Study guide
5.2 Outdoor and Indoor Water Use Reduction Credits
LEED AP Building Design + Construction BD+C
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Introduction & Exam Overview
1.1 Current Exam Facts 1.2 How to Use This Guide
2 Chapter 2: Integrative Process
2.1 Integrative Process Philosophy and Workflow 2.2 Integrative Process Credit (IP) 2.3 Prerequisites and Project Setup 2.4 Certification Levels and Scorecard
3 Chapter 3: Location & Transportation + Surroundings
3.1 LEED for Neighborhood Development Location 3.2 Sensitive Land Protection & High Priority Site 3.3 Surrounding Density and Diverse Uses 3.4 Access to Quality Transit 3.5 Bicycle Facilities, Reduced Parking, Green Vehicles 3.6 Building Surroundings and Joint Use
4 Chapter 4: Sustainable Sites (SS)
4.1 SS Prerequisite: Construction Activity Pollution Prevention 4.2 Site Assessment and Site Development 4.3 Open Space and Rainwater Management 4.4 Heat Island Reduction 4.5 Light Pollution Reduction
5 Chapter 5: Water Efficiency (WE)
5.1 WE Prerequisites 5.2 Outdoor and Indoor Water Use Reduction Credits 5.3 Cooling Tower Water Use, Process Water, and Metering 5.4 Non-Potable and Reclaimed Water Strategies
6 Chapter 6: Energy & Atmosphere (EA)
6.1 EA Prerequisites 6.2 Optimize Energy Performance 6.3 Enhanced Commissioning 6.4 Advanced Energy Metering and Grid Harmonization 6.5 Renewable Energy and Carbon Offsets 6.6 ASHRAE 90.1-2016 Fundamentals
7 Chapter 7: Materials & Resources (MR)
7.1 MR Prerequisites 7.2 Building Life-Cycle Impact Reduction (BLIR) 7.3 Building Product Disclosure and Optimization (BPDO) 7.4 Construction and Demolition Waste Management 7.5 PBT Source Reduction and Furniture Material
8 Chapter 8: Indoor Environmental Quality (EQ)
8.1 EQ Prerequisites 8.2 Enhanced IAQ Strategies and Low-Emitting Materials 8.3 Construction IAQ Management and Assessment 8.4 Thermal Comfort 8.5 Interior Lighting and Daylight 8.6 Quality Views and Acoustic Performance
9 Chapter 9: Innovation, Regional Priority & Project Types
9.1 Innovation Credits 9.2 Regional Priority Credits 9.3 BD+C Project Types and Scope 9.4 Project Registration, Documentation, and Certification Process 9.5 Last-Minute Exam Tips
5.2 Outdoor and Indoor Water Use Reduction Credits
Key Takeaways Explain This Topic AI
WE Credit: Outdoor Water Use Reduction earns 1 point for a 50% reduction from the calculated baseline and 2 points for a 100% reduction (no potable water used for irrigation).
WE Credit: Indoor Water Use Reduction earns 1-6 points on a sliding scale starting at 25% reduction (1 point) and reaching 50% reduction (6 points) below the EPAct 1992 baseline.
Indoor water calculations multiply each fixture's design flow rate by usage frequency (duration × daily uses) and FTE plus visitor occupancy, then sum across fixture groups for both baseline and design cases.
Process water for Energy Star-rated dishwashers, clothes washers, ice machines, and food steamers can contribute to additional indoor reductions but is calculated separately from fixture water.
WaterSense-labeled fixtures, dual-flush valves, waterless or pint urinals, and metered or sensor faucets are the highest-leverage indoor strategies for moving from the 20% prerequisite to the 6-point credit.
Last updated: May 2026
From Prerequisite to Credit: Going Beyond the Floor
The two reduction credits reward projects that go beyond the 20%/30% prerequisite thresholds. Together they account for 8 of the 11 WE points in LEED v4 BD+C — the largest single concentration of points in the category.
