Study guide
7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System
Michigan Roofing Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Exam & Michigan Licensing Law
1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules 1.2 Who Must Be Licensed: Residential Builder vs. M&A Roofing & the Exemptions 1.3 Prelicensure Education, Application, Renewal & Continuing Competency 1.4 Company Licenses, Qualifying Officers, Salespersons & Reporting Changes 1.5 Rules of Conduct: Place of Business, Advertising, Written Agreements & Records 1.6 Complaints, Investigations, Hearings, Arbitration & Penalties
2 Chapter 2: Codes, Permits, Civil Rights & Environmental Rules
2.1 The State Construction Code, Permits & Inspections 2.2 Civil Rights, Fair Housing, ADA & Michigan Barrier-Free Design 2.3 EPA Hazardous-Materials Rules: Lead-Safe Renovation, Asbestos & Radon
3 Chapter 3: Business Organization, Contracts & In-Home Sales
3.1 Types of Business Organization: Sole Proprietorship, Partnership, LLC & Corporation 3.2 Contract Essentials: Requirements, Types, Terminology & When a Contract Binds 3.3 Addenda, Change Orders, Allowances, Schedules, Warranties, Financing & Breach 3.4 In-Home Sales: The Home Solicitation Sales Act & Door-to-Door Roofing Sales
4 Chapter 4: Project Management, Accounting, Taxes & Personnel
4.1 Project Management & Administration: Quality, Logistics, Schedules, Draws & Retainage 4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios 4.3 Payroll & Tax Obligations: Federal, Michigan, Unemployment & Sales/Use Tax 4.4 Personnel: MIOSHA Administration, Recordkeeping, Wages, Minors & Benefits
5 Chapter 5: Insurance, Bonds & Construction Liens
5.1 Insurance for Roofing Contractors: Liability, Workers' Compensation, Vehicles, Property & Builders' Risk 5.2 Bonds, Public Works Bonding & the Building Contract Fund Act 5.3 Construction Lien Act I: Notices of Commencement & Furnishing, Sworn Statements & Waivers 5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections
6 Chapter 6: Roofing Safety & Public Protection (MIOSHA)
6.1 MIOSHA Part 45 Fall Protection & Personal Fall Arrest Systems 6.2 Guardrails, Safety Nets, Warning Lines, Safety Monitors, Covers & Fall Protection Plans 6.3 Ladders, Scaffolds, Roof Brackets & Aerial Lifts (MIOSHA Parts 11, 12 & 32) 6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat 6.5 Hoisting & Lift Equipment, Fire Prevention, PPE, Barricades, Debris & Recycling
7 Chapter 7: Planning, Structure & Estimating
7.1 Roof Types, Framing Terminology & Structural Loads 7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System 7.3 Roof Geometry, Slope, Pitch & Slope Factors for Measuring Roofs 7.4 Material Takeoffs: Squares, Bundles, Waste, Underlayment, Ice Barrier, Metals & Fasteners 7.5 Labor, Subcontractor & Access Costs and Preparing the Estimate
8 Chapter 8: Tear-Off, Deck Preparation & Underlayment
8.1 Roof Sheathing: Panel Grades, Spans, Edge Support & Nailing 8.2 Tear-Off vs. Recover, Reroofing Rules & Preparing the Site (MRC R908) 8.3 Michigan's Ice Barrier Requirement: Coverage, Materials & Detailing (R905.1.2) 8.4 Underlayment: Standards, Application by Slope & Attachment (R905.1.1) 8.5 Roof & Ceiling Insulation, Vapor Retarders, Air Sealing & Unvented Assemblies
9 Chapter 9: Steep-Slope Roof Systems
9.1 Asphalt Shingles: Types, ASTM D3462, Wind Classes, Impact & Fire Ratings 9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps 9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys 9.4 Metal Roof Systems, Tile, Slate & Wood Shingles and Shakes
10 Chapter 10: Low-Slope Roof Systems & Drainage
10.1 Single-Ply Membranes: EPDM, TPO & PVC 10.2 Built-Up Roofing & Modified Bitumen: Materials, Application, Kettles & Torch Safety 10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding
11 Chapter 11: Flashings, Transitions & Penetrations
11.1 Drip Edge & Roof-Edge Metals (R905.2.8.5 and R903.2) 11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions 11.3 Chimneys & Crickets, Skylights, Pipes, Flues, Exhaust Vents & Solar
12 Chapter 12: Ventilation, Inspection & Repair
12.1 Attic Ventilation Requirements & Net Free Vent Area Calculations (MRC R806) 12.2 Balanced Airflow, Vent Installation Practice & Preventing Ice Dams 12.3 Roof Inspections, Leak Diagnosis, Repairs & Roofovers
7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System
Key Takeaways Explain This Topic AI
A pre-job walk-through checks access, the roof's condition and layers, penetrations, landscaping, loading and tear-off areas, overhead power lines, and safety requirements.
Roof plans show slopes, ridges, hips, valleys, and penetrations, while details show how edges, walls, and penetrations are flashed, and specifications list materials and methods.
Every Michigan shingle-type roof needs an ice barrier from the eave to at least 24 inches inside the exterior wall line, because Michigan's design table marks ice barrier as required.
Roof covering choice depends on minimum slope: asphalt shingles need 2:12, metal shingles and wood shingles or shakes 3:12, slate 4:12, and built-up and membrane systems 1/4:12.
Enhanced manufacturer warranties usually require the manufacturer's specified components, a credentialed installer, and registration within the manufacturer's deadline.
