Study guide

10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding

Michigan Roofing Contractor Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: The Exam & Michigan Licensing Law

1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules 1.2 Who Must Be Licensed: Residential Builder vs. M&A Roofing & the Exemptions 1.3 Prelicensure Education, Application, Renewal & Continuing Competency 1.4 Company Licenses, Qualifying Officers, Salespersons & Reporting Changes 1.5 Rules of Conduct: Place of Business, Advertising, Written Agreements & Records 1.6 Complaints, Investigations, Hearings, Arbitration & Penalties

2 Chapter 2: Codes, Permits, Civil Rights & Environmental Rules

2.1 The State Construction Code, Permits & Inspections 2.2 Civil Rights, Fair Housing, ADA & Michigan Barrier-Free Design 2.3 EPA Hazardous-Materials Rules: Lead-Safe Renovation, Asbestos & Radon

3 Chapter 3: Business Organization, Contracts & In-Home Sales

3.1 Types of Business Organization: Sole Proprietorship, Partnership, LLC & Corporation 3.2 Contract Essentials: Requirements, Types, Terminology & When a Contract Binds 3.3 Addenda, Change Orders, Allowances, Schedules, Warranties, Financing & Breach 3.4 In-Home Sales: The Home Solicitation Sales Act & Door-to-Door Roofing Sales

4 Chapter 4: Project Management, Accounting, Taxes & Personnel

4.1 Project Management & Administration: Quality, Logistics, Schedules, Draws & Retainage 4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios 4.3 Payroll & Tax Obligations: Federal, Michigan, Unemployment & Sales/Use Tax 4.4 Personnel: MIOSHA Administration, Recordkeeping, Wages, Minors & Benefits

5 Chapter 5: Insurance, Bonds & Construction Liens

5.1 Insurance for Roofing Contractors: Liability, Workers' Compensation, Vehicles, Property & Builders' Risk 5.2 Bonds, Public Works Bonding & the Building Contract Fund Act 5.3 Construction Lien Act I: Notices of Commencement & Furnishing, Sworn Statements & Waivers 5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections

6 Chapter 6: Roofing Safety & Public Protection (MIOSHA)

6.1 MIOSHA Part 45 Fall Protection & Personal Fall Arrest Systems 6.2 Guardrails, Safety Nets, Warning Lines, Safety Monitors, Covers & Fall Protection Plans 6.3 Ladders, Scaffolds, Roof Brackets & Aerial Lifts (MIOSHA Parts 11, 12 & 32) 6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat 6.5 Hoisting & Lift Equipment, Fire Prevention, PPE, Barricades, Debris & Recycling

7 Chapter 7: Planning, Structure & Estimating

7.1 Roof Types, Framing Terminology & Structural Loads 7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System 7.3 Roof Geometry, Slope, Pitch & Slope Factors for Measuring Roofs 7.4 Material Takeoffs: Squares, Bundles, Waste, Underlayment, Ice Barrier, Metals & Fasteners 7.5 Labor, Subcontractor & Access Costs and Preparing the Estimate

8 Chapter 8: Tear-Off, Deck Preparation & Underlayment

8.1 Roof Sheathing: Panel Grades, Spans, Edge Support & Nailing 8.2 Tear-Off vs. Recover, Reroofing Rules & Preparing the Site (MRC R908) 8.3 Michigan's Ice Barrier Requirement: Coverage, Materials & Detailing (R905.1.2) 8.4 Underlayment: Standards, Application by Slope & Attachment (R905.1.1) 8.5 Roof & Ceiling Insulation, Vapor Retarders, Air Sealing & Unvented Assemblies

9 Chapter 9: Steep-Slope Roof Systems

9.1 Asphalt Shingles: Types, ASTM D3462, Wind Classes, Impact & Fire Ratings 9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps 9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys 9.4 Metal Roof Systems, Tile, Slate & Wood Shingles and Shakes

10 Chapter 10: Low-Slope Roof Systems & Drainage

10.1 Single-Ply Membranes: EPDM, TPO & PVC 10.2 Built-Up Roofing & Modified Bitumen: Materials, Application, Kettles & Torch Safety 10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding

11 Chapter 11: Flashings, Transitions & Penetrations

11.1 Drip Edge & Roof-Edge Metals (R905.2.8.5 and R903.2) 11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions 11.3 Chimneys & Crickets, Skylights, Pipes, Flues, Exhaust Vents & Solar

12 Chapter 12: Ventilation, Inspection & Repair

12.1 Attic Ventilation Requirements & Net Free Vent Area Calculations (MRC R806) 12.2 Balanced Airflow, Vent Installation Practice & Preventing Ice Dams 12.3 Roof Inspections, Leak Diagnosis, Repairs & Roofovers

10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding

Key Takeaways Explain This Topic AI

Unless a roof is sloped to drain over its edges, roof drains must be installed at each low point (R903.4).

