Study guide
8.4 Backflow Assembly Field Testing Procedures & Gauge Use
Maryland Journeyman Plumber Journey Plumber/Gas Fitter
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: Maryland Licensing, Code Administration & the Exam
1.1 Maryland Plumbing Regulations & Licensing 1.2 The Journey Plumber/Gas Fitter Exam: Format, References & Open-Book Strategy
2 Chapter 2: Job-Site Safety & OSHA 29 CFR 1926
2.1 OSHA Construction Safety, PPE & Hazard Communication 2.2 Excavation & Trenching Safety (29 CFR 1926 Subpart P) 2.3 Confined Spaces, Ladders, Scaffolds & Hot Work
3 Chapter 3: Materials, Uses & Specifications
3.1 Approved Plumbing Materials, Pipes & Jointing 3.2 Hanger Spacing, Structural Protection & System Testing 3.3 Valves, Fittings, Fitting Selection & Prohibited Connections
4 Chapter 4: Sanitary Drainage & Waste Piping
4.1 Drainage Fixture Units (DFU) & Drain Pipe Sizing 4.2 Building Sewers, Cleanout Clearances & Underground Piping 4.3 Indirect & Special Waste Systems 4.4 Backwater Valves, Sump Pumps & Sewage Ejectors
5 Chapter 5: Venting Systems
5.1 Vent Sizing, Termination & Soil Stacks 5.2 Individual, Branch & Common Vents 5.3 Wet Venting & Circuit Venting 5.4 Air Admittance Valves (AAVs) & Special Venting
6 Chapter 6: Traps, Interceptors & Backwater Valves
6.1 Traps, Trap Seals & Trap Arm Requirements 6.2 Grease, Oil & Special-Waste Interceptors and Separators
7 Chapter 7: Water Supply & Distribution Systems
7.1 Water Supply Sizing & Fixture Unit (WSFU) Method 7.2 Water Heaters & Safety Devices 7.3 Pressure Regulation, Booster Systems & Disinfection 7.4 Water Service Piping, Meters, Valves & System Protection
8 Chapter 8: Backflow Prevention & Cross-Connection Control
8.1 Backflow Prevention & Cross-Connection Control 8.2 Air Gaps, Vacuum Breakers & Their Application Limits 8.3 Double Check & Reduced Pressure Principle (RPZ) Assemblies 8.4 Backflow Assembly Field Testing Procedures & Gauge Use 8.5 Maryland Backflow Program: 32-Hour Course, Certification & Reporting
9 Chapter 9: Fuel Gas Fundamentals, Materials & Pipe Sizing
9.1 Fuel Gas Properties, Heating Values & IFGC Scope 9.2 Fuel Gas Pipe Sizing & Materials 9.3 Approved Gas Piping Materials, CSST & Bonding 9.4 Gas Pipe Sizing Tables: Longest-Length & Branch-Length Methods 9.5 LP-Gas Systems, NFPA 58 & Propane-Specific Rules
10 Chapter 10: Gas Piping Installation, Testing & Purging
10.1 Gas Piping Installation, Testing & Purging 10.2 Gas Piping Support, Protection, Prohibited Locations & Concealed Piping 10.3 Shutoff Valves, Drips, Unions, Sediment Traps & Appliance Connectors 10.4 Gas Meters, Regulators, Pressure Levels & Overpressure Protection 10.5 Gas Leak Detection, Odorization & Emergency Response
11 Chapter 11: Gas Appliance Venting & Combustion Air
11.1 Gas Appliance Venting & Combustion Air 11.2 Appliance Categories I-IV, Vent Materials & Vent Connectors 11.3 Chimney & Vent Sizing Tables (Type B, Masonry & Common Venting) 11.4 Vent Termination, Clearances & Direct-Vent Systems 11.5 Combustion Air: Indoor & Outdoor Methods and Opening Sizing
12 Chapter 12: Gas Appliance Installation & Service
12.1 Gas Water Heaters, Furnaces & Boilers: Installation Rules 12.2 Appliance Clearances to Combustibles, Access & Location Limits 12.3 Gas Appliance Troubleshooting, Combustion Analysis & CO Safety
13 Chapter 13: Plumbing Fixtures, Fittings & Appliances
13.1 Fixture Clearances, Accessibility & Installation 13.2 Water Conservation Standards & Flow Rates 13.3 Commercial & Specialty Fixture Requirements
14 Chapter 14: Plumbing Mathematics
14.1 Plumbing Math I: Areas, Volumes, Capacities & Water Weight 14.2 Plumbing Math II: Offsets, Travel, Grade & Pipe Layout 14.3 Plumbing Math III: Gas Math, Meter Readings, BTU & Pressure Conversions
8.4 Backflow Assembly Field Testing Procedures & Gauge Use
Key Takeaways Explain This Topic AI
A double check valve assembly passes when each of its two check valves independently holds 1.0 psid or greater against reverse flow.
