Study guide

5.1 Costing Versions, Costing Sheets, and Standard Costing

Microsoft Dynamics 365 Supply Chain Management Functional Consultant MB-330

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Product Master and Released Products

1.1 Product Masters, Variants, and Configuration Technologies 1.2 Product Templates, Category Hierarchies, and Product Lifecycle States 1.3 Product Attributes, Attribute Types, and Attribute Groups

2 Chapter 2: Bills of Materials (BOM) and Formulas

2.1 BOM Lines, Line Types, and Component Configurations 2.2 BOM Versions, Activation, Approvals, and Circularity Checks 2.3 BOM Calculations, Cost Group Types, Flushing Principles, and Scrap Handling

3 Chapter 3: Product Prerequisites and Dimension Groups

3.1 Product, Storage, and Tracking Dimension Groups 3.2 Item Model Groups, Inventory Models, and Physical/Financial Posting 3.3 Reservation Hierarchies and Unit Sequence Groups

4 Chapter 4: Additional Product Details and Warehouse Fit

4.1 Bar Codes, GTINs, and Product Unit Conversions 4.2 Default Order Settings and Site-Specific Order Settings 4.3 Product Filter Codes and Physical Warehouse Dimensions

5 Chapter 5: Inventory Costing and Pricing

5.1 Costing Versions, Costing Sheets, and Standard Costing 5.2 Base Item Prices, Price Groups, and Price Tolerances 5.3 Trade Agreements, Price/Discount Journals, and Smart Rounding

6 Chapter 6: Inventory Journals and Core Transactions

6.1 Movement, Adjustment, and Transfer Journals 6.2 Counting Journals, Tag Counting, and Cycle Count Adjustments 6.3 Item Arrival Journals, Output Orders, and BOM Journals

7 Chapter 7: Inventory Operations, Blocking, and Closing

7.1 Transfer Orders, In-Transit Warehouses, and Delivery Schedules 7.2 Inventory Blocking Mechanisms, Batch Disposition Codes, and Inventory Status 7.3 Inventory Closing, Recalculation, Settlement, and ABC Classification

8 Chapter 8: Quality Management and Nonconformance

8.1 Quality Control Setup: Tests, Test Groups, and Item Sampling 8.2 Quality Associations, Automatic Generation, and Quality Orders Processing 8.3 Nonconformances, Corrections, Corrective Operations, and Quarantine Orders

9 Chapter 9: Asset Management: Setup and Maintenance

9.1 Assets, Asset Types, and Functional Locations Setup 9.2 Asset Lifecycle Models, Lifecycle States, and Asset Loans 9.3 Work Orders Configuration, Work Order Settings, and Maintenance Capacity Management 9.4 Maintenance Plans, Maintenance Requests, Work Order Scheduling, and Journal Consumption

10 Chapter 10: Procurement and Sourcing Configuration

10.1 Vendors, Vendor Groups, and Procurement Category Hierarchies 10.2 Purchasing Policies, Spending Limits, Procurement Workflows, and Charge Codes 10.3 Purchase Agreements, Vendor Rebates, and Vendor Collaboration Portal

11 Chapter 11: Purchase Order Lifecycle and Consignment

11.1 Purchase Requisitions, Requests for Quotation (RFQs), and Bidding Processes 11.2 Purchase Orders Creation, Over/Under-Delivery Tolerances, Delivery Schedules, and Product Receipt 11.3 Consignment Inventory Replenishment/Ownership Change and Vendor Return Orders

12 Chapter 12: Landed Cost and Inbound Logistics

12.1 Landed Cost Architecture: Voyages, Shipping Containers, Folios, and Journey Templates 12.2 Cost Type Codes, Auto-Costs, and Allocation Methods 12.3 Tracking Control Center, Goods in Transit Orders, and Over/Under Tolerances

