Study guide

9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps

Michigan Roofing Contractor Exam

Track your progress as you read

Finished sections get a check mark.

1 Chapter 1: The Exam & Michigan Licensing Law

1.1 The Michigan Roofing License Exam: Format, Fees & Test-Day Rules 1.2 Who Must Be Licensed: Residential Builder vs. M&A Roofing & the Exemptions 1.3 Prelicensure Education, Application, Renewal & Continuing Competency 1.4 Company Licenses, Qualifying Officers, Salespersons & Reporting Changes 1.5 Rules of Conduct: Place of Business, Advertising, Written Agreements & Records 1.6 Complaints, Investigations, Hearings, Arbitration & Penalties

2 Chapter 2: Codes, Permits, Civil Rights & Environmental Rules

2.1 The State Construction Code, Permits & Inspections 2.2 Civil Rights, Fair Housing, ADA & Michigan Barrier-Free Design 2.3 EPA Hazardous-Materials Rules: Lead-Safe Renovation, Asbestos & Radon

3 Chapter 3: Business Organization, Contracts & In-Home Sales

3.1 Types of Business Organization: Sole Proprietorship, Partnership, LLC & Corporation 3.2 Contract Essentials: Requirements, Types, Terminology & When a Contract Binds 3.3 Addenda, Change Orders, Allowances, Schedules, Warranties, Financing & Breach 3.4 In-Home Sales: The Home Solicitation Sales Act & Door-to-Door Roofing Sales

4 Chapter 4: Project Management, Accounting, Taxes & Personnel

4.1 Project Management & Administration: Quality, Logistics, Schedules, Draws & Retainage 4.2 Accounting & Finance: Costs, Receivables, Cash Flow, Financial Statements & Ratios 4.3 Payroll & Tax Obligations: Federal, Michigan, Unemployment & Sales/Use Tax 4.4 Personnel: MIOSHA Administration, Recordkeeping, Wages, Minors & Benefits

5 Chapter 5: Insurance, Bonds & Construction Liens

5.1 Insurance for Roofing Contractors: Liability, Workers' Compensation, Vehicles, Property & Builders' Risk 5.2 Bonds, Public Works Bonding & the Building Contract Fund Act 5.3 Construction Lien Act I: Notices of Commencement & Furnishing, Sworn Statements & Waivers 5.4 Construction Lien Act II: Claims of Lien, Foreclosure, Priority & Residential Protections

6 Chapter 6: Roofing Safety & Public Protection (MIOSHA)

6.1 MIOSHA Part 45 Fall Protection & Personal Fall Arrest Systems 6.2 Guardrails, Safety Nets, Warning Lines, Safety Monitors, Covers & Fall Protection Plans 6.3 Ladders, Scaffolds, Roof Brackets & Aerial Lifts (MIOSHA Parts 11, 12 & 32) 6.4 Hazard Communication, SDS, Silica, Lead & Asbestos Exposure, Power Lines & Heat 6.5 Hoisting & Lift Equipment, Fire Prevention, PPE, Barricades, Debris & Recycling

7 Chapter 7: Planning, Structure & Estimating

7.1 Roof Types, Framing Terminology & Structural Loads 7.2 Pre-Job Walk-Through, Plans & Details, Permits & Selecting the Roof System 7.3 Roof Geometry, Slope, Pitch & Slope Factors for Measuring Roofs 7.4 Material Takeoffs: Squares, Bundles, Waste, Underlayment, Ice Barrier, Metals & Fasteners 7.5 Labor, Subcontractor & Access Costs and Preparing the Estimate

8 Chapter 8: Tear-Off, Deck Preparation & Underlayment

8.1 Roof Sheathing: Panel Grades, Spans, Edge Support & Nailing 8.2 Tear-Off vs. Recover, Reroofing Rules & Preparing the Site (MRC R908) 8.3 Michigan's Ice Barrier Requirement: Coverage, Materials & Detailing (R905.1.2) 8.4 Underlayment: Standards, Application by Slope & Attachment (R905.1.1) 8.5 Roof & Ceiling Insulation, Vapor Retarders, Air Sealing & Unvented Assemblies

9 Chapter 9: Steep-Slope Roof Systems

9.1 Asphalt Shingles: Types, ASTM D3462, Wind Classes, Impact & Fire Ratings 9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps 9.3 Valleys: Linings, Open Metal, Closed-Cut & Woven Valleys 9.4 Metal Roof Systems, Tile, Slate & Wood Shingles and Shakes

10 Chapter 10: Low-Slope Roof Systems & Drainage

10.1 Single-Ply Membranes: EPDM, TPO & PVC 10.2 Built-Up Roofing & Modified Bitumen: Materials, Application, Kettles & Torch Safety 10.3 Low-Slope Drainage: Positive Drainage, Roof Drains, Overflow Scuppers & Correcting Ponding

11 Chapter 11: Flashings, Transitions & Penetrations

11.1 Drip Edge & Roof-Edge Metals (R905.2.8.5 and R903.2) 11.2 Sidewalls, Headwalls, Kick-Outs, Counterflashing & Pitch Transitions 11.3 Chimneys & Crickets, Skylights, Pipes, Flues, Exhaust Vents & Solar

12 Chapter 12: Ventilation, Inspection & Repair

12.1 Attic Ventilation Requirements & Net Free Vent Area Calculations (MRC R806) 12.2 Balanced Airflow, Vent Installation Practice & Preventing Ice Dams 12.3 Roof Inspections, Leak Diagnosis, Repairs & Roofovers

9.2 Installing Asphalt Shingles: Starter, Exposure, Nailing, Steep Slopes & Caps

Key Takeaways Explain This Topic AI

Shingle nails must be galvanized steel, stainless steel, aluminum, or copper, with at least a 12-gauge (0.105-inch) shank and a 3/8-inch head, meeting ASTM F1667.

