Study guide
1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules
Michigan Roofing Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Exam & Michigan Licensing Law
1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules 1.2 Who Must Be Licensed: Residential Builder vs. M&A Roofing & the Exemptions 1.3 Prelicensure Education, Application, Renewal & Continuing Competency 1.4 Company Licenses, Qualifying Officers, Salespersons & Reporting Changes 1.5 Rules of Conduct: Place of Business, Advertising, Written Agreements & Records 1.6 Complaints, Investigations, Hearings, Arbitration & Penalties
2 Chapter 2: Codes, Permits, Civil Rights & Environmental Rules
2.1 The State Construction Code, Permits & Inspections 2.2 Civil Rights, Fair Housing, ADA & Michigan Barrier-Free Design 2.3 EPA Hazardous-Materials Rules: Lead-Safe Renovation, Asbestos & Radon
3 Chapter 3: Business Organization, Contracts & In-Home Sales
3.1 Types of Business Organization: Sole Proprietorship, Partnership, LLC & Corporation 3.2 Contract Essentials: Requirements, Types, Terminology & When a Contract Binds 3.3 Addenda, Change Orders, Allowances, Schedules, Warranties, Financing & Breach 3.4 In-Home Sales: The Home Solicitation Sales Act & Door-to-Door Roofing Sales
4 Chapter 4: Project Management, Accounting, Taxes & Personnel
4.1 Project Management & Administration: Quality, Logistics, Schedules, Draws & Retainage 4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios 4.3 Payroll & Tax Obligations: Federal, Michigan, Unemployment & Sales/Use Tax 4.4 Personnel: MIOSHA Administration, Recordkeeping, Wages, Minors & Benefits
5 Chapter 5: Insurance, Bonds & Construction Liens
5.1 Insurance for Roofing Contractors: Liability, Workers' Compensation, Vehicles, Property & Builders' Risk 5.2 Bonds, Public Works Bonding & the Building Contract Fund Act 5.3 Construction Lien Act I: Notices of Commencement & Furnishing, Sworn Statements & Waivers 5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections
6 Chapter 6: Roofing Safety & Public Protection (MIOSHA)
6.1 MIOSHA Part 45 Fall Protection & Personal Fall Arrest Systems 6.2 Guardrails, Safety Nets, Warning Lines, Safety Monitors, Covers & Fall Protection Plans 6.3 Ladders, Scaffolds, Roof Brackets & Aerial Lifts (MIOSHA Parts 11, 12 & 32) 6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat 6.5 Hoisting & Lift Equipment, Fire Prevention, PPE, Barricades, Debris & Recycling
7 Chapter 7: Planning, Structure & Estimating
7.1 Roof Types, Framing Terminology & Structural Loads 7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System 7.3 Roof Geometry, Slope, Pitch & Slope Factors for Measuring Roofs 7.4 Material Takeoffs: Squares, Bundles, Waste, Underlayment, Ice Barrier, Metals & Fasteners 7.5 Labor, Subcontractor & Access Costs and Preparing the Estimate
8 Chapter 8: Tear-Off, Deck Preparation & Underlayment
8.1 Roof Sheathing: Panel Grades, Spans, Edge Support & Nailing 8.2 Tear-Off vs. Recover, Reroofing Rules & Preparing the Site (MRC R908) 8.3 Michigan's Ice Barrier Requirement: Coverage, Materials & Detailing (R905.1.2) 8.4 Underlayment: Standards, Application by Slope & Attachment (R905.1.1) 8.5 Roof & Ceiling Insulation, Vapor Retarders, Air Sealing & Unvented Assemblies
9 Chapter 9: Steep-Slope Roof Systems
9.1 Asphalt Shingles: Types, ASTM D3462, Wind Classes, Impact & Fire Ratings 9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps 9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys 9.4 Metal Roof Systems, Tile, Slate & Wood Shingles and Shakes
10 Chapter 10: Low-Slope Roof Systems & Drainage
10.1 Single-Ply Membranes: EPDM, TPO & PVC 10.2 Built-Up Roofing & Modified Bitumen: Materials, Application, Kettles & Torch Safety 10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding
11 Chapter 11: Flashings, Transitions & Penetrations
11.1 Drip Edge & Roof-Edge Metals (R905.2.8.5 and R903.2) 11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions 11.3 Chimneys & Crickets, Skylights, Pipes, Flues, Exhaust Vents & Solar
12 Chapter 12: Ventilation, Inspection & Repair
12.1 Attic Ventilation Requirements & Net Free Vent Area Calculations (MRC R806) 12.2 Balanced Airflow, Vent Installation Practice & Preventing Ice Dams 12.3 Roof Inspections, Leak Diagnosis, Repairs & Roofovers
1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules
Key Takeaways Explain This Topic AI
The M&A Roofing exam has 100 scored questions (50 Business and Law plus 50 roofing trade) and requires 72 correct answers in 135 minutes.