13 Chapter 13: Sales Management and Order Processing

13.1 Customers, Customer Groups, Sales Agreements, and Sales Quotations 13.2 Sales Order Processing, Manual and Automatic Reservation, and Sales Returns 13.3 Order Promising: ATP, CTP, Delivery Schedules, and Product Bundles 13.4 Intercompany Trading Chains, Sales Commissions, and Customer Rebates

14 Chapter 14: Warehouse Setup and Core Infrastructure

14.1 Warehouse Topology: Sites, Warehouses, Locations, Profiles, Formats, and Zones 14.2 Work Policies, Work Breaks, and Packing Dimensions 14.3 Wave Templates, Work Templates, and Location Directives Configuration 14.4 Label Layouts, Document Routing, Wave Label Printing, and GS1 Number Sequences

15 Chapter 15: Warehouse Execution Processes

15.1 Inbound Receiving Processes, Planned Cross-Docking, and Putaway 15.2 Outbound Waves, Wave Processing, Picking (Order, Cluster, Batch), and Manual Packing 15.3 Replenishment Strategies (Wave vs. Min/Max) and Inventory Movements via Warehouse Work 15.4 Cycle Counting Plans, Thresholds, Blind Counting, and Automated Containerization

16 Chapter 16: Transportation Management and Logistics

16.1 Shipping Carriers, Carrier Groups, Carrier Services, and Rate/Route Engines 16.2 Route Plans, Route Guides, Inbound/Outbound Loads, and Dock Appointment Scheduling 16.3 Freight Bills, Freight Invoicing, and Manual/Automatic Freight Reconciliation

17 Chapter 17: Warehouse Management Mobile App

17.1 Mobile App Installation, Display Settings, Connection Profiles, and Warehouse Worker Setup 17.2 Mobile Device Menus, Work-Based and Indirect Menu Items, and Inventory Inquiries 17.3 Step Detours Configuration and GS1 Barcode Scanning Implementation

18 Chapter 18: Master Planning and Planning Optimization

18.1 Master Planning Parameters, Coverage Groups, and Planning Optimization Cloud Service Architecture 18.2 Item Coverage Settings, Positive/Negative Days, Time Fences, and Action Messages 18.3 Running Master Planning, Analyzing Results, Planned Orders Firming, and Supply Schedule 18.4 Safety Stock Journals, Safety Margins, and Copilot in Dynamics 365 Supply Chain Management

5.1 Costing Versions, Costing Sheets, and Standard Costing

Key Takeaways Explain This Topic AI

Costing versions hold cost records for purchased items, manufactured goods, and routing operations, partitioned by Costing type into Standard cost or Planned cost.

Costing version parameters (Block changes, Block activation, Allow calculation, and Allow activation) strictly regulate whether pending costs can be modeled, updated, calculated, or activated.

The Costing sheet defines the calculation architecture for Cost of Goods Manufactured (COGM) through a hierarchical tree of price components, cost groups, and indirect cost nodes (surcharges and rates).

Single-level BOM calculations evaluate immediate parent components using existing active standard costs, whereas multi-level calculations explode and revalue all subassembly tiers simultaneously.

Activating a standard cost updates active price records, automatically triggers an inventory revaluation for existing on-hand stock, and establishes standard benchmarks for variance accounting.

Last updated: September 2026

5.1 Costing Versions, Costing Sheets, and Standard Costing

Quick Answer: In Microsoft Dynamics 365 Supply Chain Management (D365 SCM), standard costing is maintained through Costing versions and structured via the Costing sheet . Costing versions are partitioned into Standard cost (official inventory valuation, revaluations, and ledger variance posting) and Planned cost (simulations, forecasting, and WIP estimation). The Costing sheet establishes a calculation hierarchy of Price components , Cost groups , and Indirect cost calculation nodes (surcharges and rates). Activating a standard cost updates active prices, revalues on-hand stock, and posts purchase price and production variances to the general ledger.

1. Costing Version Types: Standard Cost vs. Planned Cost

A Costing version is a dataset container holding cost records for purchased items, manufactured assemblies, route cost categories (labor/machine rates), and overhead formulas.

