14.4 Medical Gas, Vacuum & Nonmedical Oxygen Piping (MPC Chapter 12)

Michigan Journeyman Plumber Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: Michigan Plumbing Law, Administration & Licensing

1.1 Michigan Skilled Trades Regulation Act (PA 407 Article 11) & Licensing Hierarchy 1.2 Permits, Applications, Inspections & Code Enforcement 1.3 Essential Plumbing Code Definitions & Terminology

2 Chapter 2: General Regulations & Structural Safety

2.1 Piping Protection, Trenching, Bedding & Backfill 2.2 Structural Safety: Boring, Notching & Cutting of Structural Members 2.3 Pipe Hangers, Supports & Spacing Requirements 2.4 Michigan Frost Protection & Underground Piping Depths

3 Chapter 3: Fixtures, Faucets & Fixture Fittings

3.1 Minimum Plumbing Fixtures, Occupancy Calculations & ADA Accessibility 3.2 Installation of Fixtures: Setting, Clearances, Connections & Access 3.3 Water Closets, Urinals & Flushing Devices 3.4 Showers, Bathtubs & Scald Prevention Standards 3.5 Sinks, Lavatories, Drinking Fountains & Emergency Fixtures

4 Chapter 4: Water Heaters & Hot Water Safety

4.1 Water Heater Sizing, Location, Clearances & Combustion Air 4.2 Temperature & Pressure (T&P) Relief Valves & Discharge Piping 4.3 Thermal Expansion Control, Safety Pans & Drain Terminations

5 Chapter 5: Water Supply Sizing & Distribution

5.1 Water Service Sizing & Water Supply Fixture Units (WSFU) 5.2 Water Distribution Pipe Sizing, Velocity & Pressure Drop 5.3 Potable Water Piping Materials, Joining Methods & Valves 5.4 Potable Water System Testing, Disinfection & Commissioning 5.5 Health Care Plumbing: Hospitals, Labs & Medical Offices (MPC 609)

6 Chapter 6: Cross-Connection Control & Backflow Prevention

6.1 Backflow Principles: Backpressure, Backsiphonage & Hazard Levels 6.2 Backflow Prevention Assemblies & Devices 6.3 Installation, Testing & Certification of Backflow Preventers

7 Chapter 7: Sanitary Drainage: Sizing & System Layout

7.1 Drainage Fixture Units (DFU) & Building Drain / Sewer Sizing 7.2 Minimum Slopes, Flow Velocity & Horizontal Drainage Piping 7.3 Soil & Waste Stacks, Stack Offsets & Base Fittings 7.4 Sump Pumps, Sewage Ejectors & Macerating Toilet Systems

8 Chapter 8: Sanitary Drainage: Cleanouts, Materials & Testing

8.1 Cleanout Sizing, Location, Clearances & Direction of Flow 8.2 Drainage Pipe Materials, Drainage Fittings & Prohibited Fittings 8.3 Drainage System Testing: Water, Air & Final Inspection Tests

9 Chapter 9: Indirect & Special Waste Systems

9.1 Air Gaps vs. Air Breaks: Code Definitions, Sizing & Applications 9.2 Food Handling Establishments, Commercial Dishwashers & Beverage Lines 9.3 Chemical, Corrosive & Special Laboratory Waste Systems

10 Chapter 10: Vents & Venting: Principles & Sizing

10.1 Venting Fundamentals: Atmospheric Pressure & Trap Seal Protection 10.2 Vent Stacks, Stack Vents & Individual Vent Sizing Rules 10.3 Vent Terminations, Roof Penetrations & Michigan Frost Closure

11 Chapter 11: Advanced Venting Systems

11.1 Wet Venting: Horizontal & Vertical Rules and Pipe Sizing 11.2 Circuit & Loop Venting: Sizing, Fixture Limits & Relief Vents 11.3 Combination Waste & Vent Systems (CWV) 11.4 Air Admittance Valves (AAVs) & Michigan Part 7 Restrictions

12 Chapter 12: Traps, Interceptors & Separators

12.1 Fixture Trap Design, Trap Seal Depth & Maximum Trap-to-Vent Distance 12.2 Prohibited Traps, Double Trapping & Trap Seal Primer Mechanisms 12.3 Grease Interceptors: Hydromechanical (HGI) vs. Gravity (GGI) 12.4 Oil Separators, Sand Interceptors & Flammable Liquid Separation

13 Chapter 13: Storm Drainage Systems

13.1 Roof Drainage Sizing & Michigan Rainfall Rates 13.2 Primary vs. Secondary (Emergency) Overflow Roof Drainage 13.3 Conductors, Leaders, Building Storm Drains & Sump Systems

14 Chapter 14: Gas Piping Systems: Fuel Gas & Medical Gas

14.1 Fuel Gas Sizing Methods: Longest Length & Branch Sizing 14.2 Fuel Gas Piping Materials, Fittings, Joining & Hangers 14.3 Appliance Shutoffs, Regulators, Sediment Traps & Pressure Testing 14.4 Medical Gas, Vacuum & Nonmedical Oxygen Piping (MPC Chapter 12)

