principles & Ecological Matching 7.8 Water Conservation, Xeriscaping & Irrigation System Principles 7.9 Opinions of Probable Cost & Value Engineering

8 Chapter 8: Construction Drawings, Layout & Detailing

8.1 Drawing Set Hierarchy, Sheet Standards & Drafting Conventions 8.2 Interdisciplinary Coordination & QA/QC Review 8.3 Demolition Plans & Tree Protection Requirements 8.4 Site Preparation: Clearing, Grubbing, Topsoil & Utility Abandonment 8.5 Layout, Dimensioning & Materials Plans 8.6 Planting Plans, Plant Schedules & Installation Details 8.7 Technical Detailing: Pavements, Curbs & Joint Assemblies 8.8 Retaining Wall, Stair & Ramp Detailing Standards

9 Chapter 9: Construction Specifications & Bidding

9.1 CSI MasterFormat Divisions & SectionFormat Structure 9.2 Specification Writing Methods & the Drawings–Specifications Relationship 9.3 Project Manual, General Conditions & Front-End Documents 9.4 Bid Requirements, Bid Forms & Addenda Management 9.5 Pre-Bid Procedures, Bid Opening & Contractor Evaluation

10 Chapter 10: Construction Administration, Submittals & Changes

10.1 Pre-Construction Conference & Construction Administration Authority 10.2 Initial Decision Maker, Communication Protocols & Project Records 10.3 Submittals, Shop Drawings, Product Data & Samples 10.4 Requests for Information (RFIs) & Technical Clarifications 10.5 Change Orders, Construction Change Directives & Claims

11 Chapter 11: Field Observation, Quality Control & Close-Out

11.1 Field Observations, Site Reports & Non-Conforming Work 11.2 Quality Control, Material Testing & Inspections 11.3 Substantial Completion, Punch Lists & Retainage 11.4 Project Close-Out, Guarantees, Warranties & Final Acceptance

12 Chapter 12: Contour Interpretation, Grading & Earthwork Calculations

12.1 Contour Rules & Topographic Landform Interpretation 12.2 Spot Elevations & Contour Interpolation Calculations 12.3 Slope Formulas, Maximum Gradients & Cross Slopes 12.4 Earthwork Calculations: Average End Area & Grid Methods 12.5 Cut and Fill Balancing, Shrinkage, Swell & Mass Haul 12.6 Reviewing Grading Design: Error Detection & Constructability

13 Chapter 13: Stormwater Hydrology, Runoff & BMP Design

13.1 Hydrologic Cycle, Watershed Delineation & Time of Concentration 13.2 Peak Runoff Estimation: The Rational Method (Q = CiA) 13.3 NRCS Curve Number Method & Runoff Hydrographs 13.4 LID Principles, Water Quality Volume & Bioretention Design 13.5 Bioswales, Permeable Pavement, Green Roofs & Harvesting

14 Chapter 14: Site Drainage Systems, Hydraulics & Erosion Control

14.1 Open Channel Hydraulics, Manning’s Equation & Swale Design 14.2 Gutter Flow, Spread & Roadway Inlet Hydraulics 14.3 Subsurface Drainage, Catch Basins & Pipe Invert Calculations 14.4 Stormwater Storage: Detention, Retention & Water Quality Basins 14.5 Reviewing Drainage Plans & Evaluating Design Alternatives 14.6 Erosion Mechanics, RUSLE & the NPDES/SWPPP Framework 14.7 Erosion & Sediment Control BMPs, Basins & Site Stabilization

13.5 Bioswales, Permeable Pavement, Green Roofs & Harvesting

Key Takeaways Explain This Topic AI

Manning's roughness coefficient for a shallow vegetated swale where flow depth is within the grass height is roughly 0.15 to 0.30, far higher than the 0.03 used for mown channel flow over the vegetation.

Water quality treatment in a swale depends on hydraulic residence time, commonly a minimum of 9 minutes, which is achieved through low longitudinal slope, dense vegetation, and check dams rather than added length alone.

Permeable interlocking concrete pavement must be underlain by an impermeable geomembrane and underdrained where infiltration would threaten structures, contaminate groundwater at a brownfield, or saturate expansive or collapsible soils.

Extensive green roofs use 3 to 6 inches of media with succulent and sedum planting and low structural load, while intensive green roofs carry deeper media, larger plants, irrigation, and substantially greater dead load.

