Study guide

7.3 Wind, Storms, Lightning, Ice & Cold: Weather Limits for Crane Work

Massachusetts Crane Operator Hoisting Engineer License

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Massachusetts Hoisting Law (MGL Chapter 146)

1.1 MGL Chapter 146 §§ 53–54A: The Hoisting License Mandate, Exemptions & Penalties 1.2 MGL Chapter 146 §§ 57–67: Applications, Examinations, Appeals, License Term & Renewal

2 Chapter 2: Licensing Under 230 CMR 6.00

2.1 License Classes & Restrictions Under 230 CMR 6.10 2.2 Applying, Medical Qualification, the OPSI Exam & Renewal (230 CMR 6.02) 2.3 Temporary Permits, Continuing Education, Apprentices & Company Exemptions (230 CMR 6.03–6.07)

3 Chapter 3: 230 CMR 6.00 Definitions, Operating Rules & Enforcement

3.1 230 CMR 6.01: Scope, Key Definitions, Exempt Equipment & Adopted Standards 3.2 Operating Procedures Under 230 CMR 6.08: Inspections, Attention, Signals & Stop Authority 3.3 Special Requirements Under 230 CMR 6.09: Cranes, Derricks, Pile Drivers, Forklifts & Excavators 3.4 Incident Reporting, Investigations, Discipline & Variances (230 CMR 6.11–6.13)

4 Chapter 4: Crane Types, Working Parts & Load Charts

4.1 Crane Types & Working Parts by Restriction: Lattice, Derrick, Tower, Telescopic & Hydraulic Machines 4.2 Load Chart Fundamentals: Structural Strength vs. Stability Limits 4.3 Capacity Deductions & Calculating Net Allowable Capacity 4.4 Quadrants of Operation, Working Radius & Boom Angle Dynamics

5 Chapter 5: Advanced Lift Calculations & Multi-Crane Operations

5.1 Boom Deflection, Ground Leveling & Side-Loading Hazards 5.2 Wire Rope Reeving, Parts of Line & Single-Line Pull Limits 5.3 Center of Gravity, Weight Distribution & Multi-Crane (Tandem) Lifts

6 Chapter 6: Dig Safe, Underground Utilities & Trench Safety

6.1 Massachusetts Dig Safe Law (MGL c. 82 §§ 40–40E, 220 CMR 99.00): Premarking & Notice 6.2 Utility Color Codes, the 18-Inch Safety Zone, Excavating Near Facilities & Damage Response 6.3 Trench Safety Law, Excavation Hazards, Setbacks & Utility-Strike Emergencies

7 Chapter 7: Power Lines, Ground Conditions & Weather

7.1 Power Line Safety: OSHA 1926.1408–1411, Table A & Table T 7.2 Ground Bearing Pressure, Outrigger Setup & Cribbing Sizing 7.3 Wind, Storms, Lightning, Ice & Cold: Weather Limits for Crane Work

8 Chapter 8: Rigging Principles, Slings & Hardware

8.1 Sling Types: Synthetic, Wire Rope, and Alloy Steel Chain Slings 8.2 Sling Angle Calculations & Tension Formulas 8.3 Rigging Hardware, Shackles, Hooks & Below-the-Hook Lifting Devices

9 Chapter 9: Wire Rope & Crane Inspection

9.1 Wire Rope Construction, Damage Assessment & Removal Criteria (OSHA 1926.1413) 9.2 Crane Inspections, Safety Devices & Operational Aids (230 CMR 6.08; OSHA 1926.1412, 1415, 1416)

10 Chapter 10: Hand Signals & Personnel Hoisting

10.1 Standard Hand Signals, Voice & Radio Signals and Signal Person Qualification 10.2 Crane-Suspended Personnel Platforms (230 CMR 6.09(6) & OSHA 29 CFR 1926.1431)

7.3 Wind, Storms, Lightning, Ice & Cold: Weather Limits for Crane Work

Key Takeaways Explain This Topic AI

Wind speed must not exceed the manufacturer's recommendations for continued work (230 CMR 6.09(1)(k)).