15 Chapter 15: Isometric Drawings & Blueprint Reading

15.1 Isometric Drawing Fundamentals: 30-Degree Axes & Fitting Symbols 15.2 Reading & Interpreting DWV Isometric Riser Diagrams 15.3 Reading & Interpreting Water Supply & Gas Isometric Layouts 15.4 Identifying Code Violations & Layout Errors in Isometric Drawings

16 Chapter 16: Plumbing Math, Calculations & Practical Skills

16.1 45-Degree Offsets, Rolling Offsets & Fitting Allowances 16.2 Grade, Fall, Percentage of Slope & Invert Elevation Calculations 16.3 Volume, Capacity, Head Pressure & Flow Rate Calculations 16.4 Michigan Practical Examination: Soldering, Brazing, Assembly & Safety

14.4 Medical Gas, Vacuum & Nonmedical Oxygen Piping (MPC Chapter 12)

Key Takeaways Explain This Topic AI

MCL 339.6103(c) and the amended MPC 101.2 both place medical gas systems inside the Michigan definition of plumbing, and R 408.30701 adopts IPC Chapter 12 in full.

MPC 1202.1 requires nonflammable medical gas, inhalation anesthetic and vacuum piping to be installed, tested and labeled per NFPA 99; MPC 1203.1 sends nonmedical oxygen systems to NFPA 51 and NFPA 55.

Medical gas tube is hard-drawn seamless copper to ASTM B819, Type L (Type K above 185 psi gauge and larger than DN80), cleaned for oxygen service per CGA G-4.1 and delivered capped.

Every brazed medical gas joint must be made under a continuous flow of oil-free dry nitrogen, by a brazer qualified to ASME Section IX and an installer certified to ASSE 6010.

The initial pressure test is one and one-half times working pressure and not less than 150 psi gauge with oil-free dry nitrogen, followed by a 24-hour standing pressure test at 20 percent above normal operating pressure.

Last updated: September 2026

Medical Gas, Vacuum & Nonmedical Oxygen Piping (MPC Chapter 12)

Exam Focus: This is the one "gas" chapter that genuinely belongs to the Michigan plumber. MCL 339.6103(c) defines "plumbing" to include medical gas systems , the amended MPC 101.2 puts medical gas systems inside the scope of the plumbing code, and R 408.30701 adopts IPC Chapter 12 in full - only Chapters 13 and 14 were excluded from adoption. Fuel gas, by contrast, is sent to the Michigan Mechanical Code by that same MPC 101.2. If a Journey Plumber question asks about a "gas" system that a plumber installs under the plumbing code, it is asking about medical gas .

1. Why Medical Gas Is Plumbing in Michigan

Two independent documents put medical gas squarely inside the journey plumber's trade:

Source Language

MCL 339.6103(c) , Skilled Trades Regulation Act, 2016 PA 407 "'Plumbing' means the practice, materials, and fixtures ... in connection with the sanitary drainage or storm drainage facilities, plumbing venting systems, medical gas systems , backflow preventers, and public or private water supply systems."

MPC 101.2 as amended by R 408.30711 "The design and installation of plumbing systems, including sanitary and storm drainage, sanitary facilities, medical gas systems , water supplies, water service, and storm water and sewage disposal in and exiting buildings, shall comply with the requirements of the code."

Both are open-book references at the PSI test center: the Skilled Trades Regulation Act is one of the three permitted documents, and MPC 101.2 is the first page of the code book.

2. The Three Sections of Chapter 12

Chapter 12 is unusually short - it is almost entirely a pointer to NFPA standards.

Section Text Referenced standard (MPC Chapter 15)

1201.1 Scope Governs the design and installation of piping and storage systems for nonflammable medical gas systems and nonmedical oxygen systems . All maintenance and operations of such systems shall be in accordance with the International Fire Code . -

1202.1 Nonflammable medical gases Nonflammable medical gas systems, inhalation anesthetic systems and vacuum piping systems shall be installed, tested and labeled in accordance with NFPA 99 . NFPA 99-21 , Health Care Facilities Code

1203.1 Design and installation Nonmedical oxygen systems shall be designed and installed in accordance with NFPA 51 and NFPA 55 . NFPA 51-18 (oxygen-fuel gas systems for welding and cutting); NFPA 55-2020 (Compressed Gases and Cryogenic Fluids Code)

The two exceptions to 1202.1 are exam material:

Section 1202.1 does not apply to portable systems or cylinder storage. A rolling E-cylinder cart is not piped medical gas.

Vacuum system exhaust terminations shall comply with the Michigan Mechanical Code. The pipe is plumbing; where the pump discharges to atmosphere is mechanical.

Note the split between 1202 and 1203. Medical oxygen piped to a patient is NFPA 99 work. Nonmedical oxygen - the oxygen manifold feeding a welding shop or a cutting station - is NFPA 51 and NFPA 55 work. Candidates who see "oxygen" and reflexively answer "NFPA 99" get 1203.1 questions wrong.

