Study guide
2.2 Integrative Process Credit (IP)
LEED AP Building Design + Construction BD+C
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Introduction & Exam Overview
1.1 Current Exam Facts 1.2 How to Use This Guide
2 Chapter 2: Integrative Process
2.1 Integrative Process Philosophy and Workflow 2.2 Integrative Process Credit (IP) 2.3 Prerequisites and Project Setup 2.4 Certification Levels and Scorecard
3 Chapter 3: Location & Transportation + Surroundings
3.1 LEED for Neighborhood Development Location 3.2 Sensitive Land Protection & High Priority Site 3.3 Surrounding Density and Diverse Uses 3.4 Access to Quality Transit 3.5 Bicycle Facilities, Reduced Parking, Green Vehicles 3.6 Building Surroundings and Joint Use
4 Chapter 4: Sustainable Sites (SS)
4.1 SS Prerequisite: Construction Activity Pollution Prevention 4.2 Site Assessment and Site Development 4.3 Open Space and Rainwater Management 4.4 Heat Island Reduction 4.5 Light Pollution Reduction
5 Chapter 5: Water Efficiency (WE)
5.1 WE Prerequisites 5.2 Outdoor and Indoor Water Use Reduction Credits 5.3 Cooling Tower Water Use, Process Water, and Metering 5.4 Non-Potable and Reclaimed Water Strategies
6 Chapter 6: Energy & Atmosphere (EA)
6.1 EA Prerequisites 6.2 Optimize Energy Performance 6.3 Enhanced Commissioning 6.4 Advanced Energy Metering and Grid Harmonization 6.5 Renewable Energy and Carbon Offsets 6.6 ASHRAE 90.1-2016 Fundamentals
7 Chapter 7: Materials & Resources (MR)
7.1 MR Prerequisites 7.2 Building Life-Cycle Impact Reduction (BLIR) 7.3 Building Product Disclosure and Optimization (BPDO) 7.4 Construction and Demolition Waste Management 7.5 PBT Source Reduction and Furniture Material
8 Chapter 8: Indoor Environmental Quality (EQ)
8.1 EQ Prerequisites 8.2 Enhanced IAQ Strategies and Low-Emitting Materials 8.3 Construction IAQ Management and Assessment 8.4 Thermal Comfort 8.5 Interior Lighting and Daylight 8.6 Quality Views and Acoustic Performance
9 Chapter 9: Innovation, Regional Priority & Project Types
9.1 Innovation Credits 9.2 Regional Priority Credits 9.3 BD+C Project Types and Scope 9.4 Project Registration, Documentation, and Certification Process 9.5 Last-Minute Exam Tips
2.2 Integrative Process Credit (IP)
Key Takeaways Explain This Topic AI
The Integrative Process credit is worth 1 point in LEED v4.1 BD+C and requires both a Discovery phase and an Implementation phase
Discovery requires a preliminary 'simple box' energy modeling analysis and a preliminary water budget analysis completed before schematic design ends
Discovery analysis must cover site conditions, massing and orientation, basic envelope attributes, lighting levels, thermal comfort ranges, plug and process loads, programmatic uses, and water demand
Implementation requires documenting at least one strategy from each analysis (energy and water) that influenced building and site design decisions
The IP credit is process-based — it is earned by completing and documenting the right analyses at the right time, not by hitting a numeric performance threshold
Last updated: May 2026
The IP Credit at a Glance
The Integrative Process (IP) credit is the only credit in the IP category and is worth 1 point in LEED v4.1 BD+C. It is the only credit in LEED that is explicitly about process — every other credit measures an outcome. Because of that, the exam loves to test what the IP credit requires , what it does not require, and when each activity must happen.
Quick Answer: Earn 1 point by completing a Discovery phase that includes a preliminary 'simple box' energy model and a preliminary water budget analysis before the end of schematic design , and by documenting at least one design or site decision influenced by each analysis during Implementation.