Where parapets or raised perimeters would trap water, secondary overflow drains or scuppers are required. Overflow drains are the same size as the roof drains, with the inlet 2 inches above the low point of the roof.

Overflow scuppers must be three times the size of the roof drains, have an opening at least 4 inches high, and have the inlet 2 inches above the low point, and overflow drains may not connect to the roof drain lines.

Positive roof drainage means the roof drains within 48 hours of precipitation, allowing for deck deflection.

When an existing roof already has positive drainage, reroofing does not require adding slope to meet 1/4:12 or adding secondary overflow drains or scuppers (R908.1).

Last updated: September 2026

Why Drainage Matters

Standing water adds weight, about 5.2 psf per inch of depth , since water weighs 62.4 pounds per cubic foot. It speeds membrane aging, leaks through any small defect, and freezes and expands in Michigan winters. As a flat roof deflects, it collects more water, and deflection increases. On a roof with parapets, clogged drains can trap enough water to overload the structure.

Code Rules (2015 MRC)

Rule Requirement

Membrane slope BUR, modified bitumen, single-ply, spray foam, and liquid-applied roofs need a design slope of at least 1/4:12 . Coal-tar BUR may use 1/8:12 (R905.9–R905.15)

Positive roof drainage (definition) Loading deflections of the deck are considered, and additional slope is provided so the roof drains within 48 hours of precipitation

Roof drains (R903.4) Unless roofs are sloped to drain over roof edges , roof drains are installed at each low point

Secondary (emergency overflow) (R903.4.1) Where roof drains are required and the perimeter extends above the roof so water would be trapped if the primary drains back up, provide overflow drains or scuppers

Overflow drains Same size as the roof drains, with the inlet flow line 2 inches above the low point of the roof

Overflow scuppers Three times the size of the roof drains, with a minimum opening height of 4 inches , in the adjacent parapet, with the inlet 2 inches above the low point

Piping Sized per the plumbing code (IPC Sections 1106 and 1108). Overflow drains discharge to an approved location and are not connected to roof drain lines

Reroofing (R908.1) Existing roofs with positive drainage need not meet the 1/4:12 minimum, and need not have secondary drains or scuppers added

Installing a Roof Drain

Set the drain body at the low point, recessed if possible into a sump (a slight depression in the insulation or deck) so water enters the drain before it can pond around it. Secure it to the deck with the manufacturer's clamp or underdeck ring.

Strip in the membrane: extend the membrane over the drain bowl, set it in the manufacturer's sealant or mastic, and clamp it with the clamping ring , tightening bolts evenly. Cut the membrane to the drain opening without cutting under the clamp. Thermoplastic systems may use a weldable drain insert.

Install the strainer or dome to keep debris out.

Test by running water to the drain and confirming the connection below does not leak.

Scuppers and Edges

A scupper is an opening through a parapet or raised edge. Line it with a metal sleeve flashed into the membrane, and discharge into a conductor head and downspout, or away from the wall.

For roofs that drain over the edge , use a gravel stop or drip edge and a gutter sized for the area. Keep the membrane stripped in over the edge metal.

Correcting Ponding

Tool How it helps

Tapered insulation Factory-sloped boards (commonly 1/8 or 1/4 inch per foot) create slope to drains on flat decks

Crickets and saddles Small sloped areas between drains, behind curbs, or at parapets that divert water toward drains or scuppers. Crickets are usually built steeper than the field so the valley lines where they meet the field still drain

  • Additional drains or relocated scuppers Add outlets at persistent low spots
  • Structural correction Sagging joists or beams need a structural fix first. Adding insulation only adds weight

Before reroofing a ponding roof, find the low spots with a level or laser, and design the tapered layout toward drains. Replace wet insulation. Remember R908.1's exception applies only when the existing roof already provides positive drainage. A roof that ponds should be corrected.

Where Low Slope Meets Steep Slope

On houses, the most common low-slope leaks happen at transitions, where a porch roof meets a shingled roof or a flat dormer roof meets the main slope:

Run the membrane up the steeper slope under the shingle underlayment and ice barrier far enough to stay above any water that backs up.

Flash pitch transitions with metal or membrane per the manufacturers' instructions, and flash wherever there is a change in roof slope or direction (R903.2.1).

Keep shingles off slopes under 2:12. Use a membrane there instead (R905.2.2).

Worked Example

A 20-by-30-foot flat porch roof has a parapet on three sides and one interior drain. Parapets trap water, so R903.4.1 requires a secondary overflow . The options are an overflow drain the same size as the primary drain with its inlet 2 inches above the low point, or an overflow scupper three times the drain size with an opening at least 4 inches high and its inlet 2 inches above the low point. Any overflow drain must run on separate piping to an approved discharge location, not tied into the primary drain line.