Study guide
11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions
Michigan Roofing Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Exam & Michigan Licensing Law
1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules 1.2 Who Must Be Licensed: Residential Builder vs. M&A Roofing & the Exemptions 1.3 Prelicensure Education, Application, Renewal & Continuing Competency 1.4 Company Licenses, Qualifying Officers, Salespersons & Reporting Changes 1.5 Rules of Conduct: Place of Business, Advertising, Written Agreements & Records 1.6 Complaints, Investigations, Hearings, Arbitration & Penalties
2 Chapter 2: Codes, Permits, Civil Rights & Environmental Rules
2.1 The State Construction Code, Permits & Inspections 2.2 Civil Rights, Fair Housing, ADA & Michigan Barrier-Free Design 2.3 EPA Hazardous-Materials Rules: Lead-Safe Renovation, Asbestos & Radon
3 Chapter 3: Business Organization, Contracts & In-Home Sales
3.1 Types of Business Organization: Sole Proprietorship, Partnership, LLC & Corporation 3.2 Contract Essentials: Requirements, Types, Terminology & When a Contract Binds 3.3 Addenda, Change Orders, Allowances, Schedules, Warranties, Financing & Breach 3.4 In-Home Sales: The Home Solicitation Sales Act & Door-to-Door Roofing Sales
4 Chapter 4: Project Management, Accounting, Taxes & Personnel
4.1 Project Management & Administration: Quality, Logistics, Schedules, Draws & Retainage 4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios 4.3 Payroll & Tax Obligations: Federal, Michigan, Unemployment & Sales/Use Tax 4.4 Personnel: MIOSHA Administration, Recordkeeping, Wages, Minors & Benefits
5 Chapter 5: Insurance, Bonds & Construction Liens
5.1 Insurance for Roofing Contractors: Liability, Workers' Compensation, Vehicles, Property & Builders' Risk 5.2 Bonds, Public Works Bonding & the Building Contract Fund Act 5.3 Construction Lien Act I: Notices of Commencement & Furnishing, Sworn Statements & Waivers 5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections
6 Chapter 6: Roofing Safety & Public Protection (MIOSHA)
6.1 MIOSHA Part 45 Fall Protection & Personal Fall Arrest Systems 6.2 Guardrails, Safety Nets, Warning Lines, Safety Monitors, Covers & Fall Protection Plans 6.3 Ladders, Scaffolds, Roof Brackets & Aerial Lifts (MIOSHA Parts 11, 12 & 32) 6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat 6.5 Hoisting & Lift Equipment, Fire Prevention, PPE, Barricades, Debris & Recycling
7 Chapter 7: Planning, Structure & Estimating
7.1 Roof Types, Framing Terminology & Structural Loads 7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System 7.3 Roof Geometry, Slope, Pitch & Slope Factors for Measuring Roofs 7.4 Material Takeoffs: Squares, Bundles, Waste, Underlayment, Ice Barrier, Metals & Fasteners 7.5 Labor, Subcontractor & Access Costs and Preparing the Estimate
8 Chapter 8: Tear-Off, Deck Preparation & Underlayment
8.1 Roof Sheathing: Panel Grades, Spans, Edge Support & Nailing 8.2 Tear-Off vs. Recover, Reroofing Rules & Preparing the Site (MRC R908) 8.3 Michigan's Ice Barrier Requirement: Coverage, Materials & Detailing (R905.1.2) 8.4 Underlayment: Standards, Application by Slope & Attachment (R905.1.1) 8.5 Roof & Ceiling Insulation, Vapor Retarders, Air Sealing & Unvented Assemblies
9 Chapter 9: Steep-Slope Roof Systems
9.1 Asphalt Shingles: Types, ASTM D3462, Wind Classes, Impact & Fire Ratings 9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps 9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys 9.4 Metal Roof Systems, Tile, Slate & Wood Shingles and Shakes
10 Chapter 10: Low-Slope Roof Systems & Drainage
10.1 Single-Ply Membranes: EPDM, TPO & PVC 10.2 Built-Up Roofing & Modified Bitumen: Materials, Application, Kettles & Torch Safety 10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding
11 Chapter 11: Flashings, Transitions & Penetrations
11.1 Drip Edge & Roof-Edge Metals (R905.2.8.5 and R903.2) 11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions 11.3 Chimneys & Crickets, Skylights, Pipes, Flues, Exhaust Vents & Solar
12 Chapter 12: Ventilation, Inspection & Repair
12.1 Attic Ventilation Requirements & Net Free Vent Area Calculations (MRC R806) 12.2 Balanced Airflow, Vent Installation Practice & Preventing Ice Dams 12.3 Roof Inspections, Leak Diagnosis, Repairs & Roofovers
11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions
Key Takeaways Explain This Topic AI
Base flashing against a vertical sidewall may be continuous or step flashing, at least 4 inches high and 4 inches wide, and must direct water away from the wall onto the roof or into the gutter (R905.2.8.3).
Where siding covers the sidewall, the vertical leg of the flashing must be continuous under the siding. Anchored masonry veneer requires counterflashing.