PSI charges $70 for one M&A trade-and-law combination, $99 for two, and $114 for three, and the same fees apply to retests.
Since November 14, 2019, the Business and Law part and the trade part are combined, so candidates cannot test for either part separately.
The exam is closed book, and PSI may add up to 10 unidentified, unscored experimental questions that do not reduce the examination time.
All licensure requirements, including the exam, must be finished within 1 year after LARA receives the application, and a passing score is valid for 1 year.
Last updated: September 2026
Which Exam You Are Taking
Michigan licenses residential contractors under Article 24 of the Occupational Code (1980 PA 299) . The Department of Licensing and Regulatory Affairs ( LARA ), Bureau of Construction Codes, issues two kinds of licenses: the Residential Builder license and the Maintenance & Alteration (M&A) Contractor license. Roofing is one of the M&A trades. A roofer who wants to contract directly with homeowners usually earns an M&A license with the roofing trade listed on it.
PSI Services administers the exams for LARA. The current PSI Candidate Information Bulletin (updated August 3, 2026) combines each M&A trade exam with the Business and Law section. You sit for both parts in one appointment and receive one result.
- Item M&A Roofing (this guide) Residential Builder (for comparison)
- Scored questions 100 (50 Business and Law + 50 roofing) 160 (50 Business and Law + 110 practice/trade)
- Passing raw score 72 correct 116 correct
- Time limit 135 minutes (270 minutes for two trades) 240 minutes
- PSI fee $70 one trade; $99 two; $114 three $117
- Book policy Closed book Closed book
A candidate may register for at most two M&A trade exams in one registration. Each trade exam includes its own set of Business and Law questions.
How the 100 Questions Are Distributed
The Business and Law half follows the PSI outline:
- Business and Law area Questions
- Regulatory and statutory requirements 13
- Insurance, bonds, and liens 11
- Contracts 7
- Project management and administration 6
- Accounting and finance 6
- Types of business organization 4
- Personnel 2
- Estimating 1
The roofing half follows the PSI Roofing content outline (effective March 14, 2019):
- Roofing area Questions
- Materials and installation 18
- Planning and estimation 12
- Safety and public protection 11
- Ventilation systems 5
- Repair 4
Two lessons follow from these tables. Business and Law is worth exactly half the exam, so you cannot pass on trade knowledge alone. Within the roofing half, installation, estimating, and MIOSHA safety together account for 41 of the 50 questions.
Getting Authorized and Scheduling
You cannot book the exam until LARA approves your license application. The sequence works like this:
Complete the 60 hours of approved prelicensure education (see Section 1.3).
Submit the license application to LARA through its online licensing system.
After LARA approves you, it sends your information to PSI.
Register and pay PSI online or by phone. Walk-in testing is not allowed.
Test at a PSI center. The bulletin lists centers in Dearborn, Holt (Lansing), two in Southfield, Grand Rapids, Gaylord, and Marquette.
You may reschedule or cancel without losing the fee if PSI receives notice at least 2 days before the exam date. Voicemail and email do not count as notice. You forfeit the fee if you miss the appointment, arrive after the start time, or lack proper ID. Bring one valid, unexpired, government-issued photo ID with your signature, and make sure the name matches your registration.
Test-Day Rules
The exam is closed book . No codebooks, notes, or reference materials are allowed.
Calculators must be silent, battery-powered, and without paper tape or an alphabetic keyboard. PSI specifically bans construction calculators that convert feet and inches, such as the Construction Master I and II, Handyman, and Measure Maker.
Phones, smart watches, bags, hats not worn for religious reasons, and bulky coats go into storage.
A tutorial of up to 15 minutes does not count against your time.
You may return to earlier questions and change answers while time remains.
Up to 10 experimental questions may be included. They are not identified, do not count, and do not reduce your time.
Extra time (time and a half) and a reader are available as accommodations for a $50 fee each.
Scores, Retakes, and Deadlines
If you pass, the score report says only PASS. If you fail, you see a score for each major content area, which you can use to plan your restudy. PSI does not offer a post-exam review, but you can leave comments on individual questions during the test. Retest fees are the same as first-time fees, and you must retake the full combination exam.
Two deadlines matter. Under MCL 339.409(3) and R 338.1521(1) , you must finish every licensure requirement, including passing the exam, within 1 year after LARA receives your application. Otherwise the application is void and the fee is forfeited. Under R 338.1521(2) , a passing score is valid for 1 year from the date you pass.
Building a Study Plan
PSI's suggested references include the 2015 Michigan Residential Code , MIOSHA construction standards, the Occupational Code and its administrative rules, the Construction Lien Act, NRCA roofing manuals, and Roofing Construction and Estimating . Split your time evenly between law and trade, because each is 50 questions. Practice the arithmetic by hand with a basic calculator: slope factors, squares, bundle counts, ventilation area, and markup.