2.4 Certification Levels and Scorecard
LEED AP Building Design + Construction BD+C
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Introduction & Exam Overview
1.1 Current Exam Facts 1.2 How to Use This Guide
2 Chapter 2: Integrative Process
2.1 Integrative Process Philosophy and Workflow 2.2 Integrative Process Credit (IP) 2.3 Prerequisites and Project Setup 2.4 Certification Levels and Scorecard
3 Chapter 3: Location & Transportation + Surroundings
3.1 LEED for Neighborhood Development Location 3.2 Sensitive Land Protection & High Priority Site 3.3 Surrounding Density and Diverse Uses 3.4 Access to Quality Transit 3.5 Bicycle Facilities, Reduced Parking, Green Vehicles 3.6 Building Surroundings and Joint Use
4 Chapter 4: Sustainable Sites (SS)
4.1 SS Prerequisite: Construction Activity Pollution Prevention 4.2 Site Assessment and Site Development 4.3 Open Space and Rainwater Management 4.4 Heat Island Reduction 4.5 Light Pollution Reduction
5 Chapter 5: Water Efficiency (WE)
5.1 WE Prerequisites 5.2 Outdoor and Indoor Water Use Reduction Credits 5.3 Cooling Tower Water Use, Process Water, and Metering 5.4 Non-Potable and Reclaimed Water Strategies
6 Chapter 6: Energy & Atmosphere (EA)
6.1 EA Prerequisites 6.2 Optimize Energy Performance 6.3 Enhanced Commissioning 6.4 Advanced Energy Metering and Grid Harmonization 6.5 Renewable Energy and Carbon Offsets 6.6 ASHRAE 90.1-2016 Fundamentals
7 Chapter 7: Materials & Resources (MR)
7.1 MR Prerequisites 7.2 Building Life-Cycle Impact Reduction (BLIR) 7.3 Building Product Disclosure and Optimization (BPDO) 7.4 Construction and Demolition Waste Management 7.5 PBT Source Reduction and Furniture Material
8 Chapter 8: Indoor Environmental Quality (EQ)
8.1 EQ Prerequisites 8.2 Enhanced IAQ Strategies and Low-Emitting Materials 8.3 Construction IAQ Management and Assessment 8.4 Thermal Comfort 8.5 Interior Lighting and Daylight 8.6 Quality Views and Acoustic Performance
9 Chapter 9: Innovation, Regional Priority & Project Types
9.1 Innovation Credits 9.2 Regional Priority Credits 9.3 BD+C Project Types and Scope 9.4 Project Registration, Documentation, and Certification Process 9.5 Last-Minute Exam Tips
2.4 Certification Levels and Scorecard
Key Takeaways Explain This Topic AI
LEED awards four certification levels — Certified (40-49 points), Silver (50-59), Gold (60-79), and Platinum (80+) — out of 110 total possible points
Energy & Atmosphere (EA) is the largest category at 33 points, more than three times the size of Sustainable Sites and roughly one-third of all available points
The base scorecard sums to 100 points; the remaining 10 points come from Innovation (6) and Regional Priority (4), which depend on context and ZIP code
Prerequisites are mandatory and award zero points — every BD+C project must satisfy every prerequisite in every category before any credit in that category counts
Prerequisites span Integrative Process, Location & Transportation, Sustainable Sites, Water Efficiency, Energy & Atmosphere, Materials & Resources, and Indoor Environmental Quality
Last updated: May 2026
The Four Certification Levels
LEED uses the same four certification levels across every rating system. Memorize these thresholds cold — they show up on nearly every LEED AP exam.
- Certification Level Points Required (out of 110)
- Certified 40-49
- Silver 50-59
- Gold 60-79
- Platinum 80+
A few rules the exam tests:
Points are cumulative across categories — a Gold project can come from many small wins or a few category sweeps
There is no minimum per category beyond the prerequisites — a project can earn zero Materials credits and still hit Platinum if it dominates Energy and Water
- Prerequisites award zero points but are required for any certification level
- The point thresholds are the same in BD+C, ID+C, O+M, ND, and Homes
- The 110-Point Scorecard (LEED v4.1 BD+C)
LEED v4.1 BD+C uses a 100-point base scorecard plus 10 bonus points from Innovation and Regional Priority.
- # Category Code Points Share
- 1 Integrative Process IP 1 1%
- 2 Location & Transportation LT 16 15%
- 3 Sustainable Sites SS 10 9%
- 4 Water Efficiency WE 11 10%
- 5 Energy & Atmosphere EA 33 30%
- 6 Materials & Resources MR 13 12%
- 7 Indoor Environmental Quality EQ 16 15%
- Base subtotal 100
- 8 Innovation IN 6 5%
- 9 Regional Priority RP 4 4%
- Total possible 110 100%
- Why the Distribution Matters
EA is dominant — at 33 points it is more than 3x larger than the next-largest category (LT and EQ at 16 each). The exam expects you to know EA is the biggest lever.
