6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat
Michigan Roofing Contractor Exam
Track your progress as you read
Finished sections get a check mark.
1 Chapter 1: The Exam & Michigan Licensing Law
1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules 1.2 Who Must Be Licensed: Residential Builder vs. M&A Roofing & the Exemptions 1.3 Prelicensure Education, Application, Renewal & Continuing Competency 1.4 Company Licenses, Qualifying Officers, Salespersons & Reporting Changes 1.5 Rules of Conduct: Place of Business, Advertising, Written Agreements & Records 1.6 Complaints, Investigations, Hearings, Arbitration & Penalties
2 Chapter 2: Codes, Permits, Civil Rights & Environmental Rules
2.1 The State Construction Code, Permits & Inspections 2.2 Civil Rights, Fair Housing, ADA & Michigan Barrier-Free Design 2.3 EPA Hazardous-Materials Rules: Lead-Safe Renovation, Asbestos & Radon
3 Chapter 3: Business Organization, Contracts & In-Home Sales
3.1 Types of Business Organization: Sole Proprietorship, Partnership, LLC & Corporation 3.2 Contract Essentials: Requirements, Types, Terminology & When a Contract Binds 3.3 Addenda, Change Orders, Allowances, Schedules, Warranties, Financing & Breach 3.4 In-Home Sales: The Home Solicitation Sales Act & Door-to-Door Roofing Sales
4 Chapter 4: Project Management, Accounting, Taxes & Personnel
4.1 Project Management & Administration: Quality, Logistics, Schedules, Draws & Retainage 4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios 4.3 Payroll & Tax Obligations: Federal, Michigan, Unemployment & Sales/Use Tax 4.4 Personnel: MIOSHA Administration, Recordkeeping, Wages, Minors & Benefits
5 Chapter 5: Insurance, Bonds & Construction Liens
5.1 Insurance for Roofing Contractors: Liability, Workers' Compensation, Vehicles, Property & Builders' Risk 5.2 Bonds, Public Works Bonding & the Building Contract Fund Act 5.3 Construction Lien Act I: Notices of Commencement & Furnishing, Sworn Statements & Waivers 5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections
6 Chapter 6: Roofing Safety & Public Protection (MIOSHA)
6.1 MIOSHA Part 45 Fall Protection & Personal Fall Arrest Systems 6.2 Guardrails, Safety Nets, Warning Lines, Safety Monitors, Covers & Fall Protection Plans 6.3 Ladders, Scaffolds, Roof Brackets & Aerial Lifts (MIOSHA Parts 11, 12 & 32) 6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat 6.5 Hoisting & Lift Equipment, Fire Prevention, PPE, Barricades, Debris & Recycling
7 Chapter 7: Planning, Structure & Estimating
7.1 Roof Types, Framing Terminology & Structural Loads 7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System 7.3 Roof Geometry, Slope, Pitch & Slope Factors for Measuring Roofs 7.4 Material Takeoffs: Squares, Bundles, Waste, Underlayment, Ice Barrier, Metals & Fasteners 7.5 Labor, Subcontractor & Access Costs and Preparing the Estimate
8 Chapter 8: Tear-Off, Deck Preparation & Underlayment
8.1 Roof Sheathing: Panel Grades, Spans, Edge Support & Nailing 8.2 Tear-Off vs. Recover, Reroofing Rules & Preparing the Site (MRC R908) 8.3 Michigan's Ice Barrier Requirement: Coverage, Materials & Detailing (R905.1.2) 8.4 Underlayment: Standards, Application by Slope & Attachment (R905.1.1) 8.5 Roof & Ceiling Insulation, Vapor Retarders, Air Sealing & Unvented Assemblies
9 Chapter 9: Steep-Slope Roof Systems
9.1 Asphalt Shingles: Types, ASTM D3462, Wind Classes, Impact & Fire Ratings 9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps 9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys 9.4 Metal Roof Systems, Tile, Slate & Wood Shingles and Shakes
10 Chapter 10: Low-Slope Roof Systems & Drainage
10.1 Single-Ply Membranes: EPDM, TPO & PVC 10.2 Built-Up Roofing & Modified Bitumen: Materials, Application, Kettles & Torch Safety 10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding
11 Chapter 11: Flashings, Transitions & Penetrations
11.1 Drip Edge & Roof-Edge Metals (R905.2.8.5 and R903.2) 11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions 11.3 Chimneys & Crickets, Skylights, Pipes, Flues, Exhaust Vents & Solar
12 Chapter 12: Ventilation, Inspection & Repair
12.1 Attic Ventilation Requirements & Net Free Vent Area Calculations (MRC R806) 12.2 Balanced Airflow, Vent Installation Practice & Preventing Ice Dams 12.3 Roof Inspections, Leak Diagnosis, Repairs & Roofovers
6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat
Key Takeaways Explain This Topic AI
MIOSHA's Hazard Communication standard requires a written program, Safety Data Sheets available to workers, labeled containers, and training for every hazardous chemical on the job.
Safety Data Sheets follow a standard 16-section format, and Section 7 covers handling and storage, Section 8 exposure controls and PPE, and Section 13 disposal.