WE Credit: Outdoor Water Use Reduction (1-2 Points)
This credit uses the same EPA WaterSense Water Budget Tool methodology as the prerequisite, but raises the bar.
- Reduction from baseline LWR Points
- 50% 1
- 100% (no potable water used for irrigation) 2
The baseline landscape water requirement (LWR) is calculated using local evapotranspiration and the project's actual plant palette. Beyond-prerequisite strategies stack:
Replace remaining turf with native and adapted ground cover .
Use drip or subsurface drip irrigation (efficiency ≥0.85) rather than spray (~0.625).
Add rain sensors, soil moisture sensors, or weather-based smart controllers (must be WaterSense-labeled controller to claim the higher efficiency assumption).
Use captured rainwater, graywater, municipal reclaimed water, or HVAC condensate for irrigation. Any of these non-potable sources reduce potable water demand to zero and earn the 2-point threshold.
WE Credit: Indoor Water Use Reduction (1-6 Points)
- Reduction from EPAct 1992 baseline Points
- 25% 1
- 30% 2
- 35% 3
- 40% 4
- 45% 5
- 50% 6
The sliding scale rewards each additional 5% step.
The Calculation Methodology
For each fixture group:
Daily fixture water use = flow rate × duration × daily uses per occupant × number of occupants
For flush fixtures (water closets, urinals), "flow rate × duration" collapses to gallons per flush (gpf) . For flow fixtures (faucets, showers), it's gpm × seconds ÷ 60 .
LEED uses full-time equivalent (FTE) occupants plus transient visitors . Default usage assumptions from the reference guide (per occupant per day):
- Fixture Female FTE Male FTE Visitor
- Water closet 3 uses 1 use 0.5 use
- Urinal 0 2 uses 0.1 use
- Lavatory faucet 3 uses × 15 sec 3 uses × 15 sec 0.5 use × 15 sec
- Shower 0.1 use × 480 sec 0.1 use × 480 sec 0
- Kitchen sink 1 use × 15 sec 1 use × 15 sec 0
A worked baseline example for 100 FTE occupants (50 female, 50 male) and 20 daily visitors :
- Baseline water closets: (50 × 3 + 50 × 1 + 20 × 0.5) × 1.6 gpf = 336 gal/day
- Design with 1.28 gpf WaterSense closets: same uses × 1.28 = 268.8 gal/day
- Closet reduction = (336 − 268.8) ÷ 336 = 20%
That closet-only swap only matches the prerequisite. To reach 30-50%, the team typically combines:
- Dual-flush water closets (0.8 gpf reduced flush / 1.28 gpf full)
- Pint urinals (0.125 gpf) or waterless urinals (0 gpf)
- 0.5 gpm public lavatory faucets (already baseline) plus sensor or metering valves
- 1.5 gpm WaterSense showerheads
- 1.5 gpm kitchen faucet aerators
- Process Water Contribution
Separate from fixture water, process water for appliances can support additional indoor savings:
- Appliance Energy Star / target
- Residential dishwasher ≤3.5 gal/cycle
- Commercial dishwasher varies by type (door-type ≤0.95 gal/rack)
- Residential clothes washer Water Factor (WF) ≤4.3
- Commercial clothes washer WF ≤4.0
- Ice machine Air-cooled, ≤25 gal per 100 lb ice
- Food steamer Connectionless or boilerless
Process water from these appliances is calculated against an Energy Star or LEED-specified baseline and folded into the indoor reduction total when applicable.
- Strategy Stack to Reach 50% Prerequisite (20%)
- + WaterSense lavatories and showers (~3-5%)
- + Dual-flush water closets (~5-7%)
- + Pint or waterless urinals (~5-8%)
- + Sensor/metering valves on public faucets (~2-3%)
- + Energy Star process equipment (~2-4%)
- = 35-47% (4-5 points)
Projects targeting all 6 points (50%) typically combine the above with non-potable flushing water (graywater or rainwater) — covered in Section 5.4.