IP is symbolic — 1 point — but it disproportionately shapes performance in every other category
Innovation (IN) rewards strategies above credit thresholds, novel approaches not covered by existing credits, and pilot credits — and includes 1 point for having a LEED AP with a specialty matching the project rating system on the team
Regional Priority (RP) awards bonus points (up to 4) when a project achieves credits that USGBC has flagged as locally important based on the project's ZIP code
LEED v4.1 BD+C Points by Category
Prerequisites: The Mandatory Floor
Prerequisites are mandatory items that earn zero points but must all be satisfied to certify at any level. A project that hits 110 points on the scorecard but fails one prerequisite is not certified at all. The exam loves this point — expect a scenario question that ends with 'but the project did not meet the Minimum Energy Performance prerequisite' and the right answer to be 'no certification.'
The LEED v4.1 BD+C prerequisites are listed below. Memorize the category and the name of each — the exam asks both 'which is a prerequisite' and 'which category does this prerequisite belong to.'
- Integrative Process (IP)
- No prerequisites — the IP credit is voluntary but recommended
- Location & Transportation (LT)
- No standalone prerequisites — LT requirements are integrated into the rating system structure
- Sustainable Sites (SS)
SS Prerequisite: Construction Activity Pollution Prevention — Create and implement an Erosion and Sedimentation Control (ESC) plan that conforms to the 2017 U.S. EPA Construction General Permit (CGP) or local equivalent. Required for every BD+C project.
Water Efficiency (WE)
WE Prerequisite: Outdoor Water Use Reduction — Reduce outdoor water use by either (a) eliminating permanent irrigation after a 2-year establishment period or (b) reducing landscape water use by 30% from a calculated baseline.
WE Prerequisite: Indoor Water Use Reduction — Reduce indoor water use by 20% (relative to the LEED v4 baseline) using compliant plumbing fixtures and fittings.
WE Prerequisite: Building-Level Water Metering — Install permanent water meters that measure total potable water use for the building and grounds, with data reported monthly and annually to USGBC for 5 years.
Energy & Atmosphere (EA)
EA Prerequisite: Fundamental Commissioning and Verification — Engage a Commissioning Authority (CxA) by the end of design development to verify that energy, water, indoor environmental quality, and durability systems perform per the OPR and BOD.
EA Prerequisite: Minimum Energy Performance — Demonstrate at least a 5% improvement over the ASHRAE 90.1-2016 baseline for new construction (3% for major renovations) using whole-building energy simulation or prescriptive paths.
EA Prerequisite: Building-Level Energy Metering — Install permanent meters that measure total building energy use across all fuel sources, with data reported monthly and annually to USGBC for 5 years.
EA Prerequisite: Fundamental Refrigerant Management — Do not use chlorofluorocarbon (CFC)-based refrigerants in new HVAC&R systems.
Materials & Resources (MR)
MR Prerequisite: Storage and Collection of Recyclables — Provide dedicated areas for the collection and storage of recyclables (mixed paper, corrugated cardboard, glass, plastics, metals), and for two of: batteries, mercury-containing lamps, and electronic waste.
MR Prerequisite: Construction and Demolition Waste Management Planning — Develop and implement a written plan that identifies the materials targeted for diversion and the diversion strategy.
Indoor Environmental Quality (EQ)
EQ Prerequisite: Minimum Indoor Air Quality Performance — Meet ASHRAE 62.1-2016 minimum ventilation rates (or local equivalent for projects outside the U.S.).
EQ Prerequisite: Environmental Tobacco Smoke Control — Prohibit smoking inside the building and within 25 ft of operable windows, entries, and outdoor air intakes; or implement a compliant building-wide no-smoking policy with signage.
Prerequisite Memory Aid
A helpful pattern: in every major category, there is a prerequisite for performance (you must hit a floor) and one for measurement (you must be able to prove it).
- Category Performance Floor Measurement
- Water Efficiency Indoor 20% reduction + outdoor reduction Building-level water metering
- Energy & Atmosphere 5% better than ASHRAE 90.1 + no CFCs Building-level energy metering
Indoor Environmental Quality ASHRAE 62.1 ventilation + no smoking (no separate metering prerequisite, but EQ credits include monitoring)
Pursuing a Specific Certification Level
Project teams typically work backwards from a target level. A common Gold strategy in BD+C:
- All prerequisites satisfied (required regardless)
- ~25 points from EA (energy modeling, commissioning credits, renewables, refrigerants)
- ~10 points from LT (site selection, transit, parking)
- ~7 points from WE (above prerequisite reductions)
- ~8 points from EQ (low-emitting materials, daylight, views)
- ~5 points from MR (EPDs, sourcing, recycled content)
- ~4 points from SS (open space, heat island, rainwater)
- IP credit (1 point)
- Several IN and RP bonuses
That path lands roughly 60-65 points — comfortably into Gold with some buffer for review attrition.
Scorecard Pitfalls
Submittal attrition. Teams routinely lose 5-10 points during GBCI review when documentation falls short. Target a buffer above the level boundary.
Innovation (IN) overload. Only 5 credits in IN are available — you cannot stack endless innovations to overshoot a level.
Regional Priority (RP) is location-locked. RP credits are pre-selected by USGBC for each ZIP code; teams cannot pick their own RP credits.
Prerequisites do not count. A project that 'almost' has a prerequisite has nothing — partial credit does not exist for prerequisites.