  • Navigation Paths
  • Cost management > Predetermined cost policy setup > Costing versions
  • Inventory management > Setup > Costing > Costing versions

The Costing type determines the operational and financial behavior of the version:

Parameter / Feature Standard Cost Version Planned Cost Version

Primary Purpose Official inventory valuation, COGS, and statutory balance sheet reporting. Cost simulations, annual budgeting, "what-if" analyses, and base price updates.

Item Model Group Link Mandatory for items using an Item Model Group where Inventory model is Standard cost . Supports all inventory models (FIFO, LIFO, Weighted Average, Standard Cost).

Inventory Revaluation Yes : Activation revalues on-hand inventory and posts financial adjustments to the ledger. No : Activation never updates inventory valuation or posts ledger transactions.

Record Constraints Only one active record per item, per site, per effective date. Multiple planned cost records can exist concurrently across simulation versions.

Fallback Principle Requires strict fallback principles ( None or Active ) to guarantee ledger integrity. Supports flexible fallback principles ( Current active , Costing version , None ).

2. Costing Version Parameters and Operational Controls

D365 SCM enforces operational discipline through four primary governance parameters on the Costing version header:

Block changes : Freezes the costing version. When set to Yes , users cannot enter pending prices, import costs, or run BOM cost roll-up calculations.

Block activation : Prevents pending cost records from being activated into active standard costs. Allows reviewing roll-up results without risking premature ledger posting.

Allow calculation : Dictates whether BOM and formula calculations can run against this version. Can restrict calculations to pending costs or disable calculations entirely.

Allow activation : Master toggle that permits or denies activation. If set to No , the Activate action remains disabled across all price records.

Recording Restrictions FastTab

Organizations enforce governance using Recording restrictions :

Site : Locks the version to a single operating site, preventing cross-site cost contamination.

From date : Enforces a strict validity start date for all pending prices created in the version.

Restriction by price type : Restricts lines to Cost (inventory valuation), Purchase price , or Sales price .

3. Costing Sheet Architecture and Node Types

The Costing sheet structures the Cost of Goods Manufactured (COGM) and Cost of Goods Sold (COGS).

  • Navigation Path
  • Cost management > Predetermined cost policy setup > Costing sheets
  • Hierarchy Structure

Root Node and Price Components : The root node (e.g., Total Cost of Manufacturing ) consolidates intermediate price components (e.g., Materials , Labor , Overhead ) used for analytical reporting.

Cost Groups : Master data elements assigned to released products ( Manage costs FastTab) and route cost categories ( Cost categories setup). Types include:

Direct materials : Assigned to purchased components, raw materials, and subassemblies.

Direct manufacturing : Assigned to routing operations (labor run time, setup, machine hours).

Indirect : Assigned to indirect calculation nodes for overhead absorption.

Undefined : General auxiliary classification.

Indirect Cost Calculation Nodes :

Indirect Node Type Calculation Basis Formula Practical Example

Surcharge Percentage markup applied over designated cost groups. Direct Cost Basis × ( Surcharge % 100 ) \text{Direct Cost Basis} \times \left(\frac{\text{Surcharge \%}}{100}\right) Direct Cost Basis × ( 100 Surcharge % ​ ) 12% material handling fee on Direct Materials.

Rate Fixed currency amount per unit of time or physical measure. Routing Hours / Item Qty × Rate Amount \text{Routing Hours / Item Qty} \times \text{Rate Amount} Routing Hours / Item Qty × Rate Amount $18.50 per machine run hour on cutting operations.

Important

Every indirect node requires a configured Calculation basis . For a surcharge, you must select the cost groups included in the base; an empty basis calculates zero overhead.