Credit Intent
The stated intent is to support high-performance, cost-effective project outcomes through an early analysis of the interrelationships among systems. Read that carefully: the credit is about interrelationships , not about energy or water in isolation. It is the only credit that rewards the team for studying how decisions in one system affect another.
The Two Required Phases
Phase Required Analyses When
Discovery Preliminary simple-box energy modeling + preliminary water budget analysis Before the end of schematic design
Implementation Document at least one strategy from each analysis that influenced building and site design Continues through design development and into construction documents
Discovery: Energy Analysis
The Discovery energy analysis must be a 'simple box' (or 'shoebox') energy model — an early-stage massing-level model used to test how design decisions affect energy. This is not a code-compliance or ASHRAE 90.1 Appendix G model; that level of detail comes later under the EA Optimize Energy Performance credit.
The Discovery energy analysis must, at minimum, study how the following affect energy use:
- Site conditions — solar exposure, prevailing winds, shading from adjacent buildings, microclimate
- Massing and orientation — building shape, aspect ratio, axis orientation
- Basic envelope attributes — wall and roof insulation levels, window-to-wall ratio, glazing performance
- Lighting levels — interior lighting power density and daylighting potential
- Thermal comfort ranges — heating and cooling setpoints, humidity targets
- Plug and process load needs — equipment loads driven by program
- Programmatic and operational parameters — occupancy schedules and use types affecting load patterns
- Discovery: Water Analysis
The Discovery water analysis is a preliminary water budget . It must evaluate, at minimum:
- Indoor water demand — fixtures, appliances, kitchen, laundry
- Outdoor water demand — irrigation, including landscape type and area
- Process water demand — cooling towers, humidification, on-site processes
Alternative non-potable supply — rainwater, stormwater, on-site greywater, condensate, municipal reclaimed water
The goal of the water budget is to surface opportunities to reduce demand and to substitute non-potable supply before fixture selection and landscape design are locked in.
Implementation: Documenting Influence
Discovery alone does not earn the point. Implementation requires the team to document at least one strategy from each analysis (energy and water) that actually influenced building form, envelope, systems, or site design.
Good documentation describes what changed because of the analysis. For example:
Energy: 'The simple-box model showed that rotating the long axis 22 degrees reduced cooling loads by 14%. The team adopted this orientation, which also enabled a smaller chiller and eliminated one rooftop unit.'
Water: 'The water budget showed that 38% of total demand was outdoor irrigation. The team replaced 60% of turf with native plantings, eliminating the need for a permanent irrigation system and reducing outdoor potable water by 100%.'
What the Credit Does NOT Require
A common exam trap. The IP credit does not require:
- A final ASHRAE 90.1 Appendix G energy model (that is for EA Optimize Energy Performance)
- A specific percentage of energy or water reduction
- Hiring a LEED AP
- Achieving any other LEED credit
- A net-zero, all-electric, or fossil-fuel-free outcome
- Use of any specific software
- Timing Is the Test
If a question describes a team running its first energy model during construction documents , or analyzing water demand after fixture selection , the IP credit is at risk. The analyses must be early enough to influence design — operationally, that means before the end of schematic design. Late analyses can earn EA and WE points but cannot earn the IP credit.
Loading diagram... Integrative Process Credit Workflow
Common Strategy Pairings
Because the IP credit is about interrelationships , the strongest documentation pairs an energy strategy with a water strategy that share a root cause. A few classic pairings:
Root Discovery Insight Energy Strategy Water Strategy
High solar exposure on south facade External shading + daylighting reduces lighting and cooling loads Rainwater capture from large south roof feeds irrigation
Hot, dry climate with high cooling loads Cool roof + thermal mass moderates cooling demand Cooling tower switched to air-cooled or hybrid; condensate recovered
Large turf landscape Daylighting and shading reduce lighting load Native plantings eliminate permanent irrigation
High-occupancy program (school, lab) Demand-controlled ventilation reduces fan energy Low-flow fixtures + non-potable supply for flushing
The exam often presents a scenario and asks which analysis or which strategy best demonstrates IP thinking. Look for the option that explicitly couples two systems.