Study guide

12.1 Gas Water Heaters, Furnaces & Boilers: Installation Rules

Maryland Journeyman Plumber Journey Plumber/Gas Fitter

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Maryland Licensing, Code Administration & the Exam

1.1 Maryland Plumbing Regulations & Licensing 1.2 The Journey Plumber/Gas Fitter Exam: Format, References & Open-Book Strategy

2 Chapter 2: Job-Site Safety & OSHA 29 CFR 1926

2.1 OSHA Construction Safety, PPE & Hazard Communication 2.2 Excavation & Trenching Safety (29 CFR 1926 Subpart P) 2.3 Confined Spaces, Ladders, Scaffolds & Hot Work

3 Chapter 3: Materials, Uses & Specifications

3.1 Approved Plumbing Materials, Pipes & Jointing 3.2 Hanger Spacing, Structural Protection & System Testing 3.3 Valves, Fittings, Fitting Selection & Prohibited Connections

4 Chapter 4: Sanitary Drainage & Waste Piping

4.1 Drainage Fixture Units (DFU) & Drain Pipe Sizing 4.2 Building Sewers, Cleanout Clearances & Underground Piping 4.3 Indirect & Special Waste Systems 4.4 Backwater Valves, Sump Pumps & Sewage Ejectors

5 Chapter 5: Venting Systems

5.1 Vent Sizing, Termination & Soil Stacks 5.2 Individual, Branch & Common Vents 5.3 Wet Venting & Circuit Venting 5.4 Air Admittance Valves (AAVs) & Special Venting

6 Chapter 6: Traps, Interceptors & Backwater Valves

6.1 Traps, Trap Seals & Trap Arm Requirements 6.2 Grease, Oil & Special-Waste Interceptors and Separators

7 Chapter 7: Water Supply & Distribution Systems

7.1 Water Supply Sizing & Fixture Unit (WSFU) Method 7.2 Water Heaters & Safety Devices 7.3 Pressure Regulation, Booster Systems & Disinfection 7.4 Water Service Piping, Meters, Valves & System Protection

8 Chapter 8: Backflow Prevention & Cross-Connection Control

8.1 Backflow Prevention & Cross-Connection Control 8.2 Air Gaps, Vacuum Breakers & Their Application Limits 8.3 Double Check & Reduced Pressure Principle (RPZ) Assemblies 8.4 Backflow Assembly Field Testing Procedures & Gauge Use 8.5 Maryland Backflow Program: 32-Hour Course, Certification & Reporting

9 Chapter 9: Fuel Gas Fundamentals, Materials & Pipe Sizing

9.1 Fuel Gas Properties, Heating Values & IFGC Scope 9.2 Fuel Gas Pipe Sizing & Materials 9.3 Approved Gas Piping Materials, CSST & Bonding 9.4 Gas Pipe Sizing Tables: Longest-Length & Branch-Length Methods 9.5 LP-Gas Systems, NFPA 58 & Propane-Specific Rules

10 Chapter 10: Gas Piping Installation, Testing & Purging

10.1 Gas Piping Installation, Testing & Purging 10.2 Gas Piping Support, Protection, Prohibited Locations & Concealed Piping 10.3 Shutoff Valves, Drips, Unions, Sediment Traps & Appliance Connectors 10.4 Gas Meters, Regulators, Pressure Levels & Overpressure Protection 10.5 Gas Leak Detection, Odorization & Emergency Response

11 Chapter 11: Gas Appliance Venting & Combustion Air

11.1 Gas Appliance Venting & Combustion Air 11.2 Appliance Categories I-IV, Vent Materials & Vent Connectors 11.3 Chimney & Vent Sizing Tables (Type B, Masonry & Common Venting) 11.4 Vent Termination, Clearances & Direct-Vent Systems 11.5 Combustion Air: Indoor & Outdoor Methods and Opening Sizing

12 Chapter 12: Gas Appliance Installation & Service

12.1 Gas Water Heaters, Furnaces & Boilers: Installation Rules 12.2 Appliance Clearances to Combustibles, Access & Location Limits 12.3 Gas Appliance Troubleshooting, Combustion Analysis & CO Safety

13 Chapter 13: Plumbing Fixtures, Fittings & Appliances

13.1 Fixture Clearances, Accessibility & Installation 13.2 Water Conservation Standards & Flow Rates 13.3 Commercial & Specialty Fixture Requirements

14 Chapter 14: Plumbing Mathematics

14.1 Plumbing Math I: Areas, Volumes, Capacities & Water Weight 14.2 Plumbing Math II: Offsets, Travel, Grade & Pipe Layout 14.3 Plumbing Math III: Gas Math, Meter Readings, BTU & Pressure Conversions

12.1 Gas Water Heaters, Furnaces & Boilers: Installation Rules

Key Takeaways Explain This Topic AI

IPC 2018 Section 504.6 requires relief discharge piping to terminate not more than 6 inches above, and not less than two pipe diameters above, the floor or receptor flood level rim.