4. Standard Cost Roll-Up Calculations: Single-Level vs. Multi-Level

Executing a BOM calculation ( Released products > Manage costs tab > BOM calculation ) explodes the product structure using the selected Explosion mode :

Single-level : Explodes only the top-level parent BOM. Manufactured subassemblies use their current active standard costs directly from the database without re-exploding their child BOMs. Used when subassemblies have frozen, approved costs.

Multi-level : Recursively explodes all subassembly tiers down to raw materials, recalculating all intermediate subassembly costs simultaneously. Used during annual cost roll-outs.

Make-to-order : Explodes only subassemblies marked with the Pegged supply BOM line type.

According to BOM line type : Respects individual line behaviors (exploding Phantoms directly while treating Item lines as single-level).

Calculation groups ( Cost management > Predetermined cost policy setup > Calculation groups ) define item-level rules, including Stop explosion (treats a subassembly as purchased) and Fallback principle (searches alternate costing versions if a price is missing).

5. Activating Standard Costs and Variance Accounting

Activating a pending standard cost commits it to InventItemPrice as the active cost.

Inventory Revaluation on Activation

When standard costs are activated and physical on-hand inventory exists at that site, D365 SCM automatically posts an Inventory revaluation : Revaluation Amount = ( New Standard Cost − Old Active Standard Cost ) × On-Hand Physical Quantity \text{Revaluation Amount} = (\text{New Standard Cost} - \text{Old Active Standard Cost}) \times \text{On-Hand Physical Quantity} Revaluation Amount = ( New Standard Cost − Old Active Standard Cost ) × On-Hand Physical Quantity

The transaction debits or credits Inventory receipt and offsets to Inventory revaluation profit/loss accounts in the Inventory posting profile.

Standard Cost Variance Types

Operational variances post to distinct general ledger accounts during daily transactions:

Variance Type Operational Trigger Calculation Formula

Purchase Price Variance (PPV) Invoiced PO price differs from active standard cost. ( Invoice Price − Standard Cost ) × Invoiced Qty (\text{Invoice Price} - \text{Standard Cost}) \times \text{Invoiced Qty} ( Invoice Price − Standard Cost ) × Invoiced Qty

Material Usage Variance Actual raw materials picked differ from estimated BOM quantity. ( Actual Qty − Standard BOM Qty ) × Standard Cost (\text{Actual Qty} - \text{Standard BOM Qty}) \times \text{Standard Cost} ( Actual Qty − Standard BOM Qty ) × Standard Cost

Labor Efficiency Variance Actual route hours reported differ from standard operation time. ( Actual Hours − Standard Hours ) × Standard Rate (\text{Actual Hours} - \text{Standard Hours}) \times \text{Standard Rate} ( Actual Hours − Standard Hours ) × Standard Rate

Labor Rate Variance Actual labor rate charged differs from standard category rate. ( Actual Rate − Standard Rate ) × Actual Hours (\text{Actual Rate} - \text{Standard Rate}) \times \text{Actual Hours} ( Actual Rate − Standard Rate ) × Actual Hours

Lot Size Variance Fixed setup costs amortized over actual batch size differing from standard lot size. Fixed Setup Cost × ( 1 Actual Batch − 1 Standard Lot ) \text{Fixed Setup Cost} \times \left( \frac{1}{\text{Actual Batch}} - \frac{1}{\text{Standard Lot}} \right) Fixed Setup Cost × ( Actual Batch 1 ​ − Standard Lot 1 ​ )

Exam Tips and Common Traps

Tip

Exam Tip — Planned vs. Standard Costing: For budget modeling, testing commodity price increases, or updating base sales prices without altering balance sheet inventory valuations, select Planned cost .

Important

Exam Tip — Surcharge Input Basis: If a costing sheet surcharge does not calculate overhead on production orders, verify that the direct material cost groups are assigned to its Calculation basis .

Warning

Exam Trap — Block Activation vs. Block Changes: Setting Block changes prevents price edits or calculations but allows activating existing pending costs. To halt price activations, enable Block activation .

Loading diagram... Costing Sheet Structure and Standard Cost Roll-Up Architecture