Study guide
2.3 BOM Calculations, Cost Group Types, Flushing Principles, and Scrap Handling
Microsoft Dynamics 365 Supply Chain Management Functional Consultant MB-330
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Product Master and Released Products
1.1 Product Masters, Variants, and Configuration Technologies 1.2 Product Templates, Category Hierarchies, and Product Lifecycle States 1.3 Product Attributes, Attribute Types, and Attribute Groups
2 Chapter 2: Bills of Materials (BOM) and Formulas
2.1 BOM Lines, Line Types, and Component Configurations 2.2 BOM Versions, Activation, Approvals, and Circularity Checks 2.3 BOM Calculations, Cost Group Types, Flushing Principles, and Scrap Handling
3 Chapter 3: Product Prerequisites and Dimension Groups
3.1 Product, Storage, and Tracking Dimension Groups 3.2 Item Model Groups, Inventory Models, and Physical/Financial Posting 3.3 Reservation Hierarchies and Unit Sequence Groups
4 Chapter 4: Additional Product Details and Warehouse Fit
4.1 Bar Codes, GTINs, and Product Unit Conversions 4.2 Default Order Settings and Site-Specific Order Settings 4.3 Product Filter Codes and Physical Warehouse Dimensions
5 Chapter 5: Inventory Costing and Pricing
5.1 Costing Versions, Costing Sheets, and Standard Costing 5.2 Base Item Prices, Price Groups, and Price Tolerances 5.3 Trade Agreements, Price/Discount Journals, and Smart Rounding
6 Chapter 6: Inventory Journals and Core Transactions
6.1 Movement, Adjustment, and Transfer Journals 6.2 Counting Journals, Tag Counting, and Cycle Count Adjustments 6.3 Item Arrival Journals, Output Orders, and BOM Journals
7 Chapter 7: Inventory Operations, Blocking, and Closing
7.1 Transfer Orders, In-Transit Warehouses, and Delivery Schedules 7.2 Inventory Blocking Mechanisms, Batch Disposition Codes, and Inventory Status 7.3 Inventory Closing, Recalculation, Settlement, and ABC Classification
8 Chapter 8: Quality Management and Nonconformance
8.1 Quality Control Setup: Tests, Test Groups, and Item Sampling 8.2 Quality Associations, Automatic Generation, and Quality Orders Processing 8.3 Nonconformances, Corrections, Corrective Operations, and Quarantine Orders
9 Chapter 9: Asset Management: Setup and Maintenance
9.1 Assets, Asset Types, and Functional Locations Setup 9.2 Asset Lifecycle Models, Lifecycle States, and Asset Loans 9.3 Work Orders Configuration, Work Order Settings, and Maintenance Capacity Management 9.4 Maintenance Plans, Maintenance Requests, Work Order Scheduling, and Journal Consumption
10 Chapter 10: Procurement and Sourcing Configuration
10.1 Vendors, Vendor Groups, and Procurement Category Hierarchies 10.2 Purchasing Policies, Spending Limits, Procurement Workflows, and Charge Codes 10.3 Purchase Agreements, Vendor Rebates, and Vendor Collaboration Portal
11 Chapter 11: Purchase Order Lifecycle and Consignment
11.1 Purchase Requisitions, Requests for Quotation (RFQs), and Bidding Processes 11.2 Purchase Orders Creation, Over/Under-Delivery Tolerances, Delivery Schedules, and Product Receipt 11.3 Consignment Inventory Replenishment/Ownership Change and Vendor Return Orders
12 Chapter 12: Landed Cost and Inbound Logistics
12.1 Landed Cost Architecture: Voyages, Shipping Containers, Folios, and Journey Templates 12.2 Cost Type Codes, Auto-Costs, and Allocation Methods 12.3 Tracking Control Center, Goods in Transit Orders, and Over/Under Tolerances
13 Chapter 13: Sales Management and Order Processing
13.1 Customers, Customer Groups, Sales Agreements, and Sales Quotations 13.2 Sales Order Processing, Manual and Automatic Reservation, and Sales Returns 13.3 Order Promising: ATP, CTP, Delivery Schedules, and Product Bundles 13.4 Intercompany Trading Chains, Sales Commissions, and Customer Rebates
14 Chapter 14: Warehouse Setup and Core Infrastructure
14.1 Warehouse Topology: Sites, Warehouses, Locations, Profiles, Formats, and Zones 14.2 Work Policies, Work Breaks, and Packing Dimensions 14.3 Wave Templates, Work Templates, and Location Directives Configuration 14.4 Label Layouts, Document Routing, Wave Label Printing, and GS1 Number Sequences
15 Chapter 15: Warehouse Execution Processes