IPC 504.5 caps the T&P valve at a 210 degrees F temperature setting and a pressure setting no greater than the tank rating or 150 psi, whichever is less.

IFGC 305.3 requires the lowest ignition source to sit at least 18 inches above the floor in garages, with an exception for flammable-vapor-ignition-resistant appliances.

An attic appliance needs a 30-inch-high by 22-inch-wide passageway no longer than 20 feet, 24-inch-wide solid flooring, and a 30-inch by 30-inch service space (IFGC 306.3).

IPC 504.7 forbids a plastic pan under a gas-fired water heater; the pan is at least 1-1/2 inches deep with a 3/4-inch indirect waste drain.

Last updated: July 2026

12.1 Gas Water Heaters, Furnaces & Boilers: Installation Rules

Quick Answer: IPC 2018 Section 504.6 governs temperature and pressure (T&P) relief discharge piping. The line must be full size , must not be trapped , must flow by gravity , must have no valves or tee fittings , must have no threaded connection at the outlet end , must not connect directly to the drainage system, and must terminate not more than 6 inches above -- and not less than two discharge-pipe diameters above -- the floor or the flood level rim of the waste receptor .

Gas Appliances and Piping is 40 of the 100 scored questions , and Maryland licenses this trade as a combined Journey Plumber/Gas Fitter , so appliance work is squarely in scope. Setting a gas water heater draws on two open-book references at once: the International Plumbing Code (IPC) 2018 for the water side, and the International Fuel Gas Code (IFGC) 2018 for the gas and combustion side.

The Rule That Outranks the Code

IFGC 305.1 decides most field arguments. Appliances are installed per the terms of their approval, the conditions of the listing , the manufacturer's instructions and the code -- and where a code provision is less restrictive than the listing or the instructions, the listing and the instructions govern . Those instructions must be on the job site at the time of inspection.

The nameplate required by IFGC 301.5 carries what you install to: manufacturer, model and serial number, the hourly input rating in Btu/h , the fuel type approved for the appliance, and the minimum clearances. IFGC 301.7.1 forbids converting an appliance to a different fuel gas unless complete conversion instructions come from the installation instructions, the serving gas supplier or the manufacturer.

Water Heater Safety Devices (IPC Section 504)

A storage water heater operating above atmospheric pressure needs an approved, self-closing (levered) pressure relief valve and temperature relief valve, or a combination T&P valve , conforming to ANSI Z21.22 (504.4). The valve is installed in the shell of the tank, and the temperature element must be located so it is actuated by the water in the top 6 inches of the tank (504.4.1). There shall be no check valve or shutoff valve between the relief valve and the tank it serves , and the relief valve may never be used to control thermal expansion.

  • Requirement 2018 IPC value Section
  • Temperature setting Not more than 210 degrees F 504.5
  • Pressure setting Not more than the tank's rated working pressure or 150 psi , whichever is less 504.5
  • Relieving capacity Equal to or greater than the heat input to the heater or tank 504.5
  • Temperature element location Top 6 inches of the tank 504.4.1
  • Drain valve inlet Not less than 3/4-inch nominal iron pipe size, hose-threaded outlet 501.3
  • Tankless outlet temperature Not greater than 140 degrees F for domestic uses 501.6
  • The 504.6 Discharge-Piping Checklist

The discharge line is an extension of the potable water system, so it terminates through an air gap in the same room as the water heater and is never hard-piped into the drainage system. It serves one relief device only . It discharges to the floor, to the water heater pan, to a waste receptor or to the outdoors, in a manner that causes no personal injury or structural damage, at a point readily observable by the building occupants . Materials are those listed in IPC Section 605.4 or tested and approved to ASME A112.4.1.

Worked Example -- Sizing and Terminating the Discharge Line

A residential heater has a 3/4-inch relief valve outlet.

Minimum discharge pipe: 3/4 inch , full size to the air gap (504.6, item 3).

If the line is run in tubing with insert fittings , go up one nominal size to 1 inch , and fasten the outlet end in place (item 14). Insert fittings shrink the inside diameter and choke a full-trip discharge.

Termination window above a concrete floor: not less than 2 x 0.75 = 1.5 inches and not more than 6 inches (item 10).

No threads on that outlet end (item 11) and no valve or tee anywhere in the run (item 12).