3. What NFPA 99 Requires of the Installer

Because MPC 1202.1 adopts NFPA 99 by reference, the following become Michigan code requirements for piped medical gas and vacuum:

Tube material and handling

Tube shall be hard-drawn seamless copper conforming to ASTM B819 , medical gas tube , Type L . Type K is required where the operating pressure exceeds a gauge pressure of 185 psi and the pipe size is larger than DN80.

Tube shall be cleaned for oxygen service by the manufacturer before installation, in accordance with the mandatory requirements of CGA G-4.1 .

Each length shall be delivered plugged or capped by the manufacturer and kept sealed until prepared for installation . Opening a bundle of medical gas tube and leaving it uncapped on a jobsite is a contamination failure, not a housekeeping complaint.

Joining

Joints are brazed , and every brazed joint must be made under a continuous flow of oil-free dry nitrogen through the tube. Without the purge, the inside of the copper forms a black cupric-oxide scale that later flakes loose and travels to a patient outlet.

Brazers must be qualified in accordance with ASME Boiler and Pressure Vessel Code, Section IX.

Credentials

  • Role Certification
  • Installer of medical gas and vacuum piping ASSE 6010
  • Inspector witnessing installer tests ASSE 6020
  • Independent verifier who clears the system for patient use ASSE 6030

The verifier must be independent of the installing contractor . A system is not released to patient service on the installer's word.

4. Labeling and Identification

NFPA 99 requires medical gas piping to be labeled with the name of the gas or its chemical symbol and color-coded per CGA Pamphlet C-9 , with labels placed:

  • at intervals of not more than 20 feet ;
  • at least once in or above every room the piping serves or crosses;
  • on both sides of any wall or partition the piping penetrates; and

at least once in every story height traversed by risers.

CGA C-9 / NFPA 99 color and pressure table

  • Gas service Abbreviation Standard gauge pressure Background / text
  • Oxygen O2 50-55 psi Green / white (or white / green)
  • Nitrous oxide N2O 50-55 psi Blue / white
  • Medical air Med Air 50-55 psi Yellow / black
  • Medical-surgical vacuum Med Vac 15 in. to 30 in. HgV White / black
  • Nitrogen N2 160-185 psi Black / white
  • Instrument air - 160-185 psi Red / white
  • Carbon dioxide CO2 50-55 psi Gray / black (or gray / white)
  • Helium He 50-55 psi Brown / white
  • Waste anesthetic gas disposal WAGD Varies with system type Violet / white

Where a system operates at a pressure other than the standard gauge pressure shown, the pressure must be added to the label alongside the gas name.

Exam trap: oxygen and nitrogen are the two most commonly swapped rows. Oxygen is a 50-55 psi , green service. Nitrogen - used as a support gas to drive surgical instruments, not to breathe - is a 160-185 psi , black service, the same pressure band as instrument air.

5. Testing Before a System Serves Patients

NFPA 99 splits testing into installer-performed tests and verification tests.

Test Requirement

Initial blowdown Piping is blown clear with oil-free dry nitrogen to expel debris before component installation.

Initial pressure test Test pressure shall be one and one-half times the system working pressure and not less than a gauge pressure of 150 psi , using oil-free, dry nitrogen .

Cross-connection test Proves that every outlet delivers the gas named on its label and no other.

Piping purge test Removes particulate from the distribution system.

Standing pressure test The system is held for 24 hours at a pressure 20 percent above normal operating line pressure , using oil-free dry nitrogen.

Installer-performed tests must be witnessed by an ASSE 6020 inspector, an ASSE 6030 verifier, or the authority having jurisdiction or its designee .

Why nitrogen and not air? Shop air carries oil and water vapor. Oil in an oxygen-enriched line is an ignition hazard, and moisture corrodes the interior of the tube. Every pressurizing medium in medical gas work is oil-free dry nitrogen , from the brazing purge to the 24-hour standing test.

6. Connecting This to the Rest of Your Michigan Prep

The practical examination. Michigan's hands-on Journey Plumber examination is built around a copper project . Brazing under a nitrogen purge is the highest-discipline version of that same skill set - see Section 16.4 for the copper project and joining methods.

Health care plumbing. Medical gas is the piped-gas half of health care work; MPC Section 609 (Section 5.5) is the potable-water half. A hospital job pulls both in.

Scope questions. If a question contrasts the plumbing code with the mechanical code, the dividing line is MPC 101.2: medical gas is plumbing; fuel gas piping, chilled water for refrigeration, and hot water piping for building heating are mechanical. The only medical-gas item pushed back to the mechanical code is the vacuum exhaust termination in the 1202.1 exception.

Open-book tactic. Chapter 12 is three short paragraphs near the back of the code book, easy to overshoot. Tab it. A question that names NFPA 99, NFPA 51, NFPA 55, an inhalation anesthetic system, or a vacuum piping system is answered on a single page.