On a reduced pressure principle assembly the relief valve must open at 2.0 psid or greater; the USC 10th Edition requires check valve No. 1 to read 5.0 psid or greater and above that opening point, replacing the 9th Edition's 3.0 psid buffer.
A pressure vacuum breaker passes when the air inlet opens at 1.0 psid or greater and opens fully, and the check valve holds 1.0 psid or greater.
Test cocks are numbered in the direction of flow: No. 1 upstream of shutoff No. 1, No. 2 ahead of check No. 1, No. 3 in the zone between the checks, No. 4 downstream of check No. 2.
IPC 2018 Section 312.10.2 requires testable assemblies to be tested at installation, immediately after repairs or relocation, and at least annually; field test kits should be accuracy-checked against a NIST-traceable reference at least yearly within plus or minus 0.2 psid.
Last updated: July 2026
8.4 Backflow Assembly Field Testing Procedures & Gauge Use
Quick Answer: Under the USC Foundation's Manual of Cross-Connection Control , 10th Edition , a double check valve assembly (DCVA) passes when each check valve holds 1.0 psid or greater ; a reduced pressure principle assembly (RP) passes when the relief valve opens at 2.0 psid or greater , check valve No. 1 reads 5.0 psid or greater and above the relief valve opening point , and check valve No. 2 holds tight; and a pressure vacuum breaker (PVB) passes when the air inlet opens at 1.0 psid or greater and the check valve holds 1.0 psid or greater .
Maryland's Journey Plumber/Gas Fitter exam devotes 10 of 100 items to Backflow Prevention, and every applicant must already hold a non-expired 32-hour Backflow Prevention Device Testing certificate. That means PSI can write questions at the level of the field test itself, not just device selection. "Any standard backflow text" is an allowed open-book reference, so bring the manual you were trained from and tab the field test procedures.
Reading the Field Test Kit
A backflow test kit is built around a differential pressure gauge — a gauge that senses two pressure points and displays the single difference between them. When you use two hoses, the reading is in psid (pounds per square inch differential). When you use only the high-side hose and let the low side sense the atmosphere (the normal PVB setup), the same gauge is functionally reading psig .
- Hose (typical color) Kit port What it senses
- High (red) High side The higher-pressure point — usually upstream of the check valve being tested
- Low (green or blue) Low side The lower-pressure point — usually downstream of that check valve
Bypass (black or yellow) Bypass Line pressure taken from test cock No. 1, used to feed the assembly around a closed No. 1 shutoff or to re-pressurize the zone
The needle valves do the work. A five-valve kit has a high control , a low control and a bypass control needle valve plus a high bleed and low bleed ; a three-valve kit combines the control and bleed functions. The bleed valves purge air; the control valves let you raise or lower pressure on one side of the gauge slowly and deliberately. On an RP relief-valve test you crack the high-side bleed no more than about a quarter turn so the opening point is captured, not overshot.
Kit accuracy is not optional. The USC 10th Edition standard for a field test kit calls for accuracy within plus or minus 0.2 psid on decreasing differential readings, verified against a reference traceable to the National Institute of Standards and Technology (NIST) at least once a year . A kit is USC-approved only with the manufacturer's original hoses and needle valves — swapping in generic hoses voids the approval. Most Maryland purveyors require the gauge's last calibration date on the test report.