Nails must penetrate at least 3/4 inch into the sheathing, or completely through sheathing thinner than 3/4 inch.

Each strip shingle needs at least 4 fasteners, or 2 per individual shingle, and more where the manufacturer requires. Above 21:12, follow the manufacturer's steep-slope method.

Nails placed above the manufacturer's nail line (high nailing) can miss the underlying course and reduce wind resistance, and overdriven nails cut into the shingle.

The starter course places sealant near the eave so the first course seals down, and shingles typically overhang the drip edge by the small distance the manufacturer specifies.

Last updated: September 2026

Before the First Shingle

Check that the deck is solid and fastened (Section 8.1). Then check the installation sequence: drip edge at the eaves, ice barrier over it (reaching 24 inches inside the wall line), underlayment or double underlayment by slope, drip edge over the underlayment at the rakes, and valley linings in place. Snap horizontal chalk lines for courses and vertical lines for offsets.

Code Minimums

  • Requirement 2015 MRC
  • Deck Solidly sheathed (R905.2.1)
  • Slope 2:12 or greater. Double underlayment from 2:12 to less than 4:12 (R905.2.2)
  • Fastener material Galvanized steel, stainless steel, aluminum, or copper roofing nails (R905.2.5)
  • Fastener size Shank at least 12 gauge (0.105 in) , head at least 3/8 in , meeting ASTM F1667

Penetration Through the roofing and at least 3/4 in into the sheathing . Where sheathing is thinner than 3/4 in, through the sheathing

Number At least the manufacturer's number, and never fewer than 4 per strip shingle or 2 per individual shingle (R905.2.6)

  • Very steep slopes Above 21:12 (175% slope), install as the manufacturer requires
  • Ice barrier Where required (all Michigan homes), per R905.1.2 (R905.2.7)

The code calls for nails , not staples. On a reroof over an existing layer, where a recover is allowed, use nails long enough to reach the required penetration.

Starter Course

The starter course fills the spaces under the first course's cutouts and joints, and it puts sealant at the eave so the first course bonds down. Use the manufacturer's starter product, or cut starter from field shingles the way the instructions describe. The usual approach removes the tabs and places the sealant strip up and near the eave edge . Offset starter joints from the first course's joints. Many manufacturers also call for starter along the rakes to improve wind resistance.

Overhang: Shingles typically overhang the drip edge at eaves and rakes by a small amount, commonly about 1/4 to 3/4 inch, as the manufacturer specifies. Too little lets water wick back. Too much lets the edge sag and catch wind.

Exposure, Offsets, and Alignment

Exposure is the part of each course left exposed to weather. English 3-tab shingles are about 5 inches, and metric laminated shingles about 5 5/8 inches. Use the exposure printed on the wrapper.

Offsets keep joints from lining up course over course, which would create a leak path. Follow the manufacturer's stagger pattern and minimum offset, often at least 4 to 6 inches between adjacent courses.

Alignment: snap lines at intervals to keep courses parallel to the eave and ridge. Don't mix shingles from different manufacturers or sizes on the same roof plane.

Nail Placement and Driving

The manufacturer marks a nail line or nailing zone . On laminated shingles, nails in the zone pass through both layers of the shingle and through the top of the course below.

Error Result

High nailing (above the zone) Can miss the course below and reduce pull-through and wind resistance. A common cause of blow-offs and voided warranties

  • Overdriven The head cuts into the mat, and holding power drops
  • Underdriven The raised head can puncture the shingle above or prevent sealing
  • Angled Part of the head cuts in and part stands up
  • Too few nails Below the code or manufacturer minimum

Set the pneumatic nailer's depth so heads sit flush with the shingle surface. In cold weather, check depth often, because stiffer shingles and colder air pressure change the result.

High-Wind and Steep-Slope Application

Manufacturers publish enhanced nailing (often 6 nails per shingle) for high-wind areas or enhanced warranties, and steep-slope instructions for mansards and slopes above about 21:12. Steep-slope instructions typically call for more nails plus hand-sealing each shingle with spots of asphalt roofing cement. The code defers to the manufacturer above 21:12, and its instructions are enforceable because R905.1 requires following them. Use only a small amount of cement, because too much can blister or bleed.

Cold-Weather Sealing

Sealant strips need warmth and sun. Shingles installed in late fall may not seal until spring. Many manufacturers require hand-sealing below a stated temperature or in windy exposures. Handle cold shingles carefully, because they crack when bent.

Hips and Ridges

Use the manufacturer's hip and ridge cap shingles, or cap cut as instructed from 3-tab shingles. Laminated field shingles are generally not suitable for caps.

Apply caps starting at the bottom of each hip, and on the ridge from the end away from the prevailing wind, with the exposure and nail length the manufacturer specifies.

With a ridge vent , install the vent over the slot per its instructions, then cap over the vent with longer nails (Section 12.2).

Flashing Tie-In

Base and cap flashing for shingles is corrosion-resistant metal at least 0.019 inch thick (base flashing may also be mineral-surfaced roll roofing of at least 77 pounds per 100 square feet), installed per the manufacturer (R905.2.8.1). Sidewalls use step or continuous base flashing at least 4 by 4 inches (R905.2.8.3). Vent pipes, front walls, and chimneys follow the shingle manufacturer's printed instructions (R905.2.8.4). Chapter 11 covers these details.

Final Inspection Checklist

Check straight courses and proper offsets, no exposed nails except where the instructions allow, correct overhangs, sealed tabs or hand-sealing where needed, clean valleys, secure flashings, open vents, and a magnetic sweep of the grounds.