Cistern sizing is driven by the relationship between catchment area, rainfall pattern, and demand; a cistern sized only on catchment area will overflow constantly or run dry.

Last updated: September 2026

  • 1. Bioswales & Vegetative Filter Strips
  • Bioswales (Enhanced Vegetated Swales)

A bioswale is an engineered, gently sloped linear drainage course combining conveyance with infiltration and filtration. Unlike traditional turf grass ditches, bioswales incorporate engineered soil media and underdrains beneath a vegetated channel. +-------------------------------------------------------------------------+

  • | BIOSWALE CROSS-SECTION & LONGITUDINAL PROFILE |
  • +-------------------------------------------------------------------------+
  • | Trapezoidal Channel (3:1 side slopes) |
  • | +------------------------------------+ Water Quality Depth <= 0.5' |
  • | | Dense Vegetation (n = 0.20-0.24) | Conveyance Depth <= 1.5' |
  • | +------------------------------------+ |
  • | | Engineered Soil Media (24"-30") | |
  • | +------------------------------------+ |
  • | | ASTM No. 57 Stone & Underdrain Pipe| |
  • | +------------------------------------+ |
  • | |
  • | LONGITUDINAL PROFILE WITH CHECK DAMS (Slopes > 2%) |
  • | Check Dam |
  • | | Water Quality Ponding Pool |
  • | Ground Slope v v |
  • | ===============[#]-----------------[#]================> |
  • | ^ ^ |
  • | Stone or Timber Weir with Center Notch |
  • +-------------------------------------------------------------------------+

Cross-Section Geometry: Trapezoidal or parabolic cross-section. Bottom width must measure 2 to 8 feet (widths > 8 ft encourage braided, meandering rills; widths < 2 ft concentrate velocities, causing erosion). Side slopes should be 3:1 (33.3%) or flatter (4:1 ideal) for bank stability and maintenance safety.

Hydraulic Roughness Mechanics:

Under shallow water quality flow depths (<= 0.5 foot), grass blades remain erect, creating immense friction: Manning's n = 0.20 to 0.24 .

Under deep storm conveyance depths (> 1.5 feet), high velocities push vegetation flat, causing roughness to plunge to Manning's n = 0.030 to 0.050 .

Velocity Ceilings: Flow velocity must remain <= 1.0 ft/s during the water quality storm to allow suspended particulates to settle. For the 10-year conveyance storm, peak velocity must not exceed 3.0 to 4.0 ft/s to prevent soil scour.

Check Dams: On longitudinal swale slopes steeper than 2.0% , check dams (constructed of riprap stone, concrete, or rot-resistant timbers) must be placed at intervals to step the grade down. Each check dam must incorporate a central weir notch that is at least 6 inches lower than the outer edges to prevent water from cutting around the abutments and scouring the banks.

Hydraulic Residence Time (HRT): The swale length must ensure that runoff takes a minimum of 5 to 10 minutes to travel through the system during the water quality design storm, allowing adequate biological contact and sediment settling.

Vegetative Filter Strips

A vegetative filter strip is a uniformly graded, planar band of dense turf or herbaceous vegetation designed to accept sheet flow from an adjacent impervious surface (such as a parking lot or roadway):

Longitudinal slopes should be 1% to 5% (maximum 8% to prevent rill formation).

The maximum allowable flow length of the contributing impervious surface discharging to a filter strip is 75 feet (150 feet across pervious surfaces).

Level Spreader / Gravel Diaphragm: Runoff must enter the filter strip as uniform sheet flow. A pea gravel diaphragm (a trench filled with ASTM No. 8 stone) or a notched concrete curb flush with the pavement must be installed at the pavement edge to dissipate energy and prevent concentrated rivulets from gouging the turf.

