Study guide
4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios
Michigan Roofing Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Exam & Michigan Licensing Law
1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules 1.2 Who Must Be Licensed: Residential Builder vs. M&A Roofing & the Exemptions 1.3 Prelicensure Education, Application, Renewal & Continuing Competency 1.4 Company Licenses, Qualifying Officers, Salespersons & Reporting Changes 1.5 Rules of Conduct: Place of Business, Advertising, Written Agreements & Records 1.6 Complaints, Investigations, Hearings, Arbitration & Penalties
2 Chapter 2: Codes, Permits, Civil Rights & Environmental Rules
2.1 The State Construction Code, Permits & Inspections 2.2 Civil Rights, Fair Housing, ADA & Michigan Barrier-Free Design 2.3 EPA Hazardous-Materials Rules: Lead-Safe Renovation, Asbestos & Radon
3 Chapter 3: Business Organization, Contracts & In-Home Sales
3.1 Types of Business Organization: Sole Proprietorship, Partnership, LLC & Corporation 3.2 Contract Essentials: Requirements, Types, Terminology & When a Contract Binds 3.3 Addenda, Change Orders, Allowances, Schedules, Warranties, Financing & Breach 3.4 In-Home Sales: The Home Solicitation Sales Act & Door-to-Door Roofing Sales
4 Chapter 4: Project Management, Accounting, Taxes & Personnel
4.1 Project Management & Administration: Quality, Logistics, Schedules, Draws & Retainage 4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios 4.3 Payroll & Tax Obligations: Federal, Michigan, Unemployment & Sales/Use Tax 4.4 Personnel: MIOSHA Administration, Recordkeeping, Wages, Minors & Benefits
5 Chapter 5: Insurance, Bonds & Construction Liens
5.1 Insurance for Roofing Contractors: Liability, Workers' Compensation, Vehicles, Property & Builders' Risk 5.2 Bonds, Public Works Bonding & the Building Contract Fund Act 5.3 Construction Lien Act I: Notices of Commencement & Furnishing, Sworn Statements & Waivers 5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections
6 Chapter 6: Roofing Safety & Public Protection (MIOSHA)
6.1 MIOSHA Part 45 Fall Protection & Personal Fall Arrest Systems 6.2 Guardrails, Safety Nets, Warning Lines, Safety Monitors, Covers & Fall Protection Plans 6.3 Ladders, Scaffolds, Roof Brackets & Aerial Lifts (MIOSHA Parts 11, 12 & 32) 6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat 6.5 Hoisting & Lift Equipment, Fire Prevention, PPE, Barricades, Debris & Recycling
7 Chapter 7: Planning, Structure & Estimating
7.1 Roof Types, Framing Terminology & Structural Loads 7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System 7.3 Roof Geometry, Slope, Pitch & Slope Factors for Measuring Roofs 7.4 Material Takeoffs: Squares, Bundles, Waste, Underlayment, Ice Barrier, Metals & Fasteners 7.5 Labor, Subcontractor & Access Costs and Preparing the Estimate
8 Chapter 8: Tear-Off, Deck Preparation & Underlayment
8.1 Roof Sheathing: Panel Grades, Spans, Edge Support & Nailing 8.2 Tear-Off vs. Recover, Reroofing Rules & Preparing the Site (MRC R908) 8.3 Michigan's Ice Barrier Requirement: Coverage, Materials & Detailing (R905.1.2) 8.4 Underlayment: Standards, Application by Slope & Attachment (R905.1.1) 8.5 Roof & Ceiling Insulation, Vapor Retarders, Air Sealing & Unvented Assemblies
9 Chapter 9: Steep-Slope Roof Systems
9.1 Asphalt Shingles: Types, ASTM D3462, Wind Classes, Impact & Fire Ratings 9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps 9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys 9.4 Metal Roof Systems, Tile, Slate & Wood Shingles and Shakes
10 Chapter 10: Low-Slope Roof Systems & Drainage
10.1 Single-Ply Membranes: EPDM, TPO & PVC 10.2 Built-Up Roofing & Modified Bitumen: Materials, Application, Kettles & Torch Safety 10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding
11 Chapter 11: Flashings, Transitions & Penetrations
11.1 Drip Edge & Roof-Edge Metals (R905.2.8.5 and R903.2) 11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions 11.3 Chimneys & Crickets, Skylights, Pipes, Flues, Exhaust Vents & Solar
12 Chapter 12: Ventilation, Inspection & Repair
12.1 Attic Ventilation Requirements & Net Free Vent Area Calculations (MRC R806) 12.2 Balanced Airflow, Vent Installation Practice & Preventing Ice Dams 12.3 Roof Inspections, Leak Diagnosis, Repairs & Roofovers
4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios
Key Takeaways Explain This Topic AI
The balance sheet follows the equation Assets = Liabilities + Owner's Equity and shows the business at one point in time.
The income statement reports revenue minus costs and expenses over a period, showing gross profit and net income.
The current ratio equals current assets divided by current liabilities, and working capital equals current assets minus current liabilities.
Markup is profit divided by cost, and margin is profit divided by selling price, so a 25% margin requires dividing cost by 0.75.
