Study guide

5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections

Michigan Roofing Contractor Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: The Exam & Michigan Licensing Law

1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules 1.2 Who Must Be Licensed: Residential Builder vs. M&A Roofing & the Exemptions 1.3 Prelicensure Education, Application, Renewal & Continuing Competency 1.4 Company Licenses, Qualifying Officers, Salespersons & Reporting Changes 1.5 Rules of Conduct: Place of Business, Advertising, Written Agreements & Records 1.6 Complaints, Investigations, Hearings, Arbitration & Penalties

2 Chapter 2: Codes, Permits, Civil Rights & Environmental Rules

2.1 The State Construction Code, Permits & Inspections 2.2 Civil Rights, Fair Housing, ADA & Michigan Barrier-Free Design 2.3 EPA Hazardous-Materials Rules: Lead-Safe Renovation, Asbestos & Radon

3 Chapter 3: Business Organization, Contracts & In-Home Sales

3.1 Types of Business Organization: Sole Proprietorship, Partnership, LLC & Corporation 3.2 Contract Essentials: Requirements, Types, Terminology & When a Contract Binds 3.3 Addenda, Change Orders, Allowances, Schedules, Warranties, Financing & Breach 3.4 In-Home Sales: The Home Solicitation Sales Act & Door-to-Door Roofing Sales

4 Chapter 4: Project Management, Accounting, Taxes & Personnel

4.1 Project Management & Administration: Quality, Logistics, Schedules, Draws & Retainage 4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios 4.3 Payroll & Tax Obligations: Federal, Michigan, Unemployment & Sales/Use Tax 4.4 Personnel: MIOSHA Administration, Recordkeeping, Wages, Minors & Benefits

5 Chapter 5: Insurance, Bonds & Construction Liens

5.1 Insurance for Roofing Contractors: Liability, Workers' Compensation, Vehicles, Property & Builders' Risk 5.2 Bonds, Public Works Bonding & the Building Contract Fund Act 5.3 Construction Lien Act I: Notices of Commencement & Furnishing, Sworn Statements & Waivers 5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections

6 Chapter 6: Roofing Safety & Public Protection (MIOSHA)

6.1 MIOSHA Part 45 Fall Protection & Personal Fall Arrest Systems 6.2 Guardrails, Safety Nets, Warning Lines, Safety Monitors, Covers & Fall Protection Plans 6.3 Ladders, Scaffolds, Roof Brackets & Aerial Lifts (MIOSHA Parts 11, 12 & 32) 6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat 6.5 Hoisting & Lift Equipment, Fire Prevention, PPE, Barricades, Debris & Recycling

7 Chapter 7: Planning, Structure & Estimating

7.1 Roof Types, Framing Terminology & Structural Loads 7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System 7.3 Roof Geometry, Slope, Pitch & Slope Factors for Measuring Roofs 7.4 Material Takeoffs: Squares, Bundles, Waste, Underlayment, Ice Barrier, Metals & Fasteners 7.5 Labor, Subcontractor & Access Costs and Preparing the Estimate

8 Chapter 8: Tear-Off, Deck Preparation & Underlayment

8.1 Roof Sheathing: Panel Grades, Spans, Edge Support & Nailing 8.2 Tear-Off vs. Recover, Reroofing Rules & Preparing the Site (MRC R908) 8.3 Michigan's Ice Barrier Requirement: Coverage, Materials & Detailing (R905.1.2) 8.4 Underlayment: Standards, Application by Slope & Attachment (R905.1.1) 8.5 Roof & Ceiling Insulation, Vapor Retarders, Air Sealing & Unvented Assemblies

9 Chapter 9: Steep-Slope Roof Systems

9.1 Asphalt Shingles: Types, ASTM D3462, Wind Classes, Impact & Fire Ratings 9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps 9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys 9.4 Metal Roof Systems, Tile, Slate & Wood Shingles and Shakes

10 Chapter 10: Low-Slope Roof Systems & Drainage

10.1 Single-Ply Membranes: EPDM, TPO & PVC 10.2 Built-Up Roofing & Modified Bitumen: Materials, Application, Kettles & Torch Safety 10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding

11 Chapter 11: Flashings, Transitions & Penetrations

11.1 Drip Edge & Roof-Edge Metals (R905.2.8.5 and R903.2) 11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions 11.3 Chimneys & Crickets, Skylights, Pipes, Flues, Exhaust Vents & Solar

12 Chapter 12: Ventilation, Inspection & Repair

12.1 Attic Ventilation Requirements & Net Free Vent Area Calculations (MRC R806) 12.2 Balanced Airflow, Vent Installation Practice & Preventing Ice Dams 12.3 Roof Inspections, Leak Diagnosis, Repairs & Roofovers

5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections

Key Takeaways Explain This Topic AI

A claim of lien must be recorded with the register of deeds in each county where the property is located within 90 days after the claimant's last furnishing of labor or material under its contract.