Test Cock Identification and Numbering
Test cocks are numbered in the direction of flow, and the numbering is the same on a double check and on a reduced pressure principle assembly.
Test cock Location on a DC or RP Pressure it gives you
No. 1 Upstream of shutoff valve No. 1 Full supply (line) pressure — the bypass source, still live when shutoff No. 1 is closed
- No. 2 Between shutoff No. 1 and check valve No. 1 Supply pressure entering the first check
- No. 3 Between check valve No. 1 and check valve No. 2 Zone pressure (the reduced pressure zone on an RP)
- No. 4 Between check valve No. 2 and shutoff valve No. 2 Downstream pressure
A PVB has only two test cocks: No. 1 upstream of the check valve, and No. 2 opening into the body downstream of the check valve, beneath the air inlet.
Flush every test cock before you connect anything. Debris under a test cock seat leaks, and grit carried into the gauge ruins readings. The 10th Edition RP flushing sequence is deliberate: open No. 4, then No. 3, then No. 2, then No. 1, and only then close them in the order 1, 2, 3, 4. Keeping water moving through the assembly is what prevents the differential relief valve from discharging before you have recorded its opening point.
Double Check Valve Assembly: The Standard Sequence
The DCVA test asks one question of each check: is it tight against reverse flow? The accepted logic is that a check holding 1.0 psid or greater in the normal direction of flow, with atmosphere downstream, will also hold tight in the reverse direction.
Notify the customer, identify the assembly, inspect it and observe the direction of flow.
Flush the test cocks and install adapters.
Set the gauge level with the centerline of the assembly, or level with the top of the water in the sight tube when test cock No. 3 sits below the check valve body.
Connect the high-side hose to the test cock upstream of the check being tested; open it and bleed the hose free of air.
Close shutoff No. 2, then shutoff No. 1.
Open the test cock downstream of that check to drop that side to atmospheric pressure.
When flow stops and the needle settles, record the static pressure drop.
Pass criterion: 1.0 psid or greater, needle steady. A needle that falls to 0.0 means the check leaked. Repeat for the second check, then restore service by opening shutoff No. 1 slowly, then shutoff No. 2.
One ordering rule matters: if check No. 1 reads less than 1.0 psid and shutoff No. 1 is leaking, repair check No. 1 and start over. A first check that will not hold lets the trapped zone water bleed backward out the open test cock, so the second-check reading you get is fiction.
- Reduced Pressure Principle Assembly: Tests 1, 2 and 3
- Test No. 1 — Relief valve opening point
The differential relief valve must hold the zone at least 2 psi below supply pressure, so the practical pass criterion is an opening point of 2.0 psid or greater . Record it before you exercise the relief valve. Popping a sticky relief valve first loosens it and produces an artificially high reading — and real backflow never exercises the relief valve as a courtesy first.
Test No. 2 — Check valve No. 1 tightness
This is the one criterion that genuinely varies, so know both versions:
Edition Criterion for check valve No. 1
USC 9th Edition At least 3.0 psid above the relief valve opening point (a "buffer" USC itself described as varying from one administrative authority to another)
USC 10th Edition (current) 5.0 psid or greater, and above the relief valve opening point — the 3.0 psid buffer was eliminated
Worked example. The relief valve opens at 2.4 psid and check No. 1 reads 5.2 psid.
9th Edition: required minimum = 2.4 + 3.0 = 5.4 psid . 5.2 < 5.4, so it fails .
10th Edition: required minimum = 5.0 psid and greater than 2.4 psid. 5.2 satisfies both, so it passes .
Same assembly, same readings, opposite verdicts. Answer exam questions using the criterion the question names; where none is named, the 10th Edition 5.0 psid rule is the current national standard.
There is no published maximum for check No. 1, but a reading in the mid-teens on a large assembly is a red flag: add the second check's minimum 1.0 psid plus the assembly's other losses and total pressure loss can exceed what that size assembly is rated for, which points to a binding or wrongly sprung first check.
Test No. 3 — Check valve No. 2 tightness
Check No. 2 must simply hold tight. Using a direction-of-flow test, it must hold 1.0 psid or greater with the downstream side dropped to atmosphere. A gauge reading that climbs instead of holding indicates backpressure past a leaking No. 2 shutoff.