A profitable company can still run out of cash when receivables are slow, which makes deposits, progress billing, and collection policies part of financial management.
Last updated: September 2026
Costs and Expenses
Category Definition Roofing examples
Direct job costs Costs caused by a specific job Shingles, underlayment, flashing, field labor and labor burden, dumpster, permit, subcontractors
Indirect (overhead) costs Costs of running the business Office rent, estimator salary, vehicles, insurance, licensing, advertising
- Fixed costs Stay the same regardless of volume Rent, loan payments
- Variable costs Rise with volume Materials, hourly labor
Labor burden is the added cost of each labor dollar: employer FICA, federal and state unemployment tax, workers' compensation premiums, and benefits. Roofing workers' compensation rates are high, so include burden in every labor estimate.
Markup vs. Margin
Markup = Profit Cost Margin = Profit Selling price \text{Markup} = \frac{\text{Profit}}{\text{Cost}} \qquad \text{Margin} = \frac{\text{Profit}}{\text{Selling price}} Markup = Cost Profit Margin = Selling price Profit
To reach a target margin, divide cost by (1 minus the margin):
Selling price = Cost 1 − margin \text{Selling price} = \frac{\text{Cost}}{1 - \text{margin}} Selling price = 1 − margin Cost
Example: Cost $12,000, target margin 25%. Selling price = $12,000 ÷ 0.75 = $16,000. Profit is $4,000, which is a 25% margin and a 33.3% markup. Marking up $12,000 by 25% gives only $15,000, a 20% margin.
Sales and Accounts Receivable
Accounts receivable (AR) is money customers owe for work already billed. Manage it by:
- billing promptly at each milestone;
- aging receivables (current, 30, 60, 90+ days) and following up on each bucket;
- collecting sworn statements and waivers so owners have no reason to withhold payment (MCL 570.1110);
tracking lien deadlines, because a claim of lien must be recorded within 90 days after last furnishing (Section 5.4).
Days sales outstanding = (accounts receivable ÷ annual sales) × 365 estimates how fast you collect.
Cash Flow
Cash flow is the timing of cash in and out. A contractor can be profitable on paper and still unable to pay suppliers because the money arrives after the bills are due. Tools include:
- deposits and progress billing that match material purchases;
- a cash flow forecast by week during the busy season;
- a line of credit for seasonal gaps, since Michigan winters slow roofing;
supplier terms such as "2/10 net 30," meaning a 2% discount if paid within 10 days, otherwise due in 30.
The statement of cash flows groups cash movement into operating, investing (equipment purchases), and financing (loans, owner contributions and draws) activities.
The Balance Sheet
The balance sheet shows the business on a single date:
Assets = Liabilities + Owner’s equity \text{Assets} = \text{Liabilities} + \text{Owner's equity} Assets = Liabilities + Owner’s equity
Assets Liabilities and equity
Current: cash, accounts receivable, inventory, retainage receivable Current: accounts payable, accrued payroll, current portion of loans, retainage payable
- Long-term: trucks, trailers, equipment (net of depreciation) Long-term: equipment loans
- Owner's equity: capital plus retained earnings
"Current" means convertible to cash, or due, within one year.
The Income Statement
The income statement covers a period (a month, quarter, or year):
- Line Example
- Revenue (contract income) $900,000
- Minus cost of revenue (direct job costs) $630,000
- Gross profit $270,000 (30% gross margin)
- Minus operating expenses (overhead) $198,000
- Net income before tax $72,000 (8% net margin)
Contractors may recognize revenue on the completed-contract or percentage-of-completion method for longer jobs. Many small residential roofers use cash or accrual accounting on short jobs. Accrual records revenue when earned and expenses when incurred. Cash records them when money changes hands.
Key Ratios
Ratio Formula What it tells you
Current ratio Current assets ÷ current liabilities Short-term ability to pay. Above 1.0 means more current assets than current debts
Quick (acid-test) ratio (Cash + receivables) ÷ current liabilities Liquidity without inventory
Working capital Current assets − current liabilities A dollar cushion for operations. Sureties watch it closely
- Debt-to-equity Total liabilities ÷ owner's equity Leverage. Higher means more borrowed risk
- Gross profit margin Gross profit ÷ revenue Job pricing and cost control
- Net profit margin Net income ÷ revenue Overall profitability after overhead
Worked example: Current assets are $180,000 (cash $40,000, receivables $110,000, inventory $30,000). Current liabilities are $120,000. Total liabilities are $150,000, and equity is $100,000.
- Current ratio = 180,000 ÷ 120,000 = 1.5
- Quick ratio = (40,000 + 110,000) ÷ 120,000 = 1.25
- Working capital = 180,000 − 120,000 = $60,000
- Debt-to-equity = 150,000 ÷ 100,000 = 1.5
- Records Michigan Requires
A builder or contractor must keep a complete, accurate set of books and records (R 338.1534). LARA may demand a sworn financial statement within 30 days after an unsatisfied judgment or lien, or when it doubts the licensee's finances (R 338.1535). Money received for a specific project is held in trust for the people who supply that project under the Building Contract Fund Act (Section 5.2). Your books should show that each job's receipts paid that job's labor and suppliers first.