When a local storm warning is issued, a competent person must decide whether to implement the manufacturer's recommendations for securing the equipment (OSHA 29 CFR 1926.1417(h)).

A competent person must adjust the equipment or operations for the effect of wind, ice and snow on stability and rated capacity (OSHA 29 CFR 1926.1417(n)).

Wind pressure rises with the square of wind speed (P = 0.00256 × V² × Cd in psf and mph), so doubling the wind speed quadruples the force on the boom and load.

For personnel hoisting, wind above 20 mph at the platform requires a qualified person to decide whether the lift is safe (OSHA 29 CFR 1926.1431), and dangerous weather stops personnel hoisting (230 CMR 6.09(6)(h)).

Last updated: October 2026

The rules that apply

  • Rule Requirement
  • 230 CMR 6.09(1)(k) Wind speed must not exceed the manufacturer's recommendations for continued work operations

230 CMR 6.08(2)(c)11 When there is any doubt about safety, the operator may stop and refuse to handle loads until safety is assured

OSHA 1926.1417(h) When a local storm warning is issued, the competent person decides whether to implement the manufacturer's recommendations for securing the equipment

OSHA 1926.1417(n) The competent person adjusts the equipment and/or operations for the effect of wind, ice and snow on stability and rated capacity

OSHA 1926.1431(k)(8) Personnel hoisting: if wind (sustained or gusts) exceeds 20 mph at the platform , a qualified person decides whether it is safe. Any sign of dangerous weather requires the same determination

  • 230 CMR 6.09(6)(h) Operators stop all personnel hoisting when there are indications of dangerous weather
  • OSHA 1926.1435 Tower cranes need a wind speed indicator mounted above the upper rotating structure

The manufacturer's manual is where the actual numbers come from: maximum operating wind speed for each configuration, the reference height for measuring it, out-of-service wind limits, cold-temperature limits and any capacity reductions.

Wind force: the square law

Dynamic wind pressure on a surface is commonly estimated as: P = 0.00256 × V 2 × C d P = 0.00256 \times V^2 \times C_d P = 0.00256 × V 2 × C d ​

where P P P is pressure in pounds per square foot, V V V is wind speed in miles per hour and C d C_d C d ​ is the drag (shape) coefficient: about 1.2–2.0 for flat panels and forms, and lower for round shapes. The total lateral force is the pressure times the projected area: F wind = P × A sail F_{\text{wind}} = P \times A_{\text{sail}} F wind ​ = P × A sail ​

Doubling the wind quadruples the force. With C d = 1.2 C_d = 1.2 C d ​ = 1.2 :

At 15 mph: P = 0.00256 × 15 2 × 1.2 ≈ 0.69 P = 0.00256 \times 15^2 \times 1.2 \approx 0.69 P = 0.00256 × 1 5 2 × 1.2 ≈ 0.69 psf

At 30 mph: P = 0.00256 × 30 2 × 1.2 ≈ 2.76 P = 0.00256 \times 30^2 \times 1.2 \approx 2.76 P = 0.00256 × 3 0 2 × 1.2 ≈ 2.76 psf

Worked example. A 10 ft × 40 ft precast wall panel (400 ft²) is flown broadside in a 25 mph gust with C d = 1.5 C_d = 1.5 C d ​ = 1.5 : P = 0.00256 × 25 2 × 1.5 = 2.40 psf , F = 2.40 × 400 = 960 lb P = 0.00256 \times 25^2 \times 1.5 = 2.40 \text{ psf}, \qquad F = 2.40 \times 400 = 960 \text{ lb} P = 0.00256 × 2 5 2 × 1.5 = 2.40 psf , F = 2.40 × 400 = 960 lb

That is nearly half a ton of sideways force, applied at the hook and transferred to the boom as side load. Taglines cannot reliably hold it.

Wind speed also generally increases with height , so the wind at a long boom tip can be much stronger than a ground reading. That is why manufacturers specify where wind speed is measured, and why tower cranes carry a wind speed indicator at the top.