Last updated: September 2026
The Pre-Job Walk-Through
PSI's outline lists this task as "Conduct pre-job walk-through to determine access, roof's condition, roof penetrations, landscaping issues, loading and tear-off areas, and safety requirements." A practical checklist:
Area Check
Access Driveway width for trucks and dumpsters, overhead wires, gates, and neighbor property. Where ladders, hoists, or a conveyor will go
Roof condition Number of existing layers (probe at a rake or vent), soft spots, sagging, granule loss, curling, rot at eaves, and prior repairs
Attic Ventilation, insulation depth, baffles, bath fans venting into the attic, stains, mold, and daylight at the deck
Penetrations Chimneys (width across the slope decides whether a cricket is needed), skylights, plumbing vents, flues, exhaust fans, satellite dishes, solar
Walls and edges Sidewalls, headwalls, dormers, kick-out locations, drip edge, gutters, and fascia condition
Landscaping and property Shrubs, flower beds, AC condensers, decks, pools, vehicles, and windows under the drop zone
Loading and tear-off areas Where bundles can be staged over framing and at least 6 feet from unguarded edges, and where debris will be dropped
Safety Roof slope and eave height (fall protection method), anchor locations, power-line clearance, skylights and holes, and weather exposure
Hazardous materials Pre-1978 painted trim (lead rules) and suspect asbestos felts or cement shingles
Other trades Chimney repair, gutter replacement, electrical (PV), and HVAC vents that must be done or coordinated before roofing
Photograph existing conditions, including cracked driveways, dented gutters, and interior stains. This protects both you and the owner.
Reading Plans, Details, and Specifications
Roof plan: a view from above showing ridges, hips, valleys, slopes (often as a slope triangle such as 6 over 12), overhangs, drains, and penetrations. Dimensions are horizontal projections , so apply a slope factor (Section 7.3).
Elevations: show eave and ridge heights, which help with fall protection and ladder planning.
Sections and details: drawn at larger scale to show eave assemblies (drip edge, ice barrier, vents), wall intersections (step flashing, counterflashing), valleys, curbs, and crickets.
Specifications: product names, ASTM standards, underlayment type and coverage, fastener type and schedule, flashing metal and gauge, and warranty.
Scale: a roof plan at 1/4 inch = 1 foot means each 1/4 inch on paper equals 1 foot. A 9-inch line is 36 feet.
Satellite and drone measurement reports: convenient for existing roofs, but verify pitches and key dimensions on site before ordering.
Permits
Obtain the permit the local enforcing agency requires before starting (MRC R105.1). Reroofing is not on the R105.2 exempt list. Keep the permit on site (R105.7), and schedule required inspections. LARA's homeowner guidance recommends that contracts say the contractor will obtain all required permits.
- Selecting the Roof System
- 1. Slope Decides What Is Allowed
- Roof covering Minimum slope (2015 MRC)
- Asphalt shingles 2:12 . Double underlayment from 2:12 up to 4:12 (R905.2.2)
- Clay and concrete tile 2 1/2:12. Double underlayment from 2 1/2:12 to 4:12 (R905.3.2)
- Metal roof shingles 3:12 (R905.4.2)
- Mineral-surfaced roll roofing 1:12 (R905.5.2)
- Slate 4:12 (R905.6.2)
- Wood shingles, wood shakes 3:12 (R905.7.2, R905.8.2)
- Metal panels 3:12 lapped without sealant. 1/2:12 lapped with sealant. 1/4:12 standing seam (R905.10.2)
- Built-up, modified bitumen, single-ply, spray foam, liquid-applied 1/4:12, or 1/8:12 for coal-tar built-up
- 2. Michigan Climate Requirements
Ice barrier is required statewide on the roof coverings listed in R905.1.2, including shingles, metal shingles, slate, wood shingles, and shakes. It runs from the eave to at least 24 inches inside the exterior wall line, and at least 36 inches up the slope on roofs 8:12 and steeper (Section 8.3).
Wind: asphalt shingles must be labeled to ASTM D7158 or D3161 classes suited to the wind speed (Section 9.1).
Snow load and structure: heavy coverings and extra layers need structural confirmation, and engineering above 70 psf.
Ventilation or unvented design: attic ventilation at 1/150 or 1/300, or an unvented assembly with the required insulation (Chapter 12 and Section 8.5).
Energy code: ceiling insulation of R-38 in zone 5A and R-49 in zones 6A and 7 when insulation is part of the work (Section 8.5).
3. Owner Needs and Warranties
Discuss appearance, budget, expected service life, noise, hail resistance (UL 2218 Class 4 for impact resistance), reflectivity, and resale. Explain the difference between a manufacturer's standard limited warranty, which usually covers materials and is prorated after an initial period, and an enhanced system warranty . Enhanced warranties generally require:
- the manufacturer's specified accessory components (starter, underlayment, ridge cap, ventilation);
- installation by a contractor the manufacturer has credentialed;
registration within the manufacturer's stated deadline, often with a fee.
Your own workmanship warranty covers installation errors. Define its term and exclusions in the contract (Section 3.3).
4. Match the Components
Selecting a roof means choosing a compatible system: deck, insulation (if any), underlayment, ice barrier, flashings, drip edge, ventilation, and the covering. The MRC requires materials to be compatible with each other and the building (R904.2) and installed per the manufacturer's instructions (R904.1).
Example Decision
A 1960s ranch in Kent County has a 3:12 roof and two existing shingle layers. The owner wants architectural shingles. At 3:12, shingles are allowed only with double underlayment or a full self-adhered alternative. The two existing layers require a full tear-off (R908.3.1.1). Kent County is climate zone 5A, so ventilation can use 1/300 only through balanced upper and lower vents, not the vapor retarder option (Section 12.1). Include ice barrier, drip edge, and a unit price for deck replacement in the bid.