Within 15 days after recording, the claimant must serve a copy of the claim of lien, and any proof of service, on the designee, personally or by certified mail with return receipt requested.

An action to enforce a construction lien by foreclosure must be brought in circuit court no later than 1 year after the claim of lien was recorded, with a notice of lis pendens recorded when the action starts.

A construction lien arises at the first actual physical improvement and has priority over interests recorded after that. A mortgage recorded earlier has priority.

The Homeowner Construction Lien Recovery Fund was repealed by 2010 PA 147, and a person not licensed under Article 24 may not impose a lien for licensed work.

Last updated: September 2026

Recording the Claim of Lien (MCL 570.1111)

A construction lien ceases to exist unless, within 90 days after the claimant's last furnishing of labor or material under its contract, a claim of lien is recorded with the register of deeds in each county where the property is located. A claim recorded in one county covers only property in that county.

The statutory claim of lien form states when the claimant first and last furnished labor or material, the legal description, the owner's name, the contract amount including extras, payments received, and the amount claimed. It must be sworn before a notary. A subcontractor, supplier, or laborer attaches proof of service of its notice of furnishing .

Service: Within 15 days after recording , the claimant serves a copy of the claim of lien, and any recorded proof of service, on the designee named in the notice of commencement, or on the owner if no designee is named. Service is personal or by certified mail, return receipt requested , and mail service is complete on mailing. Proof of this service is attached to any foreclosure complaint.

Counting the 90 Days

Day 0 is the last day the claimant furnished labor or material under its contract. Recording on day 90 is on time. Recording on day 91 is too late. Plan for the last day of contract work. A return visit only to fix a defect or honor a warranty is risky to rely on for extending the deadline. Don't wait for a warranty call to decide whether to lien.

Foreclosing the Lien (MCL 570.1117–1118)

Deadline: foreclosure proceedings must be brought no later than 1 year after the claim of lien was recorded .

Lis pendens: when the action starts, the plaintiff records a notice of lis pendens with the register of deeds.

Court: the circuit court for the county where the property is located. The action is equitable. Everyone with an interest in the property that the foreclosure would affect must be made a party.

Sworn statement proof: a contractor or subcontractor must show that the owner was given a sworn statement if one was requested or required (MCL 570.1117(7)).

Attorney fees: the court may award reasonable attorney fees to a lien claimant who is the prevailing party, and to a prevailing defendant if the lien action was vexatious .

The claimant may also sue on the underlying contract in the same action.

Loading diagram... Construction Lien Deadlines From First to Last Furnishing

Priority (MCL 570.1119)

Construction liens among lien claimants have equal priority .

A construction lien arises at the first actual physical improvement . It has priority over interests, liens, and encumbrances recorded after it arises, and over garnishments made after it arises.

A mortgage recorded before the lien arises has priority. Construction-loan advances made after the lien arises keep priority only if the lender followed the sworn statement and waiver process.

Protections for Residential Owners

Written contract and license statement. A contractor has no lien on a residential structure without a written contract, written amendments, and the licensing statement with its license number (MCL 570.1114).

Payment cap. The total of all liens cannot exceed the contract price, as amended, minus payments the owner made under sworn statements or waivers (MCL 570.1107(6)).

Waiver verification before relying on third-party waivers (MCL 570.1115(7)).

Interest limit. A subcontractor's or supplier's lien on a residential structure may include interest only as its contract allows, and not interest accruing more than 90 days after the claim is recorded (MCL 570.1107(7)).

Remedial construction. The Act is construed liberally, and substantial compliance is enough for a valid lien (MCL 570.1302).

The Repealed Recovery Fund

The Act once included a Homeowner Construction Lien Recovery Fund that paid subcontractor liens on homes whose owners had paid in full. 2010 PA 147 repealed those sections (MCL 570.1201–1207), effective August 23, 2010 , and LARA lists the fund as abolished. Today, owners protect themselves through sworn statements, waivers, and the payment cap.

Liens and Licensing

A person not licensed under Article 24 during the work may not impose or take any action to impose a lien on real property for work that required a license (MCL 339.2412(3)). The same person also cannot sue for payment (MCL 339.2412(1)).

A lapsed license counts as no license (MCL 339.601(3)), so renew on time.

Worked Timeline

A roofer finishes a reroof on August 10 , which is the last day of contract work. The owner does not pay the $4,800 balance.

Last day to record the claim of lien: November 8 (90 days after August 10).

If recorded November 1, serve the designee by November 16 (15 days).

File foreclosure and record lis pendens by November 1 of the following year (1 year after recording).