Sail area and the manufacturer's wind limit

A crane's published wind limit assumes a standard load , a compact object with a limited wind-exposed area per unit of weight. Many crane manuals state the assumed load wind area per ton (1.2 m² per metric ton is a common figure). Large, light loads such as wall panels, curtain-wall units, plywood bundles, empty containers and HVAC units present far more area per ton. Most manuals then require a lower permissible wind speed , often calculated as: V permissible = V chart × A standard A actual V_{\text{permissible}} = V_{\text{chart}} \times \sqrt{\frac{A_{\text{standard}}}{A_{\text{actual}}}} V permissible ​ = V chart ​ × A actual ​ A standard ​ ​ ​

where A standard A_{\text{standard}} A standard ​ is the standard area allowed for that load's weight and A actual A_{\text{actual}} A actual ​ is the load's real projected area (including the drag factor if the manual says so). Example: the chart allows 30 mph for the configuration; the load's actual area is 4 times the standard area, so V permissible = 30 × 1 / 4 = 15 V_{\text{permissible}} = 30 \times \sqrt{1/4} = 15 V permissible ​ = 30 × 1/4 ​ = 15 mph. Follow the formula and definitions in your own manual. They vary by manufacturer.

High-sail loads cause three problems:

Side load on the boom tip that the boom is not built to resist (Section 5.1).

Radius growth when the load is blown away from the crane, reducing capacity.

Loss of tagline control and danger to the people holding the taglines.

Recognizing wind speed

The manufacturer's limits govern. This Beaufort-based guide only helps with judging wind:

  • Beaufort force Wind (mph) What you see Typical response
  • 0–3 0–12 Smoke rises nearly vertically to light flags extended Normal operations within chart limits

4 13–18 Dust and loose paper raised; small branches move Watch large-area loads; check assembly/disassembly wind limits

5 19–24 Small trees in leaf sway Expect high-sail loads to be beyond many manual limits; check the anemometer

6 25–31 Large branches move; wires whistle Near or above many operating limits; land loads and secure if the limit is reached

7 32–38 Whole trees move; walking is difficult Beyond most operating limits; secure per manual (lower boom or weathervane)

  • 8+ 39+ Twigs break off Storm conditions; follow out-of-service procedures
  • Storms and securing the crane

Storm warning (OSHA 1926.1417(h)): a competent person decides whether to carry out the manufacturer's securing procedure. Typical steps for mobile cranes include landing the load, retracting and lowering the boom, or parking it at the manufacturer's recommended angle, and setting swing and drum brakes and locks.

Tower cranes: manufacturers normally require the slewing brake to be released when out of service , so the jib can weathervane with the wind. Never lock a tower crane against the wind unless the manual allows it.

Lightning: neither 230 CMR nor OSHA Subpart CC sets a lightning distance, but a crane boom is a tall conductor. Most contractors adopt a lightning policy, for example stopping lifts and moving people to shelter when thunder is heard or lightning is seen, and waiting 30 minutes after the last thunder before resuming. Lower the load and boom first if it can be done safely. Never shelter under the boom or next to outrigger pads.

Ice, snow and cold

Ice and snow add weight. Ice on a lattice boom or snow on telescopic sections adds uncalculated dead weight at a long lever arm and can jam limit switches, A2B weights and sheaves. OSHA 1926.1417(n) makes the competent person responsible for adjusting operations for these effects. Clear the boom, or reduce loads as the manufacturer directs.

Cold affects hydraulics and steel. Cold, thick hydraulic oil makes controls sluggish and can delay brake release. Warm up the hydraulics per the manual before working. Structural steels lose toughness at low temperature, so avoid shock loading . Crane manufacturers publish minimum operating temperatures and any cold-weather capacity reductions for their machines, and those figures govern.

Slings and rope: synthetic web slings have temperature limits (Section 8.1), and frozen, wet fiber slings need the manufacturer's guidance.

Loading diagram... Weather decision path