15.1 Inbound Receiving Processes, Planned Cross-Docking, and Putaway 15.2 Outbound Waves, Wave Processing, Picking (Order, Cluster, Batch), and Manual Packing 15.3 Replenishment Strategies (Wave vs. Min/Max) and Inventory Movements via Warehouse Work 15.4 Cycle Counting Plans, Thresholds, Blind Counting, and Automated Containerization
16 Chapter 16: Transportation Management and Logistics
16.1 Shipping Carriers, Carrier Groups, Carrier Services, and Rate/Route Engines 16.2 Route Plans, Route Guides, Inbound/Outbound Loads, and Dock Appointment Scheduling 16.3 Freight Bills, Freight Invoicing, and Manual/Automatic Freight Reconciliation
17 Chapter 17: Warehouse Management Mobile App
17.1 Mobile App Installation, Display Settings, Connection Profiles, and Warehouse Worker Setup 17.2 Mobile Device Menus, Work-Based and Indirect Menu Items, and Inventory Inquiries 17.3 Step Detours Configuration and GS1 Barcode Scanning Implementation
18 Chapter 18: Master Planning and Planning Optimization
18.1 Master Planning Parameters, Coverage Groups, and Planning Optimization Cloud Service Architecture 18.2 Item Coverage Settings, Positive/Negative Days, Time Fences, and Action Messages 18.3 Running Master Planning, Analyzing Results, Planned Orders Firming, and Supply Schedule 18.4 Safety Stock Journals, Safety Margins, and Copilot in Dynamics 365 Supply Chain Management
2.3 BOM Calculations, Cost Group Types, Flushing Principles, and Scrap Handling
Key Takeaways Explain This Topic AI
BOM calculation groups dictate how standard cost rollups obtain component prices (Item purchase price, Cost price, Trade agreements, or Inventory price) and enforce calculation stop flags.
Cost groups categorize manufacturing expenditures into four core types: Direct materials, Direct manufacturing, Indirect, and Outsource, driving Costing Sheet structure and variance reporting.
The four flushing principles (Start, Finish, Manual, and Available at location) control the precise operational timing and inventory conditions under which raw materials are posted to WIP.
The Available at location flushing principle integrates directly with advanced warehouse management (WMS), preventing consumption until warehouse work deposits stock at the production input location.
Scrap on BOM lines and route operations directly inflates Master Planning gross demand, unit standard costs, and production scrap variance postings in the general ledger.
Last updated: September 2026
2.3 BOM Calculations, Cost Group Types, Flushing Principles, and Scrap Handling
A complete Bill of Materials specifies product structure while simultaneously driving product costing , general ledger postings , and shop-floor inventory consumption .
In Dynamics 365 Supply Chain Management (D365 SCM), functional consultants must understand how calculation groups determine cost rollups, how cost groups segment expenses on the costing sheet, how flushing principles automate material picking, and how scrap impacts master planning.
1. BOM Calculation Groups and Cost Price Models
BOM calculations (cost rollups) calculate the cost price and recommended sales price of manufactured goods based on component prices, routing labor, machine runtimes, and overhead surcharges.
Navigation : Cost management > Inventory accounting policies setup > Calculation groups
Calculation groups are assigned to released products on the Manage costs FastTab in the BOM calculation group field.
Cost Price Models in Calculation Groups
Cost Price Model Price Source and Calculation Behavior
Item cost price Uses active standard or planned cost from the item costing version.
Item purchase price Uses static base purchase price from Released Product Purchase FastTab.
Trade agreement Searches active purchase price trade agreements for lowest/primary vendor price.
Inventory price Uses current running financial average cost from inventory transactions.
Calculation Parameters and Stop Explosion
Stop Explosion : Halts multi-level explosion at this subassembly. The engine treats the subassembly as a purchased/stocked part, utilizing its active cost rather than recalculating its underlying lines.
Warning Conditions : Configurable validation rules that flag missing prices, zero-cost components, missing active routes, or expired costs during rollups.
2. Cost Groups and the Costing Sheet Structure
Cost groups provide the classification framework for cost breakdown, inventory valuation, and production variance analysis.