Pressure Vacuum Breaker and Spill-Resistant Vacuum Breaker
Remove the canopy, flush both test cocks, and set the gauge at the elevation of the assembly.
Air inlet opening point: high hose to test cock No. 2, close shutoff No. 2 then shutoff No. 1, then crack the high-side bleed no more than a quarter turn. Record the reading the moment the air inlet pops — it must be 1.0 psid or greater . Then pull the hose, let the body drain, and confirm visually that the air inlet opens fully .
Check valve: high hose to test cock No. 1, close shutoff No. 1, open test cock No. 2 to drop the downstream side to atmosphere. When flow stops or is no more than a drip, record the reading — it must be 1.0 psid or greater .
An SVB uses the same two numbers: check valve drip-tight at 1.0 psid or greater, air inlet opening at 1.0 psid or greater and opening fully. If the gauge simply will not drop and the air inlet never opens, suspect a leaking No. 1 shutoff. If it drops straight to 0.0 with no pop, suspect a disc stuck to its seat, a broken or missing air-inlet spring, or an old non-loaded device that is not a true PVB.
Diagnosing Failures Before You Condemn the Assembly
Symptom Most likely cause Correct action
Needle drops to 0.0 psid Fouled or cut check disc, damaged seat, broken spring Rebuild that check, retest from the first test
Reading of 0.1–0.9 psid Debris on the seat or a weak spring Clean or re-spring, retest
Relief valve drips continuously under static conditions Fouled check No. 1 or too small a margin between check No. 1 and the relief opening point Service check No. 1
Needle bounces, or reads high then slowly decays Trapped air in a hose or in the gauge body Bleed high and low sides until air-free, re-level the gauge, retest
Water will not stop running from the downstream test cock Leaking No. 1 shutoff Use the compensating bleed tee, or repair the shutoff
DC check reading above 5.0 psid Wrong spring — often an RP first-check spring in a DC body Correct the spring
Two errors invalidate more field tests than worn rubber does: trapped air and gauge elevation . Water weighs 0.433 psi per foot of head, so a gauge held below the water level it is sensing reads high by 0.433 psi for every foot of error. Hold the gauge 2.3 feet too low and you add 2.3 x 0.433 = 1.0 psi of pure fiction — exactly enough to turn a 0.6 psid failing check into a 1.6 psid "pass." Always hold the gauge level with the centerline of the assembly, or level with the top of the water in the sight tube.
Failure, Repair, Retest and Reporting
When an assembly fails, the sequence is repair, retest, report — never "note it and move on." Clean or replace discs, seats, springs and rubber, then retest the entire assembly starting from Test No. 1 , because a repair to one component changes the pressures the others see. Record both the initial readings and the after-repair readings; purveyor report forms have separate fields for each. A high-hazard connection that cannot be repaired the same day must not be left in service.
A complete test report carries the assembly make, model, size and serial number; its location; the initial reading for every component; repairs performed; the after-repair readings; line pressure; the gauge make, serial number and last calibration or accuracy-check date; and the tester's name, license number, certification number and signature. Give one copy to the owner, submit one to the water purveyor under its cross-connection control program, and keep one for your own records.
Frequency comes from the code, not from the customer. IPC 2018 Section 312.10.2 requires reduced pressure principle, double check, pressure vacuum breaker, reduced pressure detector fire protection, double check detector fire protection and spill-resistant vacuum breaker assemblies to be tested at the time of installation, immediately after repairs or relocation, and at least annually . Section 312.10.1 requires annual inspections of assemblies and air gaps to confirm they are operable and that the air gaps still exist.
Exam Trap: 2.0 psid belongs to the relief valve, not to any check valve. Distractors offer "2.0 psid" as the double check criterion (it is 1.0 psid) or as the RP first-check criterion (it is 5.0 psid under the 10th Edition). A second favorite distractor is "0.5 psid," which is below every published minimum, and a third is applying the RP's 5.0 psid figure to a PVB check valve, which is judged at 1.0 psid.