R903.2.1 requires a flashing that diverts water away where the eave of a sloped roof intersects a vertical sidewall, which is the kick-out flashing.
Flashing is required at wall and roof intersections, at every change in roof slope or direction, and around roof openings.
Front-wall (headwall), vent pipe, soil stack, and chimney flashings for asphalt shingles follow the shingle manufacturer's printed instructions (R905.2.8.4).
Last updated: September 2026
The Code Framework
- Section Requirement
- R903.2 Flashing keeps moisture out through joints, permeable materials, and intersections
R903.2.1 Flash wall and roof intersections , changes in roof slope or direction , and roof openings . Divert water away where a sloped roof's eave meets a sidewall. Metal at least 0.019 inch
R905.2.8.1 Base and cap flashing per the manufacturer. Base flashing is 0.019-inch metal or mineral-surfaced roll roofing of at least 77 lb per 100 sq ft. Cap flashing is 0.019-inch metal
R905.2.8.3 Sidewall base flashing: continuous or step, at least 4 inches high and 4 inches wide , directing water onto the roof or into the gutter
R905.2.8.4 Front wall, soil stack, vent pipe, and chimney flashing per the shingle manufacturer's printed instructions
- R703.4 Wall flashing is applied shingle fashion to keep water out of the wall cavity
- Sidewalls With Different Claddings (R905.2.8.3)
Siding: the vertical leg of the base flashing is continuous under the siding .
Anchored masonry veneer (brick or stone): base flashing per this section plus counterflashing .
Exterior plaster or adhered masonry veneer: base flashing per this section and the wall-cladding flashing rules in R703.6.3.
Step Flashing
The 2015 code accepts continuous or step base flashing. Shingle manufacturers generally specify step flashing at sidewalls, because separate pieces woven with each course let the roof and wall move independently and keep water on top of each course. Typical manufacturer practice:
Run the underlayment, and ice barrier where used, a few inches up the wall.
Install each step flashing piece so it laps the piece below and sits on top of the shingle course below. It is covered by the next shingle course.
Nail each piece to the roof deck only , near the top edge where the next course covers it. Do not nail into the wall.
Pieces must be at least 4 × 4 inches (R905.2.8.3). Long enough to lap the piece below by the manufacturer's minimum.
The water-resistive barrier (house wrap or felt) laps over the vertical legs, and the siding covers them. Keep siding a small distance off the shingles so it does not wick water, following the siding maker's clearance.
Kick-Out (Diverter) Flashing
Where a roof eave dies into a sidewall that continues past it, such as a garage roof against a two-story wall, water running down the step flashing reaches the wall at the eave. Without a diverter, it runs behind the siding and rots the wall. R903.2.1 requires a flashing that diverts water away at that point:
Install a kick-out at the bottom of the sidewall step flashing, before the siding goes on, so it throws water out into the gutter or away from the wall.
Seal and lap the WRB over its upper flange, as the kick-out manufacturer directs.
One-piece molded or soldered kick-outs resist leaking better than field-bent ones.
Headwall (Front Wall) Flashing
Where a roof slope runs up to a wall, as at the top of a porch roof against a house:
Install a continuous apron flashing over the top shingle course, with a vertical leg up the wall and a horizontal flange out over the shingles, per the manufacturer (R905.2.8.4).
The WRB and siding lap over the vertical leg. At masonry, add counterflashing.
At the corners where a headwall meets a sidewall, wrap the apron around and integrate the step flashing, so no raw joint faces uphill.
Counterflashing at Masonry
Base flashing against brick or stone needs counterflashing (cap flashing) over its top edge:
Reglet (cut-in) method: cut a groove into a mortar joint, insert the bent edge of the counterflashing, wedge it, and seal it with an appropriate sealant. On sloped walls, step the counterflashing to follow the mortar courses.
Surface-mounted: a termination bar or surface counterflashing with a sealant lip, fastened to the masonry. It depends on sealant maintenance.
The counterflashing laps over the base flashing so water cannot get behind it, while the two pieces can still move separately.
Cap flashing is corrosion-resistant metal at least 0.019 inch thick (R905.2.8.1).
Changes in Slope, Curbs, and Platforms
PSI's outline includes "install roof-to-wall transitions, curbs, other platforms, and pitch transitions." Flash all of these under R903.2.1:
Pitch transitions (for example, from 12:12 to 4:12 on a gambrel, or a shingled slope meeting a low-slope porch): use metal transition flashing, or run underlayment and membrane continuously across the break so the upper material laps the lower. Follow the shingle and membrane manufacturers' instructions for the break.
Curbs (skylights, hatches, HVAC): build curbs high enough to flash, and wrap them with underlayment or membrane. Install base flashing and counterflashing or the unit's flashing kit (Section 11.3).
Platforms and decks on roofs: support them on flashed curbs or sleepers so water drains under them, and keep the roof membrane continuous.
Diagnosing Wall Leaks
Stains below a sidewall's lower end: usually a missing kick-out.
Leaks along a sidewall: often step flashing lapped backward, nailed through the wall leg, siding down on the shingles, or a WRB behind the flashing instead of over it.
Leaks at a headwall: often missing apron flashing or siding that is not lapped over it.