5.3 Cooling Tower Water Use, Process Water, and Metering

LEED AP Building Design + Construction BD+C

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Introduction & Exam Overview

1.1 Current Exam Facts 1.2 How to Use This Guide

2 Chapter 2: Integrative Process

2.1 Integrative Process Philosophy and Workflow 2.2 Integrative Process Credit (IP) 2.3 Prerequisites and Project Setup 2.4 Certification Levels and Scorecard

3 Chapter 3: Location & Transportation + Surroundings

3.1 LEED for Neighborhood Development Location 3.2 Sensitive Land Protection & High Priority Site 3.3 Surrounding Density and Diverse Uses 3.4 Access to Quality Transit 3.5 Bicycle Facilities, Reduced Parking, Green Vehicles 3.6 Building Surroundings and Joint Use

4 Chapter 4: Sustainable Sites (SS)

4.1 SS Prerequisite: Construction Activity Pollution Prevention 4.2 Site Assessment and Site Development 4.3 Open Space and Rainwater Management 4.4 Heat Island Reduction 4.5 Light Pollution Reduction

5 Chapter 5: Water Efficiency (WE)

5.1 WE Prerequisites 5.2 Outdoor and Indoor Water Use Reduction Credits 5.3 Cooling Tower Water Use, Process Water, and Metering 5.4 Non-Potable and Reclaimed Water Strategies

6 Chapter 6: Energy & Atmosphere (EA)

6.1 EA Prerequisites 6.2 Optimize Energy Performance 6.3 Enhanced Commissioning 6.4 Advanced Energy Metering and Grid Harmonization 6.5 Renewable Energy and Carbon Offsets 6.6 ASHRAE 90.1-2016 Fundamentals

7 Chapter 7: Materials & Resources (MR)

7.1 MR Prerequisites 7.2 Building Life-Cycle Impact Reduction (BLIR) 7.3 Building Product Disclosure and Optimization (BPDO) 7.4 Construction and Demolition Waste Management 7.5 PBT Source Reduction and Furniture Material

8 Chapter 8: Indoor Environmental Quality (EQ)

8.1 EQ Prerequisites 8.2 Enhanced IAQ Strategies and Low-Emitting Materials 8.3 Construction IAQ Management and Assessment 8.4 Thermal Comfort 8.5 Interior Lighting and Daylight 8.6 Quality Views and Acoustic Performance

9 Chapter 9: Innovation, Regional Priority & Project Types

9.1 Innovation Credits 9.2 Regional Priority Credits 9.3 BD+C Project Types and Scope 9.4 Project Registration, Documentation, and Certification Process 9.5 Last-Minute Exam Tips

5.3 Cooling Tower Water Use, Process Water, and Metering

Key Takeaways Explain This Topic AI

WE Credit: Cooling Tower Water Use earns 1 point for maximizing cycles of concentration without exceeding maximum allowable concentrations of calcium, alkalinity, silica, and chloride in makeup water, and 2 points when at least 20% of makeup water is non-potable.

Cycles of concentration are calculated by dividing the maximum allowable concentration of each limiting constituent by its concentration in the makeup water; the lowest resulting cycle count governs.

Conductivity controllers and overflow alarms are required to prevent blowdown waste and to maintain target cycles automatically.

WE Credit: Water Metering awards 1 point for sub-metering at least two of: irrigation, indoor plumbing fixtures, domestic hot water, boilers with >100,000 gal projected annual makeup, reclaimed water, and other process water.

Sub-meters must record data at least monthly, be permanent, and be configured to report to a building automation system (BAS), utility platform, or LEED reporting tool — meters that only require manual reads do not satisfy the credit.

Last updated: May 2026

Why Cooling Towers Matter

A cooling tower rejects heat from a building's chilled-water loop by evaporating a portion of the recirculating water. As pure water evaporates, dissolved solids (calcium, magnesium, silica, chloride, sulfate) concentrate in the remaining water. If the project lets concentration climb too high, scale and corrosion damage equipment. To prevent that, the system bleeds (blows down) concentrated water to the drain and replaces it with fresh makeup water .