Navigation : Cost management > Inventory accounting policies setup > Cost groups
Every released product and routing cost category links to a specific cost group.
The Four Core Cost Group Types
Direct Materials : Raw materials, subcomponents, and packaging issued from inventory to production orders.
Direct Manufacturing : Machine run time, setup labor, and operator hours linked to routing operations.
Indirect : Overhead surcharges (e.g., 10% on direct materials) or unit rates (e.g., $15.00 per machine hour for electricity and maintenance) calculated via the Costing sheet ( Cost management > Costing sheets setup > Costing sheet ).
Outsource : External subcontractor services and outside processing executed via purchase orders.
Undefined : Generic classification used when cost segmentation is not required.
Variance Analysis in Cost Accounting
During production order end-closing, D365 SCM compares actual costs against standard costs, categorizing variances by cost group into material price variance , quantity/scrap variance , labor rate variance , and efficiency variance .
3. Flushing Principles (Material Consumption Timing)
The Flushing principle defines when and how raw materials are deducted from warehouse inventory and consumed against a production order via picking list journals.
Flushing Principle Trigger Event Warehouse Inventory Condition Primary Operational Use Case
Start Order moves to Started status. Deducted immediately from assigned warehouse/location. Fast assembly, bulk hardware, low-value components.
Finish Order is Reported as finished (RAF). Deducted upon final completion registration. Short cycle runs, automated lines, backflushed kits.
Manual Manual picking list journal creation/posting. Deducted only when operator posts picking journal. Serial/batch tracked items, high-value parts, variable usage.
Available at location Order Start, conditional on WMS putaway. Must be physically present at production input location. Advanced warehouse management (WMS) with warehouse work.
Principle Mechanics
Start : Automatically generates and posts picking lists upon order start. Common for continuous assembly lines.
Finish : Defers consumption until final finished good reporting. Eliminates tracking WIP material for short runs.
Manual : Mandatory for serial-controlled, batch-controlled, or catch-weight components where operators must scan specific identifiers.
Available at Location (WMS) : Bridges production with advanced warehouse management. When an order starts, D365 SCM checks if inventory has arrived at the resource Production input location . If warehouse work is completed, material flushes immediately; if inventory remains in bulk storage, flushing is bypassed to prevent negative inventory.
Resolution Hierarchy
BOM Line : Highest priority setting.
Released Product : Used if set to default on BOM line (configured on Engineer FastTab).
Start / RAF Dialog : Users can override defaults during transaction posting (e.g., selecting "Always" or "Never").
4. Scrap Handling: Formulas and Master Planning Integration
Scrap accounts for unavoidable manufacturing waste across costing and supply planning:
Net vs. Gross Requirement Formulas Net Component Requirement = Consumption Quantity × ( Production Order Quantity Per (Series) ) \text{Net Component Requirement} = \text{Consumption Quantity} \times \left( \frac{\text{Production Order Quantity}}{\text{Per (Series)}} \right) Net Component Requirement = Consumption Quantity × ( Per (Series) Production Order Quantity ) Gross Requirement = ( Net Requirement + Constant Scrap ) × ( 1 + Variable Scrap 100 ) \text{Gross Requirement} = \left( \text{Net Requirement} + \text{Constant Scrap} \right) \times \left( 1 + \frac{\text{Variable Scrap}}{100} \right) Gross Requirement = ( Net Requirement + Constant Scrap ) × ( 1 + 100 Variable Scrap )
Cumulative Route Scrap Compounding
When routing operations include Operation scrap percentage , D365 SCM compounds scrap backwards: preceding operations and raw materials scale up to ensure net output survives downstream scrap.
Supply Planning and Costing Impact
Master Planning (Planning Optimization) : Calculates gross demand including scrap. Planned purchase and production orders are sized to prevent component shortages.
Standard Costing : Expected scrap is factored into unit standard costs. Actual scrap exceeding standard amounts posts to Production scrap variance accounts in the general ledger at production end-closing.
Exam Tips and Common Traps
Available at Location Prerequisite : If materials fail to flush automatically under Available at location, verify that WMS warehouse work has deposited stock at the resource Production input location .
Stop Explosion Parameter : Remember that Stop Explosion on a calculation group stops cost rollups at that subassembly, pulling its active cost instead of recalculating child lines.
Cost Group Classifications : Machine runtime is Direct manufacturing; vendor PO services are Outsource; facility surcharges are Indirect.