2. Permeable Pavement Systems

Permeable pavements replace impervious asphalt and concrete, allowing storm runoff to infiltrate directly through the surface into an underlying open-graded aggregate reservoir where it is temporarily stored until it infiltrates into the native subgrade or exits through an underdrain. +-------------------------------------------------------------------------+

  • | PERMEABLE INTERLOCKING CONCRETE PAVER (PICP) PROFILE |
  • +-------------------------------------------------------------------------+
  • | +------------------------------------+ Pavers: 3-1/8" (80mm) with Stone |
  • | | PICP Concrete Pavers (ASTM C936) | Joints filled with No. 8/89 Stone|
  • | +------------------------------------+ Bedding: 2" of ASTM No. 8 Stone |
  • | | Bedding Layer (ASTM No. 8 Stone) | |
  • | +------------------------------------+ Base: 4" of Open ASTM No. 57 |
  • | | Base Reservoir (ASTM No. 57 Stone) | |
  • | +------------------------------------+ Subbase Reservoir: 6" to 24"+ |
  • | | Subbase Reservoir (ASTM No. 2 Stone| Clean, crushed, angular stone |
  • | | 30% to 40% Void Space) | (ASTM No. 2 or No. 3) |
  • | +------------------------------------+ |
  • | Native Subgrade (Uncompacted!) |
  • +-------------------------------------------------------------------------+
  • Primary Permeable Pavement Types

Porous Asphalt: Standard asphalt cement combined with open-graded coarse aggregate without fine sand, creating 15% to 25% interconnected voids.

Pervious Concrete: Portland cement, coarse aggregate, water, and specialized admixtures without fine sand, creating 15% to 25% void space.

Permeable Interlocking Concrete Pavers (PICP): Solid, high-strength impervious concrete blocks manufactured with engineered spacer lugs that establish 1/4" to 3/8" wide joints filled with clean, open-graded aggregate (ASTM No. 8 or No. 89 stone).

The Open-Graded Aggregate Structural Profile

Bedding Layer: 1.5 to 2.0 inches of clean, crushed ASTM No. 8 stone (provides a smooth, level bedding surface for pavers).

Base Reservoir Layer: 4.0 inches of clean, crushed ASTM No. 57 stone (chokes the open voids of the subbase while providing structural stability).

Subbase Reservoir Layer: 6 to 24+ inches of clean, uncrushed, open-graded ASTM No. 2 or No. 3 aggregate (1.5" to 3" crushed stone). This layer provides a structural void ratio of 30% to 40% , functioning as an underground detention reservoir.

Subgrade Infiltration Regimes

Full Exfiltration (Unlined): Native subgrade possesses an infiltration rate > 0.5 in/hr (HSG A or B). All stored runoff infiltrates into the underlying aquifer. No underdrains are needed.

Partial Exfiltration: Subgrade infiltration rates range from 0.1 to 0.5 in/hr (HSG C). A perforated underdrain is installed raised 4 to 6 inches above the subgrade , forcing water stored below the pipe to infiltrate while draining excess volume to the municipal sewer.

No Exfiltration (Lined / Underdrained): Subgrade infiltration is < 0.1 in/hr (HSG D), or the installation is situated over contaminated brownfield soils, high water tables, or sensitive karst limestone prone to sinkholes . An impermeable ethylene propylene diene monomer (EPDM) geomembrane lines the excavation, and perforated underdrains collect 100% of filtered effluent.

  • 3. Green Roofs & Rainwater Harvesting Systems
  • Extensive vs. Intensive Green Roofs
  • Attribute Extensive Green Roof Intensive Green Roof
  • Engineered Media Depth 2 to 6 inches (50 to 150 mm) > 6 to 24+ inches (> 150 mm)
  • Structural Dead Load 15 to 30 lbs/sq ft (70 - 150 kg/m^2) 50 to 150+ lbs/sq ft (250 - 750+ kg/m^2)

Plant Palette Drought-hardy succulents ( Sedum spp.), chives, herbs Perennials, ornamental shrubs, lawns, small trees

  • Irrigation & Maintenance Minimal to none after establishment High; permanent automated irrigation required
  • Accessibility Inaccessible (except for maintenance) Fully accessible amenity rooftop parks and plazas
  • Stormwater Retention Retains 50% to 70% annual rainfall Retains 75% to 90% annual rainfall
  • Rainwater Harvesting & Cisterns

Rainwater harvesting intercepts rooftop runoff for non-potable reuse (such as landscape irrigation, decorative water features, and toilet flushing):

First-Flush Diverter: A mechanical bypass chamber that diverts the initial 0.02 to 0.05 inch of roof wash (carrying bird droppings, soot, airborne dust, and pollen) away from the storage reservoir.

Cistern Sizing: Sized by balancing cumulative monthly rainfall supply against projected landscape irrigation demand, accounting for dry-season deficits.