The ratio of dissolved solids in the blowdown to dissolved solids in the makeup is the cycles of concentration (CoC) — also called concentration ratio . Higher CoC = less blowdown = less makeup water = less waste. But push too high and you damage the tower.

  • WE Credit: Cooling Tower Water Use (1-2 Points)
  • Step 1 — Test the Makeup Water

The project team analyzes the potable makeup water for at least the following constituents:

  • Constituent Typical Maximum in Recirculating Water
  • Calcium (as CaCO3) 1,000 ppm
  • Total alkalinity (as CaCO3) 1,000 ppm
  • Silica (as SiO2) 100 ppm
  • Chloride (Cl-) 250 ppm
  • Conductivity varies by manufacturer

(Maximums reflect LEED reference-guide thresholds for the credit; actual limits depend on tower materials and chemical treatment.)

Step 2 — Calculate Maximum Cycles

For each constituent:

Maximum cycles = maximum allowable concentration in recirculating water ÷ concentration in makeup water

The smallest result across all four constituents is the maximum cycles of concentration the tower can safely run.

Worked Example

Makeup water analysis:

  • Calcium: 80 ppm → 1,000 ÷ 80 = 12.5 cycles
  • Alkalinity: 200 ppm → 1,000 ÷ 200 = 5.0 cycles
  • Silica: 20 ppm → 100 ÷ 20 = 5.0 cycles
  • Chloride: 25 ppm → 250 ÷ 25 = 10.0 cycles

Limiting constituents are alkalinity and silica — maximum cycles = 5 .

Step 3 — Earn the Points

Option Points

Maximize cycles of concentration without exceeding any maximum constituent value (and use conductivity controllers and overflow alarms ) 1

Achieve at least 20% non-potable makeup water (rainwater, graywater, reclaimed, condensate, etc.) in addition to maximizing cycles 2

Required controls for either point:

Conductivity controller that automatically opens the blowdown valve when conductivity (a stand-in for dissolved-solids concentration) exceeds the setpoint and closes it when conductivity drops below.

Overflow alarm on the tower sump to flag stuck float valves and prevent runaway makeup demand.

Makeup and blowdown meters to verify performance.

Where Process Water Fits

Beyond cooling towers, LEED also recognizes other process loads:

Boilers — closed-loop, low makeup but periodic blowdown.

Steam systems — high makeup if condensate is not returned; condensate recovery cuts makeup dramatically.

Commercial kitchen equipment — combination ovens, food steamers (boilerless preferred), pre-rinse spray valves (must be ≤1.28 gpm under federal law).

Laundry equipment — Water Factor ≤4.0 gal/cu ft for commercial washers.

Medical and lab equipment — sterilizers, autoclaves, vacuum systems (water-ring vs. dry).

Process water generally does not count toward the Indoor Water Use Reduction credit's fixture math, but it does count toward the Cooling Tower credit (for towers) and the Water Metering credit (for sub-metering).

  • WE Credit: Water Metering (1 Point)
  • What to Meter

The credit asks the project to install permanent water meters for at least two of the following subsystems that are present in the building, in addition to the building-level meter required by the prerequisite :

Irrigation — separate meter for landscape irrigation systems serving >10% of landscaped area.

Indoor plumbing fixtures and fittings — aggregate meter for all interior plumbing fixtures.

Domestic hot water — meter for water entering the domestic hot-water system (boiler or heater).

Boilers — sub-meter on boilers with aggregate projected annual makeup water >100,000 gallons .

Reclaimed water — meter on reclaimed water serving the project, regardless of source.

Other process water — for example, humidification, laundry, pools.

How Meters Must Work

Permanent (not portable clamp-ons).

Record data at least monthly and calculate annual totals .

Data must connect to a building automation system (BAS) , web-based utility platform, or LEED reporting tool — not just a manual analog dial requiring on-site reads.

Meters can be on either side of a backflow preventer; LEED does not specify location.

Putting It Together

Loading diagram...

Sub-metering any two of the six subsystems satisfies the credit. Most projects pick irrigation and indoor fixtures because the data is most actionable for operations.