MIOSHA Part 690 sets a respirable crystalline silica action level of 25 µg/m³ and a permissible exposure limit of 50 µg/m³, and Table 1 lists approved controls such as water-fed saws.
Material stored near power lines up to 50 kV must be kept 10 feet away plus the length of the material, and equipment and ladders must keep MIOSHA's required clearances.
Michigan has no specific heat standard, but the employer's general duty to prevent recognized hazards calls for water, rest, shade, acclimatization, and emergency response.
Last updated: September 2026
Hazard Communication
MIOSHA's Hazard Communication standard for construction (Part 42, combined with the general industry and occupational health versions) follows the federal Globally Harmonized System approach. Roofing employers must:
Keep a written hazard communication program that lists the hazardous chemicals on site and explains labels, Safety Data Sheets (SDS), and training.
Keep an SDS for each hazardous product readily accessible to workers on every shift. A binder in the truck or an electronic device works if workers can reach it.
Make sure containers are labeled , including secondary containers such as a squeeze bottle of cleaner or a bucket of primer.
Train workers before they are exposed and whenever a new hazard is introduced.
Common roofing chemicals include asphalt primers and cutback cements, solvent-based EPDM and TPO adhesives and seam primers, TPO and PVC cleaners, polyurethane foam adhesives, silicone and acrylic coatings, spray foam, and propane.
Reading an SDS
- SDS section Use it for
- 2 Hazards identification Signal word ("Danger" or "Warning"), pictograms, hazard statements
- 4 First-aid measures What to do if a worker is splashed or overcome by vapors
- 5 Fire-fighting measures Extinguishing media. Critical for flammable adhesives near torches
- 7 Handling and storage Ventilation, ignition sources, temperature limits
- 8 Exposure controls and PPE Gloves, eye protection, respirator type
- 13 Disposal considerations How to dispose of leftovers and empty containers
A GHS label shows the product identifier, signal word , hazard statements , pictograms , precautionary statements , and supplier information.
Respirable Crystalline Silica (MIOSHA Part 690)
Cutting or grinding concrete or clay tile, slate, fiber-cement shingles or panels, and masonry (for example, cutting a chimney reglet) releases respirable crystalline silica. Part 690 sets an action level of 25 µg/m³ and a permissible exposure limit of 50 µg/m³ , both as 8-hour time-weighted averages. Employers may follow Table 1 instead of measuring exposure. Table 1 examples:
Handheld power saws on silica materials: an integrated water delivery system that continuously feeds water to the blade. Outdoors, no respirator is needed for 4 hours or less per shift, and an APF 10 respirator is needed beyond 4 hours.
Handheld saws for fiber-cement board (blade 8 inches or less): outdoors only , with a dust collection system and the tool manufacturer's recommended airflow, and no respirator required.
Tuckpointing and grinding: a shroud with a HEPA-filtered vacuum, plus the listed respirator.
Dry cutting tile while wearing a paper mask does not comply.
Lead and Asbestos on Tear-Offs
Lead (Part 603): the action level is 30 µg/m³ and the PEL is 50 µg/m³ . Disturbing painted trim on pre-1978 homes also triggers the EPA lead-safe rules (Section 2.3).
Asbestos (Part 602): removing asbestos roofing is Class II work. Keep material intact where feasible, use wet methods when it is not intact, never drop or throw it, and lower it by hand, a covered dust-tight chute, a crane, or a hoist by the end of the shift (Section 2.3).
Coal tar pitch in old built-up roofs is a skin and eye irritant and a carcinogen. Use the SDS controls and PPE during removal.
Overhead Power Lines
Electrocution is one of the leading causes of death in construction, and roofers handle long metal: ladders, drip edge, valley metal, and gutters. MIOSHA sets these distances:
- Situation MIOSHA rule
- Metal ladder use or movement At least 20 feet from power transmission or distribution lines (Part 11)
Ladder, worker, or material near energized lines (de-energizing impractical) 10 feet for lines up to 50 kV, plus 0.4 inch per kV over 50 kV (Part 11)
Material stored near lines Lines up to 50 kV: 10 feet plus the length of the material . Over 50 kV: add 0.4 inch per kV. Designate a worker to watch clearance when the operator cannot judge it (Part 8, R 408.40822)
Cranes, boom trucks, and lifts Follow MIOSHA Part 10 and Part 32 power-line procedures
Assume every line is energized, including the service drop to the house, unless the utility confirms otherwise. Ask the utility to de-energize the line or install insulating covers before working near it.
Heat and Cold Stress
MIOSHA has no specific heat-illness standard. Employers still have a general duty under the MIOSHA Act to protect workers from recognized hazards. For roofing, reasonable practices include:
- plenty of cool drinking water, with workers encouraged to drink often;
- rest breaks in shade, and scheduling heavy tear-off for cooler hours;
- acclimatization for new and returning workers, who should work shorter periods at first;
training on the signs of heat exhaustion (heavy sweating, dizziness, nausea) and heat stroke (confusion, collapse, very high body temperature). Heat stroke is an emergency: call 911 and cool the worker immediately.
In cold weather, frost and ice make underlayment slippery. Some self-adhered products will not bond below their minimum temperature, and cold stiffens shingles. Check the deck before mounting the roof, and dress workers for wind chill.