4. BMP Performance & Sizing Summary Matrix

Best Management Practice Maximum Drainage Area Maximum Inflow Slope Target Pollutant Removal Efficiency Primary Maintenance Obligation

Bioretention Cell <= 2.0 to 5.0 acres Surface slope <= 5% TSS: 85%, TP: 40-60%, TN: 30-50%, Metals: 90% Mulch raking/replacement, weed control, trash removal

Bioswale <= 5.0 acres Longitudinal slope <= 4% TSS: 70-80%, TP: 30-40%, TN: 25-35% Turf mowing, check dam sediment clearing, weeding

Vegetative Filter Strip 75 ft impervious length 1% to 5% (max 8%) TSS: 65-75%, TP: 25-35%, TN: 20-30% Turf mowing, level spreader cleaning, rill repair

Permeable Pavement <= 3:1 run-on ratio Surface slope <= 2% TSS: 85-95%, TP: 50-65%, TN: 40-60% Regenerative air vacuum sweeping (2x/year), joint aggregate refilling

Extensive Green Roof Rooftop footprint Pitch <= 2:12 (standard) Volume: 50-70%, TSS: 90% Annual weeding, drain clearing, inspection

5. Real-World Case Scenario: Designing an LID Campus Retrofit

Scenario: An urban university campus is retrofitting an existing 3.0-acre asphalt parking lot (I = 100%) into a high-performance landscape incorporating bioretention cells and permeable interlocking concrete pavers (PICP). Local municipal regulations require capturing and treating the Water Quality Volume (WQV) for a 1.0-inch storm (P = 1.0"). The site soils belong to Hydrologic Soil Group C (sandy clay loam with measured infiltration of 0.20 in/hr).

Design Resolution:

Calculate Water Quality Volume (WQV):

  • Site area: A = 3.0 acres, I = 100
  • Volumetric coefficient: Rv = 0.05 + (0.009 * 100) = 0.95

Compute volume:

WQV = [(1.0" * 0.95 * 3.0 ac) / 12] * 43,560 = 0.2375 * 43,560 = 10,345.5 cubic feet

Allocate Treatment between BMPs:

The landscape architect designs parking stalls (1.2 acres) using PICP with a 12-inch ASTM No. 2 stone reservoir subbase (40% void space). Because native soil is HSG C (0.20 in/hr), an underdrain is installed raised 4 inches above the subgrade (Partial Exfiltration).

Drive aisles and pathways (1.8 acres) sheet-drain into two central bioretention cells totaling 4,500 sq ft of surface filter bed.

Detail the Bioretention Cells:

Filter bed: 30 inches of engineered mix (85% concrete sand, 10% fines, 5% leaf compost).

Surface ponding: 9 inches, providing 4,500 * 0.75' = 3,375 cu ft of immediate surface storage.

Drain-down time check: 9" / 2.5 in/hr media infiltration = 3.6 hours <= 24 hours (compliant).

Choker layer: 3 inches of clean ASTM No. 8 pea gravel (no geotextile fabric).

Mulch: 3 inches of aged, double-shredded hardwood.

Underdrain: 6-inch slotted PVC pipe bedded in 10 inches of ASTM No. 57 aggregate, tied into the municipal storm sewer.

6. Exam Traps & Pitfalls

The Geotextile Fabric Filter Trap: Never specify geotextile filter fabric horizontally between bioretention engineered soil media and the stone reservoir. Fine particles blind the fabric, causing premature hydraulic failure. Always specify a choked stone layer of clean ASTM No. 8 pea gravel .

The Excess Organic Matter Trap: Never specify > 5% organic matter by weight in bioretention soil mixes. High organic compost content leaches dissolved nitrogen and phosphorus into groundwater and underdrains.

Exceeding 12-Inch Bioretention Ponding: Sizing bioretention ponding deeper than 12 inches drowns plant crowns, compacts the filter bed under excessive hydrostatic head, and risks mosquito breeding if drain-down exceeds 48 hours.

Unlined Permeable Pavements on Brownfields: Never specify full subgrade exfiltration over contaminated brownfield sites or active karst terrain. Stormwater will mobilize chemical contamination plumes into aquifers or trigger structural sinkholes. Use an impermeable geomembrane liner and perforated underdrain.

Light Mulch Selection: Never specify pine bark chips, wood chips, or light triple-shredded mulch in bioretention basins. These materials float during storm events, suffocating plants and clogging overflow weirs. Specify dense, interlocking